Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    Geometallurgical Modelling and Ore Tracking at Kittilä Mine

    By M Wortley, J Korteniemi, D La Rosa, L Rajavuori

    Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno

    Nov 24, 2014

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • AUSIMM
    Improvement of the copper flash smelting furnace (FSF) and the slag cleaning furnace (SCF) process by advice-based control of silica and coke addition

    By A Specht, A Müller, V Montenegro, S Winkler, E Klaffenbach, A Schmidt

    In the process of primary copper smelting in flash smelting furnace (FSF), the ratio of iron to silica (Fe/SiO2 mass ratio) primarily determines the slag viscosity and magnetite formation. Viscous sla

    Aug 21, 2024

  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014

  • AUSIMM
    MineSense technology empowering bucket resolution Mine to Mill reconciliation

    By M Haest, S Sandler, R Botha, H Lang, K Hume

    Benchmark practices in the mining industry include the establishment of Quality Programs — Quality Assurance and Quality Control (QAQC) — to monitor the correct execution of sampling protocols and con

    Mar 22, 2022

  • AUSIMM
    Geometallurgical Modelling Techniques Applicable to Prefeasibility Projects – La Colosa Case Study

    By P A. Montoya

    La Colosa is a world-class porphyry Au project located in Colombia, currently undergoing prefeasibility analysis. As part of collaboration between AngloGold Ashanti and the AMIRA P843A GeMIII Project,

    Sep 5, 2011

  • AUSIMM
    Slime waste to boost agricultural productivity

    By A K. Bhatnagar, S Saha, P Dixit, A K. Mukherjee, P Patra

    TATA Steel’s R&D Division at Jamshedpur has developed a slime beneficiation process to recover iron values from iron ore slime. This process recovers iron ore concentrate containing 2.2 per cent alumi

    Sep 18, 2023

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Analysing reduced conveying capability of the orepass systems in Malmberget mine

    By T Wettainen, G Shekhar, M Stromsten, B Skawina

    The aim of a transportation system in an underground mine is to move the rock masses from one location to another in the most preferable manner by minimising the long and short-term operational costs.

    Mar 15, 2021

  • AUSIMM
    Thermal phosphorus – it’s a hot commodity with a hot process

    By R Atmuri, W Liang, R Prasad, Y Liu, E Wingate

    Yellow phosphorus (YP) has been commercially produced since the 1920s. First in the USA by the Tennessee Valley Authority (TVA), next in Russian (Kazakhstan) in the 1950s, and finally in China in the

    Aug 21, 2024

  • AUSIMM
    Optimising the operation of paste thickening at the Yara Siilinjärvi Plant

    By E Ruhanen, S Kauvosaari, M Kosonen, C Meintjes

    The Yara Siilinjärvi plant is located in the central part of Finland. Siilinjärvi is Western Europe's only apatite mine and annually it produces 1 Mt of apatite concentrate, which create

    Aug 29, 2018

  • AUSIMM
    Metallurgical test work – between a rock and a hard place

    By K Fiedler, A Newell, P D. Munro

    Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and

    Aug 29, 2018

  • AUSIMM
    Optimum Management of Truck Tyres in a Mine

    By S Casas Castellanos

    "Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o

    Nov 15, 2016

  • AUSIMM
    Unlocking value chain optimisation with a digital mining system

    By S Gulati, N Sarkar, T Vink, S Battersby, L Okada

    This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times

    Sep 1, 2024

  • AUSIMM
    Strategic and Tactical Geometallurgy – a Systematic Process to Add and Sustain Resource Value

    By N McKay, J Vann, W Ware, P Hodkiewicz, C Morley

    "Geometallurgy is now recognised within the mining industry as an approach that can both maximise value and reduce the risks associated with resource development. The process of spatial ore variabilit

    Jun 15, 2016

  • AUSIMM
    BHP Billiton West Australian Iron Ore Geometallurgy - Past, Present and Future

    By M Flanagan, T Sua, B Wright, T Carroll, B Van Dijken

    "BHP Billiton (BHPB) West Australian Iron Ore (WAIO) conducts an extensive geometallurgy (geomet) program for its iron ore deposits in the Pilbara. The geomet program provides accurate information to

    Sep 29, 2013

  • AUSIMM
    Advanced Technology for Setting Out of Blastholes and Measurement while Drilling

    By D Xiong, G Xu, L Yao, F Wang, Y Duan

    The goal of this project has been to digitise and use drill parameter data from rotary drilling (measurement while drilling; MWD) for a more effective planning of the blasting process in surface mines

    Aug 24, 2015

  • AUSIMM
    Potential TWA changes for gas monitoring instruments are alarming

    By P Aspinall

    Safe work Australia (SWA) has a number of proposed amendments to existing Workplace Exposure Standard (WES) values that may dramatically change how mining workplaces using personal gas monitoring inst

    Apr 16, 2024