Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Ground And Liner Behavior During Construction Of The Mt. Baker Ridge TunnelBy Alexander I. Feldman, Michael S. Kucker, Robert A. Robinson, Harvey W. Parker
An extensive geotechnical monitoring program was used to assess ground and liner behavior, provide input to a Disputes Review Board, and verify design assumptions during construction of the Mt. Baker
Jan 1, 1987
-
Review of 1988 international mining activitiesBy Charles L. Kimbell
The year 1988 for the minerals indus¬try was one of favorable worldwide economic conditions for continued, rationally constrained growth. There was continued improvement in relations between market
Jan 1, 1989
-
Chemical Consolidation In A Mixed Face TunnelBy Terence G. McCusker, E. Roy Anderson
A four-mile length of interceptor sewer tunnel in Manhattan has finished sizes ranging from 10'6" to 14'6" horseshoe. Mixed face conditions were anticipated in three areas and encountered in
Jan 1, 1997
-
Seismic Exploration Applied To Underground Excavation ProblemsBy R. W. Mossman, George E. Heim
Seismic exploration techniques offer the engineer and geologist a way of obtaining detailed information on the physical parameters and geometry of the rocks where extensive underground excavation or t
Jan 1, 1997
-
Study On Mesozoic Carbonates Of The Ionian Zone And Their Petroleum Potential Based On Stable Isotopes, Total Organic Carbon, SEM And Clay Minerals (NW Greece)By K. Getsos
Western Greece is a favorable site for exploration and discovery of oil fields. The most important potential source rocks seem to be all the rocks deposited before middle Jurassic under special circum
Jan 1, 2006
-
A Comparison Of Microcomputer Based Optimum Pit Limit Design AlgorithmsBy Y. C. Kim
Although the first published optimum pit limit design algorithm by Lerchs-Grossmann dates back to 1965, the majority of the open-pit mines in the U.S. has not as yet adopted such a rigorous optimizati
Jan 1, 1988
-
Construction of the Inter-Island Tunnel Boston Harbor ProjectBy A. J. Stewart, R. L. Shufflebotham, D. W. Ferguson, T. L. Page
The Inter-Island Tunnel is a 7.7 kilometer (25,160 foot) long by 3.5 meter (11.5 feet) diameter concrete lined tunnel through the Cambridge formation below Boston Harbor. Constructed as part of the Bo
Jan 1, 1997
-
Construction Of Southwest Interceptor #3 And #4 Cleveland, OhioBy Lawrence M. Lenahan
Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con
Jan 1, 1989
-
Practical Stoppings ConstructionBy Warren D. MacEvoy
INTRODUCTION Good ventilation bulkheads (stoppings) can be obtained only by conscientiously adhering to four basic principles: carefully selecting the site for the bulkhead, adequately preparing th
Jan 1, 1982
-
A Radioisotope Tracer Technique For The On-Stream Determination Of Simulation Parameters In Open-Cycle, Continuous Ball Mills ? 1. IntroductionBy Robin P. Gardner
The mechanistic approach to comminution consisting of incorporating particulate breakage functions into a suitable population balance equation has been developed by a number of researchers over the pa
Jan 1, 1974
-
Groundmovement Due To Coal Mining And Its Damaging EffectsBy Nath S. Parate
With the extension of mining beneath residential and industrial areas, it is becoming increasingly necessary to extract coal and minerals in such a way that subsidence damage due to groundmovement is
Jan 1, 1982
-
TECHNICAL NOTE - Application of Electrical Technology to Monitor the Ball Milling Process and Reduce the Rate of Wear of the Grinding MediaBy S. A. Hoenig
Introduction In an earlier publication, the application of exoelectron technology to the monitoring of dry grinding in a ball mill was reported. Recently, the author has investigated the ball mill
Jan 1, 1984
-
Mining With Spontaneous Combustion Problems At Jim Walter Resources, Inc. -No. 5 MineBy Thomas E. McNider, Robert C. Howell, J. W. Stevenson
As of the end of October, 1990, there have been eight spontaneous combustion heatings reported to the Mine Safety and Health Administration (MSHA) at the No. 5 Mine. A reportable heating is defined as
Jan 1, 1991
-
A Simulation of a Multi-Pit Surface Mining Operation - IntroductionBy C. B. Manula
This paper presents the results of an application of the PSU/USBM Open Pit Materials Handling Simulator (1) to a large stripping mine in the Southwestern Coalfield. The specific objective of the study
Jan 1, 1979
-
War Eagle Sets Its Sights On Becoming A Leading Germanium ProducerVancouver-based War Eagle Mining Co. is an advanced-stage Canadian junior mining company that is focused on becoming one of the world?s leading germanium producers. War Eagle?s primary focus is on t
Jan 1, 2008
-
Mixed Face Tunnel Excavation Using Floating Crown Bar And Modified Spiling MethodsBy Joginder S. Bhore, Francis M. Keville, David E. Puza, Roger C. Borggaard
A portion of the Massachusetts Bay Transportation Authority's Red Line Extension through Somerville, Massachusetts consists of 1,553cm (5,092 LF) of hard rock tunneling 6.7m (22 ft.) diameter hor
Jan 1, 1981
-
Wet semiautogenous grinding mills at National Steel Pellet Co.By W. C. Dailey
National Steel Pellet Co. operates eight 8.2-m diameter by 5.5-m long (87- x 18-ft) SAG mills to grind 15.24 Mt (15 million It) of taconite ore per year. Improvements to increase mill throughput, lowe
Jan 1, 1987
-
Reducing Longwall Noise With Acoustical Material On The Shields-A Preliminary AnalysisBy J. P. Rider
Along with increased production from longwall units has come the likelihood of increased worker noise exposures. In recent years, equipment has become larger, more powerful, and noisier than its prede
Jan 1, 1997
-
Geochemical Investigations Of Magnetic Anomalies, Lee County, AlabamaBy Thornton L. Neathery
A small area in the Alabama Piedmont was studied to determine if metallic enrichment was associated with local magnetic anomalies. Cores from two holes in these magnetic anomalous areas have sulfide (
Jan 1, 1972
-
Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 Mps (30155423-28d4-4121-901f-0069696f7abd)By Poltak Sinaga
PT Kaltim Prima Coal's 13.1 km overland conveyor was commissioned in 1991. It is of conventional 3 roller 350 troughed belt type. Cost and performance optimisation during initial design ended up
Jan 1, 2008