Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Housing Stress and Location Choices in Bowen Basin Mining Communities - A Case Study of Moranbah

    By S Lockie, G Ivanova, J Rolfe

    One of the consequences of mining expansion in the Bowen Basin region of Central Queensland in Australia has been a substantial increase in demand for housing, with subsequent impacts on housing and r

    Jan 1, 2009

  • AUSIMM
    Measurement of Residual Shear Strength Using a Modified Direct Shear Apparatus

    By L Tatnell, R Mackay, A Tolooiyan

    The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is

    Nov 5, 2014

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • AUSIMM
    Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine

    By R Steven

    "Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra

    Nov 15, 2016

  • AUSIMM
    Probabilistic Slope Design and its Use in Iron Ore Pit Optimisations

    The current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v

    Jan 1, 2009

  • AUSIMM
    Exploring Optimised Delay Timing for Fragmentation

    By C K. McKenzie

    As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened

    Nov 8, 2011

  • AUSIMM
    Unmanned Aerial Robots for Remotely Operated and Autonomous Surveying in Inaccessible Underground Mine Voids

    By A Grace, C Sennersten, T Taylor, A Davie, R Lyu, D Pentecost, C A. Lindley, J Craig, L De Macedo Camargo

    Many underground mine void spaces are not suitable for human entry due to unprotected roofs, instability or having an unknown safety state (eg if they are many decades old). Investigations of these vo

    Nov 4, 2015

  • AUSIMM
    The MRMR Rock Mass Rating Classification System in Mining Practice

    By D H. Laubscher

    The in situ rock mass rating system û IRMR - leading to the mining rock mass rating system - MRMR - for jointed rock masses has been used (and abused) in mining operations around the world for the pas

    Jan 1, 2000

  • AUSIMM
    The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine Tunnels

    By E P. O’Dwyer

    Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust

    Sep 17, 2014

  • AUSIMM
    Getting Back in Front – Time for a Step Change in Engagement Practices

    By K Eglinton

    The extractive industries response to community engagement due to social and political pressures in the 1980s and 1990s was the starting point of development leading to the modern function of corporat

    Nov 22, 2011

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Mine Closure Guidelines for Western Australia and Consultation Process

    By X T. Nguyen

    Western AustraliaÆs Mining Act 1978 was amended in 2010 to provide for the requirement of a mine closure plan to be submitted to the Department of Mines and Petroleum (DMP) for approval, as part of a

    Jul 10, 2012

  • AUSIMM
    From errors to uncertainty – a clarification for proper use by the Theory of Sampling

    By F F. Pitard

    Observation from attending many conferences around the world reveals that many people are constantly shifting from the word ‘error’ to the word ‘uncertainty’ without a clear vision of what the subtle

    May 9, 2017

  • AUSIMM
    The 250 million ton per annum spatial digital twin

    By M Pomery

    BHP’s Western Australian Iron Ore Operations (WAIO) move approximately 250 million tons of ore per annum. The magnitude of the constant changes to the terrain models along with the diverse output and

    Sep 18, 2023

  • AUSIMM
    Dealing with uncertainties on mining equipment fleet planning and usage

    By I R. Souza

    At the mining industry, there are several uncertainties that may affect the mobile mining equipment fleet sizing and usage, such as commodity supply and demand, which impacts the mineral price, enviro

    Nov 8, 2021

  • AUSIMM
    A Remote, Rapid and Accurate Three-dimensional Ore Waste Boundary Tracking System

    By A T. Spathis, K E. Leslie, K R. Blay

    Many open pit mining operations seek to control blasting-related movement of ore and waste to minimise loss and dilution. Tracking the movement of ore boundaries can result in the maximisation of ore

    Aug 24, 2015

  • AUSIMM
    A Multiple Blasthole Fragmentation Model – Its Concept, Formulation, Capability and Field Comparison Examples

    By R Yang

    This paper presents a fragmentation model for large production blasts in an open pit or underground environment. The paper shows that the particle velocity is directly related to pressure, strain, and

    Aug 24, 2015

  • AUSIMM
    Selection Sizing and Developing the Optimum Gravity Gold Circuit for Your Project

    Gravity gold recovery has been practiced for thousands of years, making it one of the oldest forms of mineral processing. Gold is 19 times heavier than water although the barren rock is generally only

    Aug 1, 2010

  • AUSIMM
    Cape Lambert Upgrade Project

    By S Russell

    The completion of the $1.1 B Cape Lambert Upgrade project is the second ‘pillar’ in Rio Tinto Iron Ore’s expansion program that has enabled Rio Tinto Iron Ore to effectively double iron ore shipping c

    Jul 11, 2011

  • AUSIMM
    Making the Most of Blast Measurements

    By D P. Blair

    The theme of this conference is blasting productivity. This article only considers the technology aspect of this theme, and in particular, the collection and analysis of experimental data. In many cas

    Nov 8, 2011