Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Fluxing options and slag operating window for Metso’s DRI smelting furnace

    By K Vallo, T Haimi, J Pihlasalo, J Hamuyuni, M Lindgren, F Tesfaye

    Decarbonisation of the steel industry has recently attracted a lot of research and technological development. Most of the technological developments are centred around the replacement of blast furnace

    Jun 19, 2024

  • AUSIMM
    Open Pit Strategic Mine Planning with Automatic Phase Generation

    By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague

    A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope

    Nov 24, 2014

  • AUSIMM
    Management of riverine disposal of tailings and waste rock for AMD control at the Ok Tedi copper-gold mine

    By S Davidge, J Pile, R Schumann, E Kepe, W Stewart, M Ridd, B Rathi

    Geographical constraints, including steep terrain and high rainfall, at the Ok Tedi copper-gold mine in PNG’s Western Province present Ok Tedi Mining Limited (OTML) with significant challenges in mine

    Aug 2, 2023

  • AUSIMM
    Key insights for the successful implementation of proximity detection and collision avoidance technology for reducing vehicle interaction risk – a surface technology provider perspective

    By C Hoffmann

    Given that each year, 30–40 per cent of mining industry deaths are attributable to failures of vehicle interaction controls (EMESRT, 2023), the mining industry is now armed with a growing body of know

    Apr 16, 2024

  • AUSIMM
    Evaluating All the Alternatives to Select the Best Project Strategy

    It is well known that the ability to influence project value reduces significantly as planning progresses and decisions regarding project parameters are made. However, at the prefeasibility stage in p

    Jan 1, 2007

  • AUSIMM
    Maximising Productivity through Big Data, Simulation and Predictive Analytics

    By M T. Grigoleit, M S. Schneider

    The iron ore industry in Australia has, in recent years, experienced an unprecedented growth phase. But now that major expansions are moving into the operation phase, new challenges have emerged. Wher

    Jul 13, 2015

  • AUSIMM
    The Novel Technology of Inorganic Solidified Foam with High Expansion for Preventing Coal Spontaneous Combustion

    By B T. Qin, C Zhu, Y W. Jia, Y Lu, F L. Li, Q L. Shi

    Air leakage through rock fractures in coal mining is a major cause of coal spontaneous combustion. In order to overcome the deficiency of the existing fire control technology and prevent coal spontane

    Aug 31, 2015

  • AUSIMM
    The Benefits of Using SmartEar™at Pueblo Viejo

    By D Shuen, R Sales, D La Rosa

    Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting

    Sep 1, 2014

  • AUSIMM
    Geometallurgy at Rio Tinto Iron Ore – a New Angle on an Old Concept

    By C M. W Boyle, E K. C Phuak, A Lewan, E Ryan, M D. Paine, P H. Mackenzie

    "Rio Tinto Iron Ore (RTIO) has an extensive history in the application of geometallurgy to the iron ore value chain. Fundamental to this has been the geological logging of material types which are ass

    Jun 15, 2016

  • AUSIMM
    Successfully Implementing Technology-driven Change in the Mining Environment

    By B McCarthy

    Mining has been typified of late as a boom and bust, cyclical industry operating against a steady decline in the size and quality of mineral deposits. Decreasing deposit grades and increasing costs of

    Jun 22, 2016

  • AUSIMM
    Higher Energy Bulk Explosives – Matching Products to Rock Types Using an Energy Map Concept

    By S Thomson, G Rigby, J Norgard, D Wilkinson

    Bulk explosives provide the energy to move a rock mass and reduce it to an optimal size (fragmentation). The intensity of energy needed depends on several factors including a customer’s geology and en

    Aug 24, 2015

  • AUSIMM
    Pyrite Oxidation Rates Determined Based on Quantitative Mineralogy of Long-Term Column Leaching Tests

    By N DavT

    Pyritic tailings from the Quirke mine waste management area in Elliot Lake, Ontario were subjected to long-term column leaching experiments in two PVC columns measuring 122 cm in height and 15.2 cm in

    Jan 1, 2003

  • AUSIMM
    Getting the most from existing processes: using cleverly designed experiments to optimise the line 3 AG mill at Boyne Smelters Limited

    By T G. Vizcarra, T J. Napier-Munn, A T. Karbowiak, M G. Hart

    Squeezing extra performance from existing equipment (‘sweating the assets’) is key to continuous improvement initiatives, particularly during times of cost cutting where the option of spending additio

    Aug 29, 2018

  • AUSIMM
    The challenges of producing high purity quartz

    By D Connelly

    Quartz deposits are common in nature but the presence of quartz suitable for yielding high purity quartz is exceedingly rare. This paper describes a test work study on producing high purity quartz (HP

    Sep 1, 2024

  • AUSIMM
    Slope radar monitoring – a partnership and infrastructure case study of scalability, reliability and availability

    By E Shilov, R Dixon, L Tovey

    BHP Western Australian Iron Ore (WAIO) operations use a suite of slope monitoring systems which are deployed to operational areas based on the ground control risk. Slope Radars are one system used wit

    Nov 29, 2022

  • AUSIMM
    Proterozoic Iron Oxide-copper-gold Mineralisation in the Kangdian Region, South-west Yangtze Block, China – A Case Study on the Yinachang Fe-Cu-Au-Rare Earth Element Deposit

    By J Ding, H J Peng, S B. Zhu, L Hou, J R. Zhang, S Y. Wu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Numerous Fe-Cu-Au-rare earth element (REE) deposits have been identified within the Palaeop

    Mar 18, 2015

  • AUSIMM
    Optimising Project Value and Robustness

    By W Stange, N Hanson

    An important aspect of the project evaluation process is the achievement of a clear and quantitative understanding of the primary drivers influencing project value and risk. A business scenario-based

    Jan 1, 2007

  • AUSIMM
    Evaluation of the Blue Cube MQi Slurry Analyser for Application in an Advanced Control System for the Optimisation of a Gold Sulfide Flotation Circuit

    By D van der Spuy, T Kewe, K Keet, N Moffatt, A P. Paine

    The Blue Cube Mineral Quantifier Inline (MQi) instrument uses reflective light spectroscopy and advanced chemometrics to measure mineral or elemental grade in a slurry line. The instrument takes scans

    Sep 1, 2014

  • AUSIMM
    The Geology of the Eloise Copper-Gold, Deposit, NW Queensland, Australia

    By T. Baker

    The Eloise Cu-Au deposit is 60 km SE of Cloncurry in NW Queensland and has a current indicated reserve of 3.2 Mt @ 5.8 per cent Cu, 1.5gA Au and I9g/t Ag. It is hosted by metasediments and metabasic

    Jan 1, 1994

  • AUSIMM
    The Mt Kasi Gold Mine, Fiji (92159131-93f3-4adb-8a50-03b7b9ccff8e)

    By Taylor GP

    Mining Lease SML 57 was registered to Mount Kasi on 5 January, 1995. The Mount Kasi gold mine is located in Vanua Levu, Fiji's second largest island and operated from 1932 to 1946 producing 261,

    Jan 1, 1995