Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Resource Estimation Using Reverse Circulation and Blasthole Samples in a Bedded Iron Ore Deposit

    By C Boyle

    Brockman 2 mine is located in the Pilbara of Western Australia and is operated by Rio Tinto Iron Ore. Mineralisation is hosted by synclines where there is structural complexity to focus fluid flow. Mi

    Jul 11, 2011

  • AUSIMM
    Advanced Ventilation Control – An Analysis of Innovation and Environmental Sustainability

    By V S. Mutton, M J. Shearer

    "The current economic challenges faced by the mining industry led to a review of options for reducing the cost of ventilation control devices (VCDs). The VCDs at the Mount Isa Mines site operated by G

    Aug 31, 2015

  • AUSIMM
    Discovery to Production – The Athena Gold Mine

    By D Howe

    The Athena gold deposit was discovered in 2007 by Gold Fields Australia Ltd, at the St Ives Gold Mine, 35 km southeast of Kambalda, Western Australia. Gold anomalism was identified in sheared Paringa

    Aug 22, 2011

  • AUSIMM
    Practical Sampling for Online Analysis and Composite Samples of Slurries - The Art of Compromises

    In practice a sampling solution is a compromise of many requirements: the sample should be representative; the sampling system should also be reliable, less than 95 per cent availability rest

    Mar 1, 2010

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    A Geostatistical Contribution to Assess the Risk Embedded in Resource Classification Methods

    By J F. C L Costa, J C. Koppe

    It is recognised by the major international codes that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological and grade con

    Jan 1, 2009

  • AUSIMM
    The emerging role of the operational geotechnical engineer

    By C G. Sweeney

    The underground mining industry is seeing unprecedented shortages in skilled labour. Migration to Australia being at an all-time low is a leading concern, with pandemic-induced border closures and loc

    Nov 29, 2022

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    Review of Australian Longwall Panel Ventilation Practices

    By S Gillies, H W. Wu

    A study has been undertaken into mine ventilation systems currently in use within Australian modern coal longwall (LW) extraction mines. It reviews systems and discusses evolving changes being adopted

    Jul 1, 2013

  • AUSIMM
    Assessment of Robertson (2010a) CPTu state parameter inversion method within Been et al. (1987) CPTu inversion parameter framework

    By K Smith

    This paper presents an assessment of the Robertson (2010a) method within the CPTu inversion parameter framework of Been et al. (1987), using CPTu calibration chamber data presented by Jefferies and Be

    Jul 1, 2021

  • AUSIMM
    Elastoplastic parameter change at claystone rock mass during sliding failure at Warukin Formation, Indonesia

    By G W. Swana

    Elastoplastic parameter is a parameter that describe how much materials behave elastically up to certain stress states and plastically thereafter (Hudson and Harrison, 1997). In the continuum analysis

    Nov 29, 2022

  • AUSIMM
    Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian Example

    By A Fitzpatrick

    An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa

    Jul 10, 2012

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    A Study into Bonding within Reduced Titanomagnetite-Coal Compacts

    By R J. Longbottom

    In this study the bonding within reduced titanomagnetite-coal compacts was investigated. The aim of the study was to better understand the binding mechanisms in the reduced compacts and, based on this

    Jul 11, 2011

  • AUSIMM
    Dynamic Simulation in Iron Ore Pelletising Plants

    By P Navarra, R Kuhne

    Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden

    Jan 1, 2009

  • AUSIMM
    Mining automation human-systems integration – CMOC-Northparkes case study

    By J Cronin, R Burgess-Limerick, T Horberry, L Steiner

    "Automation offers the mining industry great potential for improvements in productivity and safety. However, the experience of introducing automation in other industries has been that the full potenti

    Oct 16, 2017

  • AUSIMM
    The successful deployment of a fatal risk system, designed for the front-line

    By C J. Pitzer

    The prevention of fatal risks is a key objective for the global resources industry, especially considering poor performance with regard to fatality rate reduction and the continued occurrence of mine

    Mar 29, 2023

  • AUSIMM
    Adaptation of an Open Pit Optimiser for Underground Strategic Planning

    By M Bloss, B Roberts

    BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so

    Nov 24, 2014

  • AUSIMM
    A short review – hydrogen reduction of copper-containing resources

    By M I. Pownceby, M A. Rhamdhani, D M. Fellicia, S Palanisamy, R Z. Mukhlis

    The trend of global copper production has prospectively increased over time. Based on typical mined ore grades, 1 t of copper ore generates approximately 6–10 kg of copper, which requires much energy,

    Jun 19, 2024