Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Flotation in the Warrego Concentrator of Peko Mines Ltd.

    By Lynch AJ, Musgrove NH

    The behaviour of chalcopyrite and pyrite in the rougher-scavenger and regrind-retreatment circuits in the Warrego concentrator is discussed. The effects of change in xanthate addition on the separ

    Jan 1, 1975

  • AUSIMM
    Exploration of the Porgera Gold Deposit

    The Porgera gold deposit in the Papua New Guinea highlands contains about 387 tonnes of gold. The results of its exploration show the benefits of persistence and commitment to this difficult depos

    Jan 1, 1987

  • AUSIMM
    Underground Downhole Geophysics at CSA Mine, Cobar

    By Erickson M. E, Smith C. K, Carswell J. T

    Thirteen holes totalling 3200m were surveyed using a downhole time domain Geonics EM37 system at the 830 metre level within the CSA Mine, Cobar, New South Wales, in order to search for blind, electric

    Jan 1, 1990

  • AUSIMM
    Mamatic Evolution and Exhalative Ores: Evidence from the SW Pacific

    The earliest suggestions that some metallic ore deposits might have resulted from seafloor volcanic exhalation seem to have been those of Elie de Beaumont in 1847 and Henry de la Beche in 1851. In

    Jan 1, 1987

  • AUSIMM
    Predictive Groundwater Solute-Transport Models and the Permitting Process for Mine Waste Facilities in Wisconsin, USA ù A Case Study From a Proposed Site Near Crandon

    By D T. Feinstein, M B. Gotkowitz

    In Wisconsin, state laws and regulations governing metallic mine permitting stipulate that protection of groundwater quality be assured indefinitely through all phases of the mining project, including

    Jan 1, 2003

  • AUSIMM
    Why risk assessment and safety climate measurement are essential for psychosocial safety

    By A Fern, A Hawkes, o, T Vincent

    The modern workplace has changed dramatically in recent years with an increased emphasis on the psychological well-being of employees. While adhering to a certain standard of psychosocial safety at wo

    Apr 16, 2024

  • AUSIMM
    Effective Domain Selection for Grade Control in Narrow Vein Gold Deposits

    By G D. Matthews, M E. Haylett, S Khosrowshahi, A Weeks

    Effective domaining is fundamental to geostatistical modelling for grade control. Through analysis of lithological, structural and alteration logging data, effective groupings (domains) can be identif

    Aug 18, 2014

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    The Economic Climate for Mining in New Zealand (01b7c1a3-c189-4335-9116-ee02100e1776)

    This paper presents a resume of the likely profitable mining areas in New Zealand. It covers the main "minerals" - gold, coal, oil and gas, ironsands, silica sands, clays, lump silica, perlite, sulphu

    Jan 1, 1990

  • AUSIMM
    Oceanographic Preparations for Offshore Operations

    By Nilsson C

    Man has always been and will always be part of his environment, in ,a good, bad or indifferent manner. Until quite recently, this environment has been the atmospheric boundary layer above the land m

    Jan 1, 1970

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017

  • AUSIMM
    Getting underground: design and construction of a portal in a pit with moving walls

    By J Player, P Evans, G Sweby

    Achieving quick underground access after the completion of an open pit mine can be critical to maintaining project value and ensuring regular ore feed to the mill. This paper outlines the design and c

    Mar 15, 2021

  • AUSIMM
    Production Variance Benchmarks and Their Use in Project Evaluation and Due Diligence

    "Cash flow modelling during project evaluation is enhanced when probabilistic methods are applied to the inputs. One of the important inputs is the quarterly production profile. Typically, the steady-

    Mar 8, 2016

  • AUSIMM
    Energy Efficiency Opportunities in Milling – Improving Comminution Circuit Efficiency

    By F Musa

    One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput

    Aug 8, 2011

  • AUSIMM
    Developing an evaluation method for bulk ore sorting

    By S Dykes, R J. McCarthy, B Klein

    There is growing interest in the mining industry on the application of ore sorting. While many are familiar with particle sorting, including the limitations that technology presents (e.g. throughput),

    Nov 10, 2020

  • AUSIMM
    Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource Estimate

    By C Switzer, R Logan, S Konopa, P Stoker, R Lewis

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New G

    Mar 18, 2015

  • AUSIMM
    The Role of Benchmarking and Independent Reviews

    By D Hunter, N Cusworth, J Miller

    "Recent project failures have called into question the use and relevance of benchmarking and independent reviews, forcing a rethink of traditional processes and procedures.With cost estimates and sche

    Mar 8, 2016

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Quantifying the quality of cable bolt installation by acoustic testing

    By M Hawkes, Z Ji Gang, Z Ming, R Hassell

    As underground mines become more geotechnically challenging with increasing depth and excavation size, the requirement for ground support to be installed as per design becomes more critical. The verif

    Mar 15, 2021

  • AUSIMM
    Impact testing of raise bore protection mesh

    By M Doran

    The Olympic Dam mine utilises 1.1 m to 1.4 m diameter raise bores for generating the initial slot void for most production stopes. Slot raise bores generally span two development levels ranging from 3

    Mar 29, 2023