Grouted Micropiles for Foundation Remediation in Expansive Soil (8th Michael W. O?Neill Lecture)By John D. Nelson
Foundation underpinning is a common component of remediation schemes for distressed foundations on expansive soils. For many applications in expansive soil, micropiles have distinct advantages over ot
Aug 1, 2013
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Hudson’s Revitalization: The Use of Robotics in the Work PlaceBy Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific OceanBy Ihab Allam PE, Meeok Kim. PE. Ph. D
The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa
-
Innovative Integrated Jet Grout And Contiguous Cfa Piled Solution For Complex Deep Shoring Wall In Soft Soils – Retaining Structural Design And AnalysisBy W. L. Chong, Y. Zou
There are many types of Earth Retention Systems (ERS) available in the market where more than one method can be a feasible solution for a project. This paper examines the design and construct process
Nov 1, 2022
-
Experimental Study on the Bending Failure Properties of Cement-Treated SoilBy Takeru Fukaya, Tsutomu Namikawa
"The bending tensile stress occurs in the ground improvements when external forces are applied to the column and wall shaped ground improvements. Therefore, in the design of the column and wall shaped
Jan 1, 2015
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
Meadowlands Megaproject: 9,000 Piles and CountingBy Ronald D. Boyer
"Early in the design stage of Meadowlands Xanadu, the client’s project director informed me that “after construction, nobody is going to come to Xanadu to see the foundations.” My response was, “Well,
Jan 1, 2009
-
Evaluation Of Causes Of Bleeding Of Free Water From A Bentonite SlurryBy Tony P. Suckling
This paper describes an investigation into the bleeding behaviour of bentonite slurry observed on a trial diaphragm wall panel. The bleeding is thought to be due to the bentonite experiencing a chemi
Jan 1, 2011
-
Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, GaBy Robert L. Goehring, Fred Munene
This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.
-
Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, TurkeyBy Carlandrea Albonico, Salvatore Miranda
The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc
Nov 1, 2022
-
Settlement Reducing Auger Cast-In-Place Piles below a Mat Foundation of a 41-Story StructureBy Swaminathan Srinivasan, Aaron J. Muck
"When an opportunity arises to combine state-of-the-art concepts with advanced modeling tools, engineers need to take what they know and apply forward thinking to geotechnical solutions to promote the
Jan 1, 2015
-
Comparing Conflicting Conclusions from Different Integrity Testing Methods on the Same Drilled ShaftsBy Alex Ryberg, Matthew L. Becker
Several integrity testing methods exist which may be used to evaluate drilled shafts. Each test method has advantages and limitations. On occasion, the results from different test methods may lead to
Sep 8, 2021
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Material Properties for Analysis of Deep Mixing Support SystemsBy Alex Grenoble, Alex Reeb, George Filz, Farzad Abedzadeh
"This paper summarizes available information on the characteristics and properties of deep-mixed soilcement produced by the wet method. The topics covered in this paper include: unit weight, unconfine
Jan 1, 2015
-
Collaborative Data Sharing During Seepage Barrier Wall Construction at Bolivar Dam – Perspectives from Owner, Contractor and Sub-ContractorBy Robert Bachus, Jamey Rosen, Fabio Santillan, Georgette Hlepas
"A seepage barrier of length 4,800 feet and maximum depth 144 feet is being installed at Bolivar Dam in Ohio. This project is owned by the United States Army Corps of Engineers and contracted to Trevi
Jan 1, 2017
-
Alternative Design and Construction Method for Clinton CSO Underground Storage FacilityBy Meeok Kim, Paul Beljan, Gordon Chen
"Clinton combined sewer overflow storage (CSO) facility project developed by the Department of Water Environment Protection of Onondaga County, New York, is to improve sewer facilities and infrastruct
Jan 1, 2015
-
Economic Design Of Piling Platforms On Coarse Grained SubgradeBy Patrick Wong
The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv
Nov 1, 2022
-
Cockatoo Island Seawall Seepage Barrier – Permeation Grouting, Jet Grouting and a Soil/Cement/Bentonite Mixed Slurry Capping TrenchBy Chris L. Powell, Russell J. Denny.
"The remotely located Cockatoo Island iron ore mine off the Kimberly coast in Western Australia, which has been in operation since 1951, was recently expanded up to 50m below sea-level using staged co
Jan 1, 2016
-
Deep Foundation Advancements in FargoBy Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019