Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case StudyBy P. Tsang
The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different
Jan 1, 1989
-
Roof Control Problems on Development and Longwall Gateroads at a South- western PA Coal MineBy T. P. Mucho
Over the past several years, two types of roof control problems have been en- countered at Beth Energy's Eighty Four Complex mine in Southwestern Pennsylvania. These problems have been (1) poor r
Jan 1, 1986
-
Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping SeamBy M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.
Jan 1, 1996
-
In-Seam Seismic Tomography Mapping Application To Coal Mining ProblemsContinuing with the effort of providing new and more effective exploration methods to the mining industry, where direct methods (drilling, cross-cutting, etc.) are not applicable, either for logistica
Jan 1, 1996
-
Laboratory And Field Characterization Of Immediate Floor Strata In Illinois Basin Coal MinesBy Yoginder P. Chugh
The characteristics of weak floor strata associated with actively mined coal seams in Illinois are very important from ground stability point of view and, in many cases, are the governing factors in d
Jan 1, 1989
-
Development of in-situ stress measurement technique using ultrasonic wave attenuation method - A progress reportBy Y. L. Sun
The feasibility of using the ultrasonic wave attenuation method for measuring in-situ stress is examined theoretically and experimentally. The theoretical analyses show that for a given rock type the
Jan 1, 1989
-
Effect Of Water On Stability Of Mine RoadwaysThe basic objectives of mine roadways are to provide sufficient cross sections in order to meet the needs of accommodation of equipment, transport, personnel travel and ventilation. However, many road
Jan 1, 1996
-
A Mine Evaluation Protocol Using Applied Rock Mechanics TechniquesBy Gary B. Petersen
The author has developed a seven-step process called the Applied Rock Mechanics (ARM) Protocol that the author has used to solve numerous roof stability problems in mines throughout North America sinc
Jan 1, 2012
-
Classification Of Large Seismic Events At The Lucky Friday MineBy J. K. Whyatt
The paper presents an approach to design a multi level room and pillar layout in a 40m thick seam overlain by a major aquifer. The design was required to maximise extraction with due consideration of
Jan 1, 1996
-
Ultra-Close Multiple-Seam Mining ? Analysis and VerificationBy Daniel W. Su
This paper presents the results of a detailed geotechnical study on the potential multiple seam interaction between the No. 2 Gas (upper) and the Powellton seams, which are separated by an average int
Jan 1, 2012
-
Development of Timedependent Surface Subsidence Over the Total Extractions Areas of the Potash Beds Stoped with Interchamber Yield PillarsBy M. P. Nesterov
The method of predicting the time-dependent surface subsidence for gently-inclined potash deposits where total extraction using various sizes of yielding bamier pillars was discussed.
Jan 1, 1998
-
Ground Control and the Inundation of the Retsof MineBy Vincent A. Scovazzo
On March 12, 1994, the 1,100-foot deep 2 Yard South panel of the 1l0 year-old Retsof Mine collapsed. At the time of this occurrence, the Retsof Mine was characterized as the world's largest, most
Jan 1, 1997
-
Estimation of in-situ material strengthBy Danell. R. E.
A drill monitoring system has been developed which measures performance characteristics of a rotary drill and relates this to the material strength and rotary specific energy. The drill monitor is com
Jan 1, 1989
-
Theoretical analysis of breaking strength of mine pillars and test specimensBy D. S. Choi
This paper presents a theoretical analysis of the effect of shape and size on strength of geologic materials. The results indicate that the shape effect is caused by the development of confining press
Jan 1, 1989
-
Comparison Of Predictions And Measurements Of Subsidence Caused By Underground Mining In Northern AppalachiaBy H. J. Siriwardane
This paper presents results from three case studies involving longwall mine panels at which the measured ground movements were compared with the numerical model predictions based on the finite element
Jan 1, 1988
-
Geostatistical Methods For Hazard Assessment And Site Characterization In MiningBy Jennifer Riefenberg
Ground control hazards, coal quality, ore reserve estimation, and pollution modeling seem unrelated topics from most mining perspectives. However, geostatistical methods can be used to characterize ea
Jan 1, 1996
-
Geomechanical Support Of Adaptive Mining TechnologyBy I. V. Baklashov
Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad
Jan 1, 1996
-
Clay Veins: Their Physical Characteristics. Prediction, and SupportBy Frank E. Chase
Clay veins, also referred to as clay elastic dikes, have been responsible for numerous underground injuries and fatalities. These hazardous structures are also responsible for increased production cos
Jan 1, 1984
-
Stability analysis and characterization of ground subsidence of abandoned lead-zinc mines in northeastern OklahomaBy M. M. Zarnan
This paper presents the results of s study involving characterization of ground subsidence of abandoned lead-zinc mines in northeastern Oklahoma. Two coordinated efforts were undertaken: (1) collectio
Jan 1, 1989
-
Monitoring Roof Beam Lateral Displacement At The Waste Isolation Pilot PlantBy L. J. Terrill
Lateral displacement in the immediate roof beam at the Waste Isolation Pilot Plant (WIPP) is a significant factor in assessment of excavation performance for the design of ground control systems. Info
Jan 1, 1996