Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Distribution behaviour of B and P in Si-slag system at 1500°C

    By M A. Rhamdhani, K Avarmaa, A Putera, J Chen, G Brooks

    Silicon-based photovoltaic cells are currently the most dominant types applied to convert solar energy to electricity. In solar-grade silicon (SG-Si), the control of boron (B) and phosphorus (P) is ve

    Jun 19, 2024

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    Seismic Stability Analysis of Sangan Iron Mine Project Tailings Dam

    By N Ganjian, A Delavar, F Rashidi Nejad

    Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft

    Jul 27, 2015

  • AUSIMM
    Predicting Lump and Fines Finished Product Grades and Lump Percentage from Head Grade

    By K Jupp, T J. Howard

    Cliffs Natural Resources Pty Ltd (CNR) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three locations, separated by many kilometres. The ore is stockpiled

    Jan 1, 2009

  • AUSIMM
    Ernest Henry Underground Mine – Access and Support Infrastructure Design

    By P Christen

    The Ernest Henry Copper gold mine situated in North West Queensland, Australia, is owned and operated by Xstrata Copper. Currently the open pit produces 11 Mtpa of ore. With open pit mining ceasing in

    Mar 21, 2011

  • AUSIMM
    Improving the dewatering efficiency of clay-rich tailings in saline water

    By D Liu, M Edraki, L Berry

    The presence of clay minerals slows down the settling rate and mitigates compact consolidation efficiency in tailings dewatering. The increasing use of saline water in many plants, affects the dewater

    Jul 23, 2018

  • AUSIMM
    Kempfield Silver, Barite and Base Metal (Pb-Zn) Deposit, Lachlan Orogen, Eastern Australia

    By D Timms

    The Kempfield deposit is located in the Hill End Trough, one of several intracratonic basins developed during Silurian–Devonian time, in the eastern province of the Lachlan Orogen, Eastern Australia.T

    Aug 22, 2011

  • AUSIMM
    Fractured Vertical Wells Versus Horizontal Boreholes for Methane Drainage in Advance of Mining U.S. Coals

    By Mahyera A, Sakashita B, Ahmed U, Abou-Sayed AS

    Gas in U.S. coals is primarily composed of 90 to 99 percent methane and up to 10 per- cent carbon dioxide. In composition and heat- ing value, this coal-bed gas is similar to natural gas and can be

    Jan 1, 1982

  • AUSIMM
    Automated Production Data Collection and Reporting at a Large Open Pit Mine

    By T Mattiske

    The Fimiston Open Pit (commonly referred to as the æSuper PitÆ) is a part of the Kalgoorlie Consolidated Gold Mines Pty Ltd (KCGM) operation in Kalgoorlie-Boulder. KCGM manages the Fimiston Open Pit,

    Jan 1, 2002

  • AUSIMM
    Systems Modelling for Water Management in Mining and Minerals ù Bowen Basin Coal

    By C Hedemann, N Silveste, H Davis, C J. Moran

    For nearly two decades water scientists have been debating the need to use appropriate models for the questions being asked and the data available. This paper puts forward a rationale for a hierarchic

    Jan 1, 2006

  • AUSIMM
    How are Indian mills changing their feedstock in order to address decarbonisation goals?

    By D Goel

    India, the second-largest steel manufacturer globally, achieved crude steel production of around 126 million tonnes (Mt) in the last financial year of April 2022 to March 2023 (FY23), against an insta

    Sep 18, 2023

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Analysing impact forces and overcoming speed, heat and pressure issues in high capacity belt support applications

    By C T. Portelli

    Belt conveyor transfers are the most likely location for high wear rates and failures. Belt transfers are necessary to change the direction of conveyed material and will remain a part of belt conveyor

    Sep 18, 2023

  • AUSIMM
    Steve and Fred would have been mates – a comminution design evolution story

    By D David

    Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i

    Sep 11, 2017

  • AUSIMM
    Modelling multi-seam interactions for longwall mining

    By A Lines

    This paper addresses a gap in longwall multi-seam interactions and their predictions, providing a case study for future multi-seam operations for both anticipated conditions and a method for understan

    Nov 30, 2018

  • AUSIMM
    The Simple Facts about Sampling Gold Ores

    By T Day, I G. Robertson, G J. Lyman

    "Various approaches are used in the industry for establishing procedures (sample mass estimation and method of subsampling) for sampling and analysis of gold ores. The key factors that determine the a

    Oct 10, 2016

  • AUSIMM
    The Use of Customer Operated Bulk Emulsion Systems for Improved Productivity at the Tara Underground Operations

    By A Suokas

    Boliden Tara Mines Ltd, located in County Meath Ireland, produce in excess of 2.5 million tonnes per annum of ore from the underground resource located 40 miles north west of Dublin. The zinc-lead ore

    Jan 1, 2005

  • AUSIMM
    Assessment of climate risk in the Australian mining industry

    By M Allen

    By its nature, the mining industry is energy and emissions intensive. In the future, the world will still require the outputs of mining but the industry will need to adapt to the low emissions economy

    Jul 25, 2018

  • AUSIMM
    The evolution of seismicity and ground control measures at Ernest Henry Mine

    By H Esterhuizen

    The Ernest Henry Mine (EHM) in Queensland, Australia is a Sub-level Caving operation that started production below the previously mined open pit at a depth of 535m. Current Production mining has progr

    Nov 30, 2018

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007