Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rehabilitation at the Macraes Gold Project: from Pit to Park

    Gold mineralisation at the Macraes Gold Project is hosted in the Hyde-Macraes shear zone and can be traced for ~30km along strike, although economic resources are confined to a 7 km section in the vic

    Jan 1, 2002

  • AUSIMM
    The Broken Hill Lode û Its Geological Structure

    Perhaps no aspect of the investigation of an ore-deposit is of greater importance to the mining geologist and engineer than a consideration of its geological structure. A thorough understanding of the

    Jan 1, 1932

  • AUSIMM
    The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)

    The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/

    Jan 1, 1984

  • AUSIMM
    The Design of Multi-Seam Workings at Shallow Depth Under Tidal Waters

    By Anderson KG

    Multi-seam mining under the western portion of Lake Macquarie NSW commenced in 1982. Up to three seams separated by partings ranging from 10 to 30 metres are mined simultaneously by Newcom Collier

    Jan 1, 1986

  • AUSIMM
    The Recognition of Pseudoclastic Textures in Hydrothermally Altered Subaqueous Dyke Rocks and Lavas: Some Economic Implications (c681d837-054d-4ce2-9554-1af8f4a6e5d4)

    By Waters JC

    Pseudoclastic hydrothermal alteration textures occur within quenched coherent dykes forming part of a subaqueous dome complex (-4 Ma) on Ponza Island, Italy. These textures are similar to those obser

    Jan 1, 1995

  • AUSIMM
    Control of Calcium Based Scales in Australian Mineral Processing

    By Grace B, Cunningham D

    The poor quality of bore waters available to the Australian mineral processing industry creates a climate for crystallization of calcium based scales. If ignored, calcite and/or gypsum buildup can c

    Jan 1, 1991

  • AUSIMM
    Evaluation of Heavy Medium Cyclone Performance at the Hamersley Iron Mount Tom Price Concentrator

    By Gomm SA

    The Mount Tom Price Concentrator, which contains a heavy medium cyclone plant for beneficiation of the -6+0.5mm fraction of low grade iron ore, is described. Testwork was carried out on an opportun

    Jan 1, 1987

  • AUSIMM
    Application Of In-The-Hole Hammer Drilling At The C. S. A. Mine, Cobar

    The last two years have seen a rapid change-over from mechanised cut and fill. stoping to the more economic and productive long hole open stoping method, such that today more than 80 per cent of to

    Jan 1, 1977

  • AUSIMM
    Ironstone-Related Gold-Copper Mineralisation : Tennant Creek and Elsewhere

    By Valenta R. K

    Copper-gold deposits associated with iron oxide rich rocks (ironstones) form a distinctive and significant ore association which occurs widely, but not exclusively, in the Proterozoic. The ironstone a

    Jan 1, 1990

  • AUSIMM
    Errors in Sampling Rock Fragmentation from Images

    The basic purpose of blast design is to produce rock in a size range which is within the requirements of the materials handling system. Once this is achieved, one would like to find the fragmentation

    Jan 1, 1976

  • AUSIMM
    Technical Feasibility Studies and Uses of Treated Acid Mine Drainage at Kingsmill Tunnel, Peru

    By J Chßvez, J Rosa del Castillo, J Rui

    Environmental Impact Assessment (EIA) and Feasibility Studies (FS) were carried out to evaluate the potential use of treated acid mine drainage (AMD) occurring at the Kingsmill Tunnel in the Central A

    Jan 1, 2003

  • AUSIMM
    Feasibility Studies - Scope and Accuracy

    Feasibility is a value improvement process for projects. At any stage in project development, a feasibility study can be undertaken, but although the scope generally remains unchanged the extent of

    Jan 1, 1997

  • AUSIMM
    Squeezing More Out of Your Orebody at Wallaby

    By M Titley, E Maidens

    Many gold deposits were mineralised by fluids and processes that also altered the host rocks. This alteration may often be a useful visual aid that distinguishes barren, low-grade from high-grade regi

    Jan 1, 2003

  • AUSIMM
    The Cannington Deposit

    By Thomas MJ

    The Cannington silver-lead-zinc deposit is located at latitude 21¦ 52' 9" South, longitude 140¦ 55' 10"" East, on the south-eastern margin of the Proterozoic Mount Isa Block (Figure 1), 135

    Jan 1, 1993

  • AUSIMM
    An Investigation into the Benefits of Electronic Initiation and Associated Modelling and Analysis Tools in the Management of Environmental Blasting at the KCGM Chaffers Cut Back in Kalgoorlie

    By S Wotherspoon

    At Kalgoorlie Consolidated Gold MineÆs (KCGMÆs) Fimiston Operations, located on the periphery of Kalgoorlie Boulder in Western Australia, roughly 7.5 million tonnes of rock are broken each month for t

    Jan 1, 2004

  • AUSIMM
    Direct Leaching of Pb and Zn from Complex Sulphide Ore and Concentrate

    By Sharma T

    Laboratory investigations have been carried out on direct leaching of lead-zinc complex sulphide ore and zinc concentrate using ferric chloride. From the investigation it was observed that the use o

    Jan 1, 1992

  • AUSIMM
    Strategic Development of the Stage 5 Pit at Kidston

    The originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i

    Jan 1, 1994

  • AUSIMM
    Geometry And Stability Determination Of Large Dimension Cut-And-Fill Rooms At Kamoto

    By Blake W

    Based on preliminary computer model simulations and stability analyses, both longi- tudinal and transverse, large dimension, cut- and-fill rooms were designed for the parallel dipping ore layers at

    Jan 1, 1973

  • AUSIMM
    In-Situ Leaching of Oxide Gold Deposits

    In-situ leaching of gold deposits has not become an option largely as a result the lack of suitability of cyanide as a lixiviant due to sluggish kinetics and high dependence on the availability of o

    Jan 1, 1991

  • AUSIMM
    Prediction of Rock Cutting Performance using Fracture Mechanics Principles - A review

    By Waller M. D, Whittaker B. N, Singh R. N

    This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process

    Jan 1, 1992