Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rehabilitation at the Macraes Gold Project: from Pit to ParkGold mineralisation at the Macraes Gold Project is hosted in the Hyde-Macraes shear zone and can be traced for ~30km along strike, although economic resources are confined to a 7 km section in the vic
Jan 1, 2002
-
The Broken Hill Lode û Its Geological StructurePerhaps no aspect of the investigation of an ore-deposit is of greater importance to the mining geologist and engineer than a consideration of its geological structure. A thorough understanding of the
Jan 1, 1932
-
The McArthur River Project (734176fa-ffb4-43c7-95c3-495d0f273632)The HYC mineral deposit at McArthur River is about 1.5 kilometres long by 1.0 kilometres wide and 55 metres thick, and contains 227 000 000 tonnes of ore of average grade 9.2% Zn, 4.1% Pb and 41 g/
Jan 1, 1984
-
The Design of Multi-Seam Workings at Shallow Depth Under Tidal WatersBy Anderson KG
Multi-seam mining under the western portion of Lake Macquarie NSW commenced in 1982. Up to three seams separated by partings ranging from 10 to 30 metres are mined simultaneously by Newcom Collier
Jan 1, 1986
-
The Recognition of Pseudoclastic Textures in Hydrothermally Altered Subaqueous Dyke Rocks and Lavas: Some Economic Implications (c681d837-054d-4ce2-9554-1af8f4a6e5d4)By Waters JC
Pseudoclastic hydrothermal alteration textures occur within quenched coherent dykes forming part of a subaqueous dome complex (-4 Ma) on Ponza Island, Italy. These textures are similar to those obser
Jan 1, 1995
-
Control of Calcium Based Scales in Australian Mineral ProcessingBy Grace B, Cunningham D
The poor quality of bore waters available to the Australian mineral processing industry creates a climate for crystallization of calcium based scales. If ignored, calcite and/or gypsum buildup can c
Jan 1, 1991
-
Evaluation of Heavy Medium Cyclone Performance at the Hamersley Iron Mount Tom Price ConcentratorBy Gomm SA
The Mount Tom Price Concentrator, which contains a heavy medium cyclone plant for beneficiation of the -6+0.5mm fraction of low grade iron ore, is described. Testwork was carried out on an opportun
Jan 1, 1987
-
Application Of In-The-Hole Hammer Drilling At The C. S. A. Mine, CobarThe last two years have seen a rapid change-over from mechanised cut and fill. stoping to the more economic and productive long hole open stoping method, such that today more than 80 per cent of to
Jan 1, 1977
-
Ironstone-Related Gold-Copper Mineralisation : Tennant Creek and ElsewhereBy Valenta R. K
Copper-gold deposits associated with iron oxide rich rocks (ironstones) form a distinctive and significant ore association which occurs widely, but not exclusively, in the Proterozoic. The ironstone a
Jan 1, 1990
-
Errors in Sampling Rock Fragmentation from ImagesThe basic purpose of blast design is to produce rock in a size range which is within the requirements of the materials handling system. Once this is achieved, one would like to find the fragmentation
Jan 1, 1976
-
Technical Feasibility Studies and Uses of Treated Acid Mine Drainage at Kingsmill Tunnel, PeruBy J Chßvez, J Rosa del Castillo, J Rui
Environmental Impact Assessment (EIA) and Feasibility Studies (FS) were carried out to evaluate the potential use of treated acid mine drainage (AMD) occurring at the Kingsmill Tunnel in the Central A
Jan 1, 2003
-
Feasibility Studies - Scope and AccuracyFeasibility is a value improvement process for projects. At any stage in project development, a feasibility study can be undertaken, but although the scope generally remains unchanged the extent of
Jan 1, 1997
-
Squeezing More Out of Your Orebody at WallabyBy M Titley, E Maidens
Many gold deposits were mineralised by fluids and processes that also altered the host rocks. This alteration may often be a useful visual aid that distinguishes barren, low-grade from high-grade regi
Jan 1, 2003
-
The Cannington DepositBy Thomas MJ
The Cannington silver-lead-zinc deposit is located at latitude 21¦ 52' 9" South, longitude 140¦ 55' 10"" East, on the south-eastern margin of the Proterozoic Mount Isa Block (Figure 1), 135
Jan 1, 1993
-
An Investigation into the Benefits of Electronic Initiation and Associated Modelling and Analysis Tools in the Management of Environmental Blasting at the KCGM Chaffers Cut Back in KalgoorlieBy S Wotherspoon
At Kalgoorlie Consolidated Gold MineÆs (KCGMÆs) Fimiston Operations, located on the periphery of Kalgoorlie Boulder in Western Australia, roughly 7.5 million tonnes of rock are broken each month for t
Jan 1, 2004
-
Direct Leaching of Pb and Zn from Complex Sulphide Ore and ConcentrateBy Sharma T
Laboratory investigations have been carried out on direct leaching of lead-zinc complex sulphide ore and zinc concentrate using ferric chloride. From the investigation it was observed that the use o
Jan 1, 1992
-
Strategic Development of the Stage 5 Pit at KidstonThe originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i
Jan 1, 1994
-
Geometry And Stability Determination Of Large Dimension Cut-And-Fill Rooms At KamotoBy Blake W
Based on preliminary computer model simulations and stability analyses, both longi- tudinal and transverse, large dimension, cut- and-fill rooms were designed for the parallel dipping ore layers at
Jan 1, 1973
-
In-Situ Leaching of Oxide Gold DepositsIn-situ leaching of gold deposits has not become an option largely as a result the lack of suitability of cyanide as a lixiviant due to sluggish kinetics and high dependence on the availability of o
Jan 1, 1991
-
Prediction of Rock Cutting Performance using Fracture Mechanics Principles - A reviewBy Waller M. D, Whittaker B. N, Singh R. N
This paper overviews the recent research progress in predicting cutting performance using fracture mechanics principles. It is emphasised that rock fragmentation due to cutting is mainly a process
Jan 1, 1992