Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design Of Bored Piles In Chalk At The New Medway Crossing Based On Instrumented Load TestsBy David J. Puller
As part of the value engineering process on a major Design Build highway project, instrumented trial pile load tests were used to achieve savings in cost and time on the foundations for a major river
Jan 1, 2002
-
Piled Rafts In Geotechnical Practice - An International PerspectiveBy Michael W. Neill, O&apos
The performance of foundations that combine the high bearing capacity of rafts (mats) with the settlement reduction capability of piles is described through a summary of 24 case histories. Structures
Jan 1, 2003
-
Recovery Efforts At The World Trade Center "Bathtub"By George J. Tamaro
In 1967 the Port Authority of New York and New Jersey undertook the construction of the World Trade Center (WTC) diaphragm walls, installation of the lateral support system and the excavation of the s
Jan 1, 2002
-
Sheet Piling Bridge AbutmentsBy Robert J. Carle
This paper reviews a variety of highway structures which have been built using steel sheet piling as the permanent structural elements of bridge piers, abutments and wingwalls. Those structures built
Jan 1, 1989
-
Performance Of Drilled Displacement Piles In The Midwestern United StatesBy W. Morgan NeSmith
Drilled displacement (DD) piles often develop significantly larger unit shaft resistance values than other drilled or augered pile systems in coarse grained materials. Minimal vibration and limited sp
Jan 1, 2009
-
Use Of High Capacity Grouted Tension Piles Installed Vibration Free And Soil DisplacingBy Peter de Kort
Tunnels in urban areas generally require deep excavations in soils under the groundwater table. In The Netherlands uplift loads are generally taken by piles installed into dense sand layers, which are
Jan 1, 2008
-
Piling In Coal Measures At The City Of Manchester Stadium For The Commonwealth Games 2002By Colin Curtis
The City of Manchester is hosting the 2002 Commonwealth Games. A world class Stadium with a 38,000 capacity was commissioned for a site located close to the City Centre. The Stadium location is in an
Jan 1, 2002
-
The Practical Application Of Pile Reuse At Bow Bells House, City Of LondonBy Justin Phillips
The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin
Jan 1, 2008
-
Helical Piles Performance In Golestan Loess Deposits Via Fullscale And Physical Modeling TestingsBy Abolfazl Eslami, Fatemeh Rostami, Sara Heidarie Golafzani, Mohammad Arabameri
Collapsible loess is classified as problematic soil found in most continents. The loess immediately collapses under stresses induced by axial compressive loading or the soil weight when exposed to moi
Oct 1, 2022
-
University Of Minnesota Football Stadium Down Hole Pile: Innovative Solution For Difficult ConditionsBy Eric J. Pederson
The down hole hammer is widely used in specialty geotechnical construction. The common uses include tie-back anchor installation, micropile installation, and general soil/bedrock drilling operations.
Jan 1, 2008
-
Numerical and Theoretical Analysis of Consolidation of Soft Clay Installed With PVD at Nagapattinam - A Case StudyBy KeerthiRaaj Subrmanian, Muthukkumaran Kasinathan
"A railway embankment is under construction between Nagapattinam to Thiruthuraipoondi covering 36.5 km. The sub-soil strata comprises of soft clay extending up to 10 m below existing ground level, whi
Jan 1, 2015
-
Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground FloorsBy Wolfram Groh
New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo
Jan 1, 2002
-
Use of Post-Grouted Drilled Shafts in Coastal MississippiBy Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues
"Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual
Jan 1, 2015
-
Slope Stabilization of Mill Creek Landslide Using Steel H-PilesBy Kessi E. Zicko, Eric A. Hackenberg, Paul J. Lewis
"Following snow melt and spring rains in 2011, a landslide measuring approximately 600 feet long and 300 feet in slope length occurred within the southbound roadway embankment of a heavily travelled 2
Jan 1, 2015
-
Prestressed Concrete Sheet Pile Retaining Wall to Support Railroad Embankment Widening Adjacent to a WetlandBy Abhijit R. Sheth, Craig M. Benedict, John Brun, Ara G. Mouradian
"Amtrak recently replaced the 1907-era bascule two-track bridge over the Niantic River between East Lyme and Waterford, Connecticut. The project included new approach embankments, with approximately 2
Jan 1, 2017
-
Numerical Analysis of Mono and Group Suction Piles under Lateral Loadings in Layered Deposits (6db428d8-c029-43b4-b834-4c0cdce8dd47)By Ilhan Chang, Ernest Nsabimana, Kiseok Kwak, Juhyung Lee, Young-Hoon Jung
"Numerical analyses were performed to analyze the behavior of two different type of suction piles (mono type and group type) under various soil layer conditions (uniform silty clay layer, uniform silt
Jan 1, 2017
-
Hammer-Grout Piles At The Bronx-Whitestone BridgeBy Ameir Altaee
Unconventional means and methods were utilized to install over 650 contractor-designed micro-piles for the replacement of the Bronx approach to the Bronx-Whitestone Bridge in New York City. The metho
Jan 1, 2010
-
Preliminary Assessment of Reliability and Sampling Requirements for Deep Mixing Method (DMM) Foundations for LNG Processing Facility and Storage Tank (52fd79c3-58e2-4970-9b21-5f8e12930105)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Attasit Korchaiyapruk, Edward C. Clukey
"A deep mixing method (DMM) foundation was selected by the Project Team for a very large LNG facility in West Africa. As described in a companion paper, this foundation consists of a large number of c
Jan 1, 2017
-
Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data CollectorsBy Donald T. Robertson
This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p
-
Sustainability and Consideration of the Re-Use of Foundations for the Hurricane Deck BridgeBy Timothy C. Siegel, Paul J. Axtell
The Missouri Department of Transportation (MoDOT) recently replaced the Hurricane Deck Bridge that carries Highway 5 traffic across the Osage Arm of the Lake of the Ozarks in Camden County, Missouri.
Jan 1, 2017