Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    New Perspectives on the Busang Gold Fraud

    The gold salting fraud at Busang on the island of Kalimantan, Indonesia was exposed in early 1997 and resulted from the independent drilling, sampling and assaying of PT Freeport Indonesia which repor

    Jan 1, 2002

  • AUSIMM
    Metallothermic Reduction of Magnese-Bearing Slags

    By W J. Rankin, D R. Swinbourne

    There are large tonnages of low-grade manganese ores in India fromwhich it is uneconomic to produce ferroalloys by conventionalsubmerged arc furnace smelting. A possible way to utilise these ores is t

    Jan 1, 1998

  • AUSIMM
    The Victoria Gold Deposit in the Mankayan Mineral District, Luzon, Philippines

    By A G. Cuison, B V. Andam

    Three well-known copper and gold deposits in northern Luzon, Philippines are located in the Mankayan Mineral District. These are the Lepanto Copper-Gold Deposit, the Far Southeast Porphyry Copper Depo

    Jan 1, 1999

  • AUSIMM
    A review of ventilation and gas management in underground mines

    By A Self, B Robertson

    During 2015 and 2016, the authors conducted a number of surveys, workshops and reviews of ventilation and gas management practices in Australian underground coalmines. The study was funded by ACARP wi

    Aug 28, 2017

  • AUSIMM
    Predictive maintenance modelling for bearing-based equipment

    By Y Xie, D Willingham

    Predictive maintenance (also known as ‘condition/health monitoring’) refers to the intelligent monitoring of equipment to avoid future failures. In contrast to conventional preventive maintenance, the

    Jul 24, 2017

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Grey River Gold Dredge Project

    Grey River Gold Mining Ltd commenced dredging alluvial flats in the Grey River Valley in 1989. Previous drilli

    Jan 1, 1990

  • AUSIMM
    Predicting Flotation Response from Liberation Information

    Predicting Flotation Response from Liberation Information

    Sep 13, 2010

  • AUSIMM
    Management of Mining Wastes in European Union and Developments in Turkey

    Management of Mining Wastes in European Union and Developments in Turkey

    Sep 13, 2010

  • AUSIMM
    Beneficiation Studies of Dolomitic Rock Phosphate in Pursuit of Zero Waste Technology - A Case Study

    Beneficiation Studies of Dolomitic Rock Phosphate in Pursuit of Zero Waste Technology - A Case Study

    Sep 13, 2010

  • AUSIMM
    The Changing Role of Representative Bodies and Institutes

    Change is inevitable but learning from change is an option. Willingness to learn is one of the first lessons that a leader must learn. Get comfortable and get left behind. I propose to outline the mai

    Jan 1, 2000

  • AUSIMM
    What is the Future for Magnetite Projects in Australia and Why Have Some of the New Projects Been So Problematic?

    By D Connelly

    Magnetite orebodies generally means mining lower grade iron ores, crushing and grinding with significant energy costs in processing and the capital costs being significantly higher than for direct shi

    Jul 13, 2015

  • AUSIMM
    Estimating Breakage of Fine Ore Particles by Media in a Small Ball Mill Using DEM

    Estimating Breakage of Fine Ore Particles by Media in a Small Ball Mill Using DEM

    Sep 13, 2010

  • AUSIMM
    Investigations on the Martha Hill Gold Prospect

    Mining at Waihi on the Martha Hill commenced in 1878 and between 1892 and 1953 produced 35 million ounces of bullion from some 13.5 million short tons of ore from 40 named quartz reefs. The general g

    Jan 1, 1979

  • AUSIMM
    Designing Processing Operations for the Future ù DonÆt Forget Acid Drainage

    With the continued implementation of stricter limitations on the discharge of excess process water from all existing and future mining and metallurgical operations, the design and operation of the ent

    Jan 1, 2004

  • AUSIMM
    The Methodology Behind the Development of the Vera/Nancy Mine

    Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the time

    Jan 1, 1998

  • AUSIMM
    Open Pit Mine Slope Engineering: A 2002 Perspective

    In most surface mining operations, overall project economics is driven to a significant extent by the slope angles that can be achieved within the rock masses present. This is particularly true of pre

    Jan 1, 2002

  • AUSIMM
    Environmental Investigations and Procedures to Support Mining Consent Applications

    By M Foster

    The new environmental legislation of 1986 was left incomplete and to date remains so. The 'missing' process by which environmental consideration should be applied was never embodied in law a

    Jan 1, 1988

  • AUSIMM
    A Comparison of Massive Sulphide Deposits Forming at the PACMANUS (Manus Basin, PNG) and Jade (Okinawa Trough, South China Sea) Seafloor Hydrothermal Fields

    By R A. Binns, S Murao

    The PACMANUS and Jade deposits are two active hydrothermal fields that are forming massive sulphide deposits at the Pacific rim margin. Both are associat

    Jan 1, 1995

  • AUSIMM
    Grinding and Beneficiation Characteristics of a Low-Grade Haematite Ore

    Grinding and Beneficiation Characteristics of a Low-Grade Haematite Ore

    Sep 13, 2010