Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Silver Flotation from the Kidd Creek Grinding Circuit

    By W. M. Scheding

    "There has recently been a resurgence of interest in unit flotation of mill discharges. At the Kidd Creek concentrator, this technique has been successfully applied to silver flotation in a 3050 mtpd

    Jan 1, 1985

  • CIM
    New Initiatives in Swedish Mining Research and Development

    By Göran Bäckblom

    The Swedish mining companies LKAB and Boliden, the equipment supplier Atlas Copco, the general contractor NCC and the specialist company Reflex joined forces in 2005 to advance the field of rock techn

    May 1, 2006

  • CIM
    Mitigating Brown Field Project Risks Using Advanced Simulations

    By S. Bellec, A. Berton

    "Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p

    Jan 1, 2015

  • CIM
    Research and the Coal Industry in Canada

    By W. A. Lang

    Introduction That the coal industry has entered a new phase in its development is now evident. Coal, besides being the chief source of heat and power, has become a potential raw material for many i

    Jan 1, 1946

  • CIM
    Computer Control Experiments at Lake Dufault

    By H. W. Smith, C. L. Lewis

    "A process control computer has been installed in the Lake Dufault concentrator to: (a) control the on-stream X-ray analyzer and convert chart readings to elemental percentages, (b) calculate the flow

    Jan 1, 1969

  • CIM
    Sustainable Optimisation of the Bell Creek Sag Mill

    By T. Banerjee, D. Felsher, G. Leavoy

    "Lake Shore Gold is engaged in commercial gold production at both the Timmins West and Bell Creek mines, located in Timmins, Ontario. Run of mine ore is processed at the Bell Creek mill which consists

    Jan 1, 2015

  • CIM
    Magnetic Gold: Losses from a Gold Recovery Circuit

    By Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher

    A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl

    Jan 1, 2014

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • CIM
    Demonstration Campaign Results on a Cyanide-Free Process for Gold Extraction from a Refractory Pyrite Concentrate

    By A. Drouin, D. Lemieux, C. Chouinard

    "A gold bearing pyrite concentrate was treated at the demonstration scale (15 t/d) for the extraction of gold using a cyanide-free process. The pyrite was depressed in the flotation circuit in order t

    Jan 1, 2017

  • CIM
    Iron in Arsenic Removal - From Traditonal Arsenic Precipitation to Novel Electrochemical Processes

    By M. Arvola, A. Mäkinen, N. Isomäki

    Arsenic is a compound that has no significant market value. However, it needs to be removed from ores, concentrates and other process streams because of environmental or technical processing concerns.

    Jan 1, 2016

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure (4c0ad050-3f5c-4d02-9b1c-381b1fa8e9bb)

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of shatter-coned

    Jan 1, 1997

  • CIM
    The Tectonic, Magmatic and Mineralization History of the Sudbury Structure

    By Harold L. Gibson, Don H. Rousell, Ian R. Jonasson

    "Abstract - The Sudbury Structure consists of three major components: 1) the Sudbury Basin; 2) the Sudbury Igneous Complex which surrounds the basin as an elliptical collar; and 3) an outer zone of sh

    Jan 1, 1997

  • CIM
    Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian Mines

    By Michael I. Brittan, Craig M. Sams

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si

    Jan 1, 2006

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • CIM
    Review of Self-Heating Testing Methodologies

    By J. E. Nesset, F. Rosenblum, J. A. Finch

    "The self-heating of sulphides can be a major hazard in mining operations and concentrate handling, particularly during transportation and associated storage. Self-heating results from the oxidation o

    Jan 1, 2014

  • CIM
    Horses for Courses – Tailoring Front End Design to Project Requirements

    By Paul Staples, Paul Messenger, Greg Lane

    "Every project is different. While “conventional” SAG and ball mill circuits will suit many projects, for others there are alternatives, which may produce improved outcomes. This paper examines partic

    Jan 1, 2008

  • CIM
    Sulphide Deposits 1n Saskatchewan

    By A. R. Byers

    "This paper describes the distribution, occurrence, and paragenesis of known sulphide deposits within an area bounded by longitudes 102°00' to 106°00' west and latitudes 54 ° 301 to 57 °00 1 north. Th

    Jan 1, 1960

  • CIM
    Status of Repairs on Two Grinding Mills At Holt-McDermott

    By Pierre Beaudoin

    "This paper deals with the repairs made on two damaged mills. It investigates briefly the causes of the damage, explain its nature and the design of the repair. It explains the detrimental effect on o

    Jan 1, 2001

  • CIM
    Process Development at the Raglan Concentrator

    By Joe Holmes, Peter Langlois

    "Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high

    Jan 1, 2001