Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Reclamation - The Use of Computer Aided Design to Integrate Reclamation and Mine PlanningMine planning typically involves designing an operation to uncover coal with the minimum initial costs with reclamation planning and earthworks being done as an "add on" task. The landform is too st
Jan 1, 1991
-
TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment ManufactureBy J M. Shekiro
In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most
Oct 5, 2011
-
Tight slot blasting for routine fault-slip seismicity control at Mt Charlotte MineBy P Mikula, R Geranmayeh, R Carlton, M Ferguson, R Whiting
The concept of using specially designed slot blasts to mine through stress abutments that intersect faults, while controlling fault-slip seismicity, has come of age at Mt Charlotte Mine. Due to the hi
Nov 29, 2022
-
An Analysis of the Mixing of Air and Methane in the Stream Produced by the Mine Injector Station - Presenting Preliminary Results of Measurements and ModellingBy J Janus, J Krawczyk
Local accumulation of methane in workings of a longwall is one of the most common causes of mining accidents. This gas has many sources: it may leak from goaf through permeable sealings, or through ga
Jul 1, 2013
-
A Simple Method of Measuring Rock Fracture Toughness using the Brazilian Test MethodBy Aziz NI
There are a number of methods available for the determination of the fracture toughness of rock. Some of the most recognised methods include the hollow pressured cylinder, the short-rod, the chev
Jan 1, 1992
-
The Applicability of Endless and Direct Rope Haulage Technology for Transportation Systems on Decline ShaftsBy E N. Sparg, O D. A Deuchar, F Needham
Decline shafts are an attractive option to both new and existing mining operations where there is a need to access an inclined orebody deposit via on-reef development so as to generate a return in the
Jan 1, 2005
-
Iron Sinter Process Control Using X-ray DiffractionBy U König, N Norberg
Traditionally, quality control of iron sinter has relied on time-consuming wet chemistry. However, the mineralogical composition that defines the physical properties, such as strength or reducibility,
Jul 13, 2015
-
Ramp-up and long-term performance of the Albion Process™ plant at GeoProMining Gold ArmeniaBy D Walker, A Tsvetkov, P Voigt, O Kloiber-Deane
The GPM Gold Operation has been employing an Albion Process™ plant at its Sotk (Zod) gold mine in Armenia since 2014. Long term data from the operation is now being published for the first time. The
Aug 29, 2018
-
Underground Mining Operations at The Selwyn ProjectSince the 1950's drilling has been rapidly mechanised. First from hand held drills with air legs to pneumatic jumbos, then to more effective hydraulic jumbos. Development of underground drill
Jan 1, 1988
-
Characterisation of Large Size Flotation CellsBy F H. Henrfquez, A G. Oroz
Design and operating conditions of large size mechanical flotation cells were evaluated by comparing them with actual operating conditions in a plant. The objective was to determine the time scale-up
Jan 1, 2005
-
Virtual Environment Training for Preshift Inspections of Haul Trucks to Improve Mining SafetyBy D A. Bowman, S Schafrik
With the goal of reducing injuries and fatalities related to haul truck accidents, this research investigates technologies and intervention strategies for improving worker training using a virtual env
Jan 1, 2008
-
Mining What's in it for New Zealand?By B M. H Sharp, R P. Hide, S P. Devine
Uncertainty and debate currently pervade the mining industry in New Zealand. The operational uncertainties, whether external (eg gold prices, the exchange rate), or internal (eg coal expansion difficu
Jan 1, 1985
-
Predicting Finished Product Properties in the Mining Industry from Pre-Extraction DataBy J E. Everett
An essential requirement of product quality control in the mining industry is to be able to reliably predict key quality properties of finished product from the data available before the extraction of
Sep 5, 2011
-
Commissioning of the Kanmantoo Copper ConcentratorBy J Seppelt
The Kanmantoo Copper Project is owned and operated by Hillgrove Resources Limited and is situated in the Adelaide Hills region in South Australia. Mining in the area has taken place off and on over th
Oct 29, 2012
-
Accounting for Vegetation Dynamics in Landform Evolution ModellingBy G R. Hancock, S Grant, T Whiteside, J B. C Lowry, J Boyden, T J. Coulthard
Physically-based landform evolution models (LEM) provide a spatial framework to forecast the long-term geomorphic stability of post-mining landscapes. When used to test the relative stability of diffe
Jun 28, 2016
-
High Quality Performance of Segmental Lined TunnelsTunnels are being built around the world using TBMs and prefabricated segments or in situ concrete as linings. Clients demand high quality of these linings to guarantee a long-term stability and densi
Jan 1, 1999
-
Loading Mechanics of the æCanÆ and Implications for Improved Strength and Stiffness PropertiesImproved roof control in high deformation tailgate environments has been achieved over the last decade through development of stiffer and increased capacity standing support products. æThe CanÆ is one
Jan 1, 2005
-
Cultural Challenges in Chinese/Australian Mining Mergers and Acquisitions - A CEOÆs PerspectiveBy Y Zhu, W Liang, P Knights
In recent years, Chinese companies have invested billions in Australian mineral exploration, development and processing. In 2008 - 2009 alone, the Foreign Investment Review Board approved $26.4 B of i
Nov 20, 2012
-
Updraught SinteringBy Green A. D M
The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima
Jan 1, 1964
-
Development and Operations of the Coal Preparation Plant at MouraThe development of the Moura Coal Preparation Plant is described, commencing with the first'stage of the plant commissioned in 1963. The subsequent expansion stages are traced through to Octob
Jan 1, 1974