Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Low Energy Anode Developments in Zinc Electrowinning

    By H. Aaltonen, T. G. Robinson, M. Morimitsu

    "The energy required to plate pure zinc can be the most significant operating cost for an operator in the production of electrolytic zinc. This paper reports on developments on low energy Outotec coat

    Jan 1, 2016

  • CIM
    Chemical Modelling Of The Fe2(SO4)3–FeSO4–H2SO4–H2O System

    By J. D. T. Steyl, C. A. Biley

    "The chemistry of electrolyte systems containing iron remains generally poorly understood despite their prevalence in many natural and industrial processes, particularly in hydrometallurgy. These syst

    Jan 1, 2016

  • CIM
    Improving Fine Particle Gravity Recovery through Equipment Behavior Modification

    By Claude Deveau

    "Studies on the performance of Falcon batch type concentrators treating ultrafine tantalum at Tanco have revealed that very fine heavy minerals are concentrated within certain areas of the concentrate

    Jan 1, 2006

  • CIM
    Carbon Dioxide Use for pH Control at Greens Creek Mill

    By Tim Martin, Dave Tahija

    "In April, 2014, Hecla's Greens Creek mill, near Juneau, Alaska, switched from sulphuric acid to the use of dissolved carbon dioxide for lead flotation circuit pH control. The Greens Creek mine uses p

    Jan 1, 2016

  • CIM
    Enhancing Cobalt Recovery from Copper/Nickel Matte Producing Smelters

    By V. I. Lakshmanan

    Process Research ORTECH Inc. (PRO), with its in-depth knowledge on cobalt behaviour in nickel matte smelters and its novel mixed chloride hydrometallurgical processing, is developing a hybrid process

    Jan 1, 2019

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • CIM
    Kairos Mining: A Comprehensive Approach to Sustained Long-Term Benefits in Copper Processing Plant Automation

    By Luis Castelli, Aldo Bonomelli, Giselle Schifferli, Claudio Zamora

    "This paper introduces the operational concept and the description of a multi-site Remote Support Center for knowledge management and long-term process performance improvement.This centralized Support

    Jan 1, 2010

  • CIM
    Water Management and Effluent Treatment Practice

    By C. Larsen, E. Goodwin, E. Konigsmann

    "This paper describes the development of an innovative effluent treatment process for cyanide and heavy metal removal from tailings wastewaters at Hemlo Gold Mines Inc. Golden Giant operation.The impo

    Jan 1, 1989

  • CIM
    Design, testing and performance of the world’s first fuel cell mine vehicle—a production locomotive

    By A. R. Miller, G. Desrivières, T. MacKinnon, H. Bursey, M. C. Bétournay, B. Replogle, D. L. Barnes, P. Laliberté

    "A mine production locomotive, the world’s first applied industrial fuel cell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Pr

    Jan 1, 2004

  • CIM
    Latest Development in Cathode Stripping Machines

    By M. Schmidt, P. Nord, M. Larinkari

    Cathode stripping machine technology has been developed significantly both in electrorefining (ER) and electrowinning (EW) applications in the last ten years. The main driver has been robotic cathode

    Jan 1, 2019

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    Operation of La Mine Doyon

    "At a current mining rate of 3,750 tons per day, La Mine Doyon is currently the largest gold mine in Canada. La Mine Doyon is an open pit gold mine located in the Abitibi area of Northwestern Quebec.

    Jan 1, 1984

  • CIM
    Application of kinetics and liberation data to analysis of an industrial flotation process

    By N. W. Johnson

    "Two analysis tools which have been applied to problems in industrial flotation processes are the application of kinetics and detailed mineralogical or liberation data, both on a size-by-size basis. T

    Jan 1, 1987

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • CIM
    Les Mines INMET Division Troilus - Objet: Extension de la vie des godets des excavatrices DEMAG.

    Les Mines Inmet ? La Division Troilus exploite une mine d?or à ciel ouvert depuis 1996 et produit un concentré de cuivre. La Division Troilus est localisée à 175 KM au nord de la ville de Chibougama

    Feb 1, 2008

  • CIM
    Sidbec-Normines Inc. et la Production de Boulettes à basse Teneur en Silice et de Boulettes a Hauts Fourneaux à Port-Cartier

    By Réjean Lévesque

    SIDBEC-NORMINES a été incorporée en 1976. Depuis la fin de 1977, ses activités comprennent outre la concentration au lac Jeannine, près de Gagnon, du minerai de fer extrait du gisement du lac Fire, I&

    Jan 1, 1979

  • CIM
    Is the double drum hoist still viable at depth? Recent experiences (9ce85c2c-8422-465d-9ba0-c7f38d7a04a5)

    By B. McLaughlin

    "The Penna shaft is the deepest single-lift shaft in North America. Agnico-Eagle started sinking the Penna shaft in 1995 with a hoisting plant capable of hoisting 1800 t/d from a 2240-m deep shaft. Ex

    Jan 1, 2004

  • CIM
    Modification of the Sarcheshmeh Copper Complex Flotation Circuit in Response to a Reduction in Feed Grade

    By S. Banisi, E. Arghavani, A. Akbari, Gh. A. Parsapour, S. Darvish Tafvizi

    The new copper processing plant of the Sarcheshmeh copper complex consists of two parallel circuits. After a primary crushing, the ore is sent to a SAG mill and the product is further ground in a ball

    Jan 1, 2016

  • CIM
    Applications of a Process Control Computer at Brenda Mines Limited

    By C. Larsen, E. Gratch, B. Flintoff, R. Bradburn

    "In 1973 Brenda Mines Limited first investigated the potential use of a process computer to aid in the development of a control system for the concentrator grinding circuit. This initial study and its

    Jan 1, 1978

  • CIM
    Reducing Selectivity in Narrow-Vein Mining through the Integration of Underground Pre-concentration

    By Andrew Bamber

    The introduction of pre-concentration technology into the underground narrow-vein mining scenario has the potential to change the entire economics of utilizing bulk-mining methods in these situations.

    Oct 1, 2004