Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development Of A Subsidence Database And Determination Of Subsidence Parameters

    By Syd S. Peng

    A total of 209 cases of subsidence data over longwall panels in 16 US coal seems have been collected and built into a subsidence database. The database is developed under MS Windows environment. It us

    Jan 1, 1995

  • SME-ICGCM
    Applications Of Cement Grouting Method For Controlling Weak Strata

    By Herryal Z. Anwar

    In recent years, many both mining and civil engineering projects are developed in the area which may be categorized unstable, such as fractured and jointed rocks or "water sensitive rocks". For exampl

    Jan 1, 2000

  • SME-ICGCM
    Research, Development, And Use Of Steel-Fiber-Reinforced Concrete Cribbing For Mine Roof Support

    By Dale A. Didcoct

    Through the combined efforts of the C. S. Bureau of Mines, the coal industry, and Burrell Construction and Supply Company, New Kensington, PA, a steel fiber reinforced concrete crib block to improve c

    Jan 1, 1982

  • SME-ICGCM
    The Utilization Of Rockbolting Technology And Monitoring Techniques In The German Coal Fields

    By Thomas Lautsch

    After a short description of geology and gateroad roof support technology in the German coalfields the development of roof bolting as primary roof support is presented. Based on geotechnical parame

    Jan 1, 2000

  • SME-ICGCM
    Design Considerations for Tensioned Bolts

    By Yunqing Zhang

    The 3-D numerical modeling using ABAQUS is performed to analyze the mechanisms of the tensioned bolts by taking into considerations excavation sequence, pre-tension, bedding planes and in-situ horizon

    Jan 1, 2002

  • SME-ICGCM
    Case Study of Conditions Observed During the Removal of a Highly Fractured Roof Beam in Bedded Halite

    By Liane J. Terrill

    A 9O) ft (275 meter) section of a highly fractured beam of halite was mined from the roof of a supported thirteen year old drift at the Waste Isolation Pilot Plant (WIPP). The operation was conducted

    Jan 1, 1997

  • SME-ICGCM
    Determination Of The Stopline Subsidence Profile Of Phalen 2 West Panel From Within A Near Horizontal Borehole Over The Panel Stopline

    By William D. Gallant

    This paper presents the results of a joint cooperative research project between the CANMET Cape Breton Coal Research Laboratory and the Cape Breton Development Corporation to observe the subsidence pr

    Jan 1, 1990

  • SME-ICGCM
    A Case Study Of Grouted Roof Bolt Loading In A Two-Entry Gate Road

    By Stephen P. Signer

    A field test was conducted by the U.S. Bureau of Mines at the Cyprus Plateau Starpoint No. 2 Mine. near Price. UT. to study the support rock interaction mechanics. Twelve instrumented. fully grouted r

    Jan 1, 1990

  • SME-ICGCM
    Underground Application Of Optimization

    By S. J. Jung

    The goal of this research is to demonstrate how optimization methodology can be coupled with the finite element method for greater stability of underground mine openings. As a result of increasing min

    Jan 1, 1993

  • SME-ICGCM
    Roof Sounding Device - A Loose Rock Detector

    By Richard C. Repsher

    The U.S. Bureau of Mines has developed a method and device designed to detect lose rock material in underground mines. The technology is designed to be an aid to mine workers in detecting hazardous ro

    Jan 1, 1990

  • SME-ICGCM
    Case Study of the Effect of Stratigraphic Location on Roof Stability in Rock Salt

    By Chris T. Franke

    The Waste Isolation Pilot Plant is a deep underground facility mined in bedded salt interspersed with persistent clay inter- beds. The clay seams delineate beams of salt above and below the excavation

    Jan 1, 1997

  • SME-ICGCM
    Pillar Collapse at Welgedacht Colliery, South Africa: A Case Study

    By J. Nielen van der Merwe

    During the process of pillar extraction at the Welgedacht Colliery, an unexpected pillar collapse resulted in the entrapment of equipment. The area was visited soon after the event to evaluate the sta

    Jan 1, 1999

  • SME-ICGCM
    Numerical Modeling of the Gob Loading Mechanism in Longwall Coal Mines

    By Khaled Morsy

    Longwall mining is one of the most widely practiced underground coal mining method. The behavior of the longwall gob is very critical in the understanding of the complex ground response to longwall mi

    Jan 1, 2002

  • SME-ICGCM
    Design Of Roadway Support Using A Strain Softening Model

    By Jamal Hematian

    Understanding the behaviour of rocks in a high horizontal stress field, such as that in Australia, is critical when analysing the stability of underground structures. This paper addresses the signific

    Jan 1, 1994

  • SME-ICGCM
    Optimun Mining Plan for Multiple Seam Mining

    By Wen H. Su

    Multiple seam mining and its associated problems are very serious in Southern West Virginia where poor planning or lack of knowledge in seam interaction often results in complete loss of coal propert

    Jan 1, 1984

  • SME-ICGCM
    Influence Of Partings In A Coal Seam On Long Term Pillar Stability

    By K. Biswas

    So far, all pillar design methods or approaches consider the coal seam as a uniform structure From some mine visits in northern Appalachian Region. it is found that some coal seams have binder or part

    Jan 1, 1995

  • SME-ICGCM
    Alternatives For Controlling Cutter Roof In Coal Mines

    By Nicholas P. Kripakov

    The unpredictable massive collapse of roof in openings developed under apparently safe and stable roof conditions in coal mines of the United States has been of much concern for many years. One type o

    Jan 1, 1982

  • SME-ICGCM
    Field Evaluation of Yield Pillar System at a Kentucky longwall Headgate

    By Christopher Mark

    The Bureau of Mines is conducting research to assess the effectiveness of different chain pillar designs in maintaining gate entry stability. The study described in this paper was performed in a 1200

    Jan 1, 1988

  • SME-ICGCM
    Geotechnical Investigation For A Single Entry Design For Longwall Mining

    By Madan M. Singh

    Currently longwall coal mining operations require at least 3 entries on both the headgate and tailgate ends because of ventilation and safety requirements. Driving of entries, however, is a slow and c

    Jan 1, 1982

  • SME-ICGCM
    Violent Coal Pillar Collapse -A Case Study

    By André Zingano

    Pillar collapses have been studied for several years and can be classified into two types: nonviolent squeeze or violent pillar collapse, i.e., controlled or uncontrolled pillar collapse. Underground

    Jan 1, 2004