Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Multiple Seam Mining Feasibility in the Illinois Basin (USA): LaModel Stress Analysis Programs

    By Rebecca Hardy

    The escalating demand for coal, in addition to the steady depletion of reserves, has produced increasingly difficult mining conditions for coal mining companies within the United States, resulting in

    Jan 1, 2006

  • SME-ICGCM
    Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit

    By S. Yamashita

    Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th

    Jan 1, 1996

  • SME-ICGCM
    Think Like a Roof Bolt ? Then Make It Scream ?

    By Greg Smith

    This paper documents the use of bench testing equipment developed to enhance the understanding of, and improve upon, common roof bolt support systems. Most roof bolt systems consist of components that

    Jan 1, 2012

  • SME-ICGCM
    Numerical Modeling for Roadway Support Systems ? A Comparison for Single and Multiple Seam Mining

    By Axel Studeny

    Geomechanical-numerical methods are an established tool for planning of underground excavations worldwide. By describing the interaction between heterogeneous layered strata and support elements it is

    Jan 1, 2007

  • SME-ICGCM
    Intrinsic Response Of Borehole Pressure Cells Laboratory Calibration And Nonlinear Fem Simulation

    By D. Su

    This paper presents the details and results of a preliminary investigation into the response of borehole pressure cells (BPCs) in soft coal. Two parallel approaches, laboratory calibration and nonline

    Jan 1, 1990

  • SME-ICGCM
    Caving, Seismicity, and Mine Design in Four Utah Mines

    By Hamid Maleki

    Having developed a methodology for estimating mining-induced seismicity resulting from slip along geological discontinuities in 2003, in this paper, the importance of measurements are high-lighted in

    Jan 1, 2006

  • SME-ICGCM
    Surface Subsidence. in Longwall Mining--A Case Stud

    By R. D. Yancich

    A case study of longwall mining surface subsidence was performed at a mine in Southwestern Pennsylvania. The mine operated in the Pittsburgh coal seam which averaged 70-72 inches with 6-8 inches draw

    Jan 1, 1984

  • SME-ICGCM
    Development and Field Tests of Look-Ahead Radar and Horizon Sensing for Coal Cutting Drums

    By Gerald L. Stolarczyk

    Safe and efficient coal extraction requires advanced radar subsystems that can be mounted on cutting drums of coal cutting machines. A look-ahead radar (LAR) must solve the radio geophysics problem o

    Jan 1, 2006

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • SME-ICGCM
    Prediction of surface movement with emphasis on horizontal deformation due to mining

    By Mao Bai

    In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e

    Jan 1, 1989

  • SME-ICGCM
    Ropes mine crown pillar rock mechanics

    By W. G. Pariseau

    A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to

    Jan 1, 1989

  • SME-ICGCM
    Development and Application of Geotechnical and Rockmechanical Standard Planning System for Roadway Development in German Coal Mines

    By K. H. Brandt

    A standard planning system for the development of roadways was adopted for German coal mines based on the results of geotechnical and rockmechanical investigations. Its goal is to provide for sufficie

    Jan 1, 2004

  • SME-ICGCM
    Footwall Stability and Final Pit Design in the PT. Adaro Coal Mine, Indonesia

    By Takashi Sasaoka

    The PT. Adaro Coal Mine targeted in this research is located in South Kalimantan, Indonesia. The coal production of this mine is increasing year, with about 35 M tons of coal produced in 2006. Th

    Jan 1, 2008

  • SME-ICGCM
    On Rock Failure Criteria for Coal Measure Rocks

    By Murali Gadde

    Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its

    Jan 1, 2007

  • SME-ICGCM
    Bi-Directional Shield Recovery in a Wide Face Longwall Move with a Pre-Driven Recovery Room under Weak Roof Conditions

    By Peter Zhang

    Shield recovery in a longwall move is normally conducted from tailgate to headgate. However, if the face is wide and the immediate roof is weak, difficult conditions with considerable roof sag, excess

    Jan 1, 2007

  • SME-ICGCM
    Pillar Design Considering the Plastic Behavior of the Coal Seam

    By Andre Zingano

    The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as

    Jan 1, 2012

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov

    Jan 1, 2012

  • SME-ICGCM
    Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)

    By Ted Klemetti

    Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep

    Jan 1, 2009

  • SME-ICGCM
    Cavability Study Of A Competent Roof - A Case Study

    By T. N. Singh

    An evaluation was made on the cavability of the roof formation of Dishergarh seam including caving sequence, caving span, and load on powered support.

    Jan 1, 1994

  • SME-ICGCM
    Technical Assessment of Subsequent Burdens due to Hard Coal Mining

    By Axel Preusse

    On the basis of the Law on Financing Hard Coal Mining dated 28 December 2007, the subsidized German hard coal mining industry will be shut down to the end of the year 2018 in a socially acceptable man

    Jan 1, 2008