Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Study of the Macro-Scale Solute Redistribution due to Liquid Metal Feeding during the Solidification of A356

    By D. M. Maijer, S. L. Cockcroft, A. B. Phillion, P. Fan, C. Reilly, H. Khadivinassab

    A combined experimental / numerical approach is proposed to investigate the bulk transfer of solute due to liquid metal feeding during shape casting of aluminum alloy A356 (Al-7Si-0.3Mg). A dumbbell-s

    Jan 1, 2014

  • CIM
    Mill Expansion at Les Mines Selbaie

    By K. Wood, L. Duval

    "The paper discusses the approach used to add a new, separate 5000 t/d copper-zinc treatment circuit to an existing, 1650 t/d copper circuit, essentially within the existing mill building. Temporary i

    Jan 1, 1987

  • CIM
    Monitoring Insights from a Ventilation on Demand Collaborative Research Initiative

    By Stephen Hardcastle

    Presentation Outline ? Introduction ? Mine Ventilation Facts ? Ventilation-on-demand (VOD) ? Sensors/Controls ? Continuing Work ? Conclusions ? Mine ventilation engineering practices were publ

    Nov 1, 2011

  • CIM
    Columbium-Uranium Deposits at North Bay, Ontario

    By J. E. Gill

    Discovered in 1952, the deposits have been explored by diamond drilling on and near a group of islands in lake Nipissing and from under-ground workings. The ore mineral is a uranian pyrochlore. It occ

    Jan 1, 1957

  • CIM
    Electrochemical Behavior of Axj530 Magnesium Alloy in Neutral Medium

    By S. Amira

    The corrosion behavior of high pressure die-cast and thixocast AXJ530 magnesium alloys has been investigated in 0.05M NaC1 solution at pH 6.0 using potentiodynamic polarization tests, electrochemical

    Jan 1, 2006

  • CIM
    In-Situ Measurements of Cemented Paste Backfill in Long-hole Stopes

    By Ben D. Thompson

    Cemented Paste Backfill has proven to be of critical importance to the operation of a number of Canadian mines, primarily due to the rapid backfilling rate this method permits. In order to improve the

    May 1, 2009

  • CIM
    Geochemical profile of till from Longlac, Ontario to Somerset Island

    By William W. Shilts

    "In carrying out a geotechnical survey of a proposed gas pipeline route from the Arctic Islands south to Longlac, Ontario, the Polar Gas Consortium contracted the drilling of several hundred 2- to 2D-

    Jan 1, 1980

  • CIM
    L'entretien de I'equipement minier dans les mines à ciel ouvert

    By Gaston Gingras

    "IntroductionL'entretien de l'equipement minier dans les mines à ciel ouvert est une activité qui est aussi vieille que I'existence des mines et qui a progressé au cours des années pour

    Jan 1, 1988

  • CIM
    Use of the Similarity Principle in Predicting the Optimum Performance of Iron Reduction Kilns

    According to the principle of similarity, the physical and chemical configurations of a system can be defined by ratios of magnitudes within the system and do not de-pend on the size or nature of unit

    Jan 1, 1964

  • CIM
    Penasquito Project ?Achieving Success in Challenging Times

    CHALLENGES TO SCHEDULE/BUDGET Shortage of people (contractors, vendor support, engineering, staff) 2007 projects off the shelf Increase in metals prices Shortage of large tires Reserve increase

    May 1, 2010

  • CIM
    Effects of Grain Size on the Bendability of AA6016 Automotive Sheets

    By X. X. Wu, Q. Zhang, R. H. Fan, Y. J. Feng, J. D. Liu, P. Z. Zhao

    In the present study, AA6016 automotive sheets with different grain size were fabricated through changing fabricating parameters, and the effects of grain size on the bendability were studied by bendi

    Jan 1, 2015

  • CIM
    Geological Setting and Characteristics of the Red Chris Porphyry Copper-gold Deposit, Northwestern British Columbia

    By C. H. Ash

    "Abstract-The Red Chris Cu-Au deposit (522.7 Mt at 0.35% Cu and 0.27 g/t Au), northwestern British Columbia, is one of several pre-accretionary porphyry systems in the Cordillera of western Canada. It

    Jan 1, 1997

  • CIM
    ANCIENT VOLCANOGENIC MASSIVE SULFIDE DEPOSITS IN CHINA - Geological Setting and Features of the Ashele Cu-Zn Deposit, Xinjiang, China

    By Denghong Wang

    Abstract- The Ashele Cu-Zn deposit is a recently discovered volcanogenic massive sulfide deposit in Xinjiang, China, hosted by Lower to Middle Devonian submarine bimodal volcanic rocks. The primary or

    Jan 1, 1999

  • CIM
    Failure Physics and its Importance in IVHM

    By Zhong Zhang, Xijia Wu, Prakash C. Patnaik

    "The integrated vehicle health management (IVHM) aims to provide life cycle management decisions for military platforms and their propulsion systems with reduced life cycle cost and increased operatio

    Jan 1, 2015

  • CIM
    Nanocrystalline Cellular Materials

    By G. D. Hibbard

    New regions of material property space can be accessed by combining microstructural design at the nm-scale with architectural design at the µm- or mm-scale. In the first case, large strength increases

    Jan 1, 2010

  • CIM
    Spontaneous Combustion of Coal

    By T. Scully

    Since early days in coal mining, it has been known that some coals and the carbonaceous materials associated with them will heat and fire spontaneously. Many theories have been advanced to account for

    Jan 1, 1931

  • CIM
    Advantages of the Collaborative R&D Model

    By Anthony T. Eyton

    Intelligent Systems: Advantages for Mining ? Increased safety (reduced risk to workers) ? Increased productivity (reduced downtime) ? Reduced maintenance costs ? Customized solutions for differen

    May 1, 2002

  • CIM
    The Victor Project ? Ontario?s First Diamond Mine

    Agenda ? Where?s Victor ? What work was done to get approval to spend $982m ? a brief history ? Some project facts ? The triple bottom-line accomplishments to date ? Construction A Brief History

    May 1, 2006

  • CIM
    Stochastic Stability Analysis of Mine Developments with Respect to Planned Mining Sequence

    By W. Abdellah

    Underground mine developments, such as haulage drifts and cross cuts, play a vital role in providing access to ore extraction areas for mine production. The stability of mine developments is thus of c

    Aug 1, 2013

  • CIM
    Error Associated with the use of Triaxial Rock Strength Criteria when Assessing the Stability of Underground Openings

    By J. P. Harrison, R. Roostaei

    "In this paper we investigate the consequences of using conventional triaxial peak strength criteria in the polyaxial stress conditions that occur around the end of a long circular underground opening

    Jan 1, 2015