Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:By Paul Morrison
The paper describes the design process, trial testing and contract pile installation of 772 precast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig
Jan 1, 2000
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Increase In Shear Modulus By Soil Mix And Jet Grout MethodsBy Paul J. Axtell
The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc
Jan 1, 2008
-
Effective Dewatering Is More Than A Pump In The Hole - A Presentation At The Deep Foundations Institute Annual Meeting St. Louis, Missouri, November 1980By William J. Rothschild
Ground water at construction sites can be controlled by properly placed wellpoint dewatering systems. Care must be taken in planning cofferdams to have adequate space for and access to pumps, headers
Jan 1, 1984
-
Accessories For Driven Piles ? SynopsisBy H. W. Hunt
Accessories are increasingly used to protect and extend H, pipe, precast concrete, timber, and sheet piles for any soils conditions. With point protection, piles can be driven through boulders, layere
Jan 1, 2010
-
Foundations On Karstic Limestone In Kuala Lumpur Malysia ? SynopsisBy J. M. Mitchell
Kuala Lumpur, Malaysia is underlain by karstic limestone. Firm clays, mudstones and siltstoncs of the Kenny Hill Formation overlie the limestone for about two thirds of the city. The remaining third h
Jan 1, 2010
-
Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
Approach To Reliability Based Design On Deep Mixing Improved GroundBy Masaki Kitazume
Deep mixing method, in-situ admixture stabilization technique, has been developed and adopted for on land and marine construction works in Japan. The geotechnical design procedure of the method has be
Jan 1, 2004
-
Deep Diaphragm Wall Activities At Randstadrail Project In Rotterdam, The NetherlandsBy Klaus Pöllath
The Netherlands RandstadRail project makes use of a large range of sophisticated geotechnical techniques to allow a shield driven tunnel to approach the central station of Rotterdam. This paper descri
Jan 1, 2006
-
Estimation Of Modular Ratio And Modulus Of Deformation Of Granular Piles From In-Situ Compression TestsBy Padmavathi V, M. Najamuddin, M. R. Madhav
Granular piles are one of the leading ground improvement techniques, adopted for the betterment of bearing capacity and reduction in settlements of the foundations and also to accelerate consolidation
Sep 1, 2022
-
Deep Vibrocompactation By Stone Columns And Liquefaction InvestigationBy P. Ventura
Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde
Jan 1, 1989
-
Overview Of Earth Retaining Systems And Their SelectionBy Raymond J. Castelli
The paper provides a general overview of the numerous types of earth retaining systems currently available, and organizes these various systems by several classification methods. These classifications
Jan 1, 2003
-
Soil-Cement Walls For Excavation SupportBy David S. Yang
The Cement Deep Soil Mixing (CDSM) method introduces and mixes cementitious materials with in situ soils using hollow-stem rotating shafts equipped with a cutting tool at the tip and mixing paddles ab
Jan 1, 2003
-
Izmit Bay Bridge Crossing: Integrated Multidisciplinary Approach Reduces Risk And Lowers Overall Project Cost For Bot Bridge ConsortiumBy Jacob Chacko
The Izmit Bay bridge, a 3-km-long suspension bridge crossing of Izmit Bay, Turkey is planned to be constructed in one of the most seismically active places in the world. The site, which has the poten
Jan 1, 2011
-
Tied-Down Boat Section ConstructionBy Romano J. Micciche
One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High
Jan 1, 1994
-
Selection & Design Of Augered Cast-In-Place (ACIP) PilesBy Dan A. Brown
Outline ? Basic Concept of ACIP Piles ? Factors Affecting ACIP Pile Performance ? Applications: - Favorable Conditions - Unfavorable Conditions ? Design for Axial Loading ? Lateral Loa
Jan 1, 2004
-
Sonic Drilling Offers Quality Control And Non-Destructive Advantages To Geotechnical And Construction Drilling On Sensitive Infrastructure SitesBy John P. Davis
The use of conventional, circulatory air rotary and fluid rotary, cased and uncased drilling methods in the vicinity of sensitive infrastructure can have deleterious effects on the ground conditions s
Jan 1, 2006
-
Characteristics And Application Of Soil Reinforcement By Jet Grouting ? SynopsisBy J. W. Wang
This article first explains the mechanism of forming strength in the Jet grouting reinforced foundation, and points out the function of cement hydrates and clay minerals in clayey soil, the reinforced
Jan 1, 2010
-
Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - SynopsisBy N. S. Yet
This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C
Jan 1, 2000
-
Kentucky Route 9 - Licking Pike Widening Design Build Slope StabilizationBy Frederick W. Slack
This paper will discuss the inherent value engineering associated with the design and construction of approximately 184,000 SF of anchored tieback wall, installed as part of the widening and drainage
Jan 1, 2003