    Interactions between Slurry Density and Grinding Media Size

    By Claude Bazin, Patricia Obiang

    "The slurry density (pulp percentage of solids) and the size of the grinding media are often used for the optimization of an operating ball mill. In many cases a change of ball size is made at the slu

    Jan 1, 2007

  • CIM
    The Use of Fibre Reinforced Shotcrete Fill Retaining Walls with Engineered Drainage System to Achieve Safe and Efficient Hydraulic Fill Placement in Underground Voids

    Safe underground mine backfilling with hydraulic fill requires efficient fill drainage and stable fill retaining walls or bulkheads. If any or both the above two requirements are not satisfied, such

    May 1, 2007

  • CIM
    National Strategy Overcoming HR Challenges in the Canadian Mining Industry

    Session 1 ? Intro to MiHR ? Business Case for Aboriginal Inclusion ? Overview of the Mining HR Guide for Aboriginal Communities ? Two presentations of Programs featured in the Guide ?? The RAP Pr

    May 1, 2009

  • CIM
    Environmental planning in mine waste management — The Huckleberry Mines experience (CIM BULLETIN)

    By H. F. Letient, D. C. Johnson

    At the 25th Annual B.C. Mine Reclamation Symposium in September 2001, Huckleberry Mines Limited received the Jake MacDonald Reclamation Award for its exemplary mine waste management plan, conceived to

    Jan 1, 2004

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • CIM
    Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding Technology

    By Lyne Côté, Jose Adante

    "The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n

    Jan 1, 2009

  • CIM
    Geology and Mine Development of the Red Dog Zinc Lead Deposit, Brooks Range, Alaska

    By Brigitte J. Dejou

    The Red Dog sediment-hosted zinc-lead deposit is located in the Brooks Range thrust belt in northwest Alaska, approximately 1000 km northwest of Anchorage. The mine constitutes the primary deposit in

    May 1, 2006

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • CIM
    A Standards Based Approach to Mobile Equipment Data

    By Peter Cunningham

    General Description of Projects The objective is to streamline data transfer within our Process Control and Business Systems for the purposes of tracking actual production, reducing manual record kee

    May 1, 2013

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • CIM
    Process Optimization in Mining: The Next Paradigm Shift in Productivity Gain after Mechanization and Automation

    By Christoph Miller

    About 80 years ago the mining industry saw an advertisement of a machine manufacturer: ?One man ? one machine?, meaning the productivity gain by using a pneumatic rock drill instead of manual tools. M

    Oct 1, 2009

  • CIM
    Rabbit Lake project – environmental impact

    By R. L. J. Phillips

    "The environmental impact of the Rabbit Lake project is presented. Baseline data for fish, water, air and radon collected in 1973, 1975, 1980and 1986, are compared with post-development environmental

    Jan 1, 1989

  • CIM
    Mineral processing, research and development projects in Nova Scotia conducted through the Canada/Nova Scotia Mineral Development Agreement

    By D. M. Doyle, P. J. Hannon

    "The Canada/Nova Scotia Mineral Development Agreement (M.D.A.) is a subsidiary of a five-year Economic and Regional Development Agreement, signed on June 11, 1984. The objectives of the M.D.A. are to

    Jan 1, 1987

  • CIM
    Stratigraphic and Structural Constraints on Limestone Exploration: A Case Study from Northern New Brunswick, Canada

    By I. Dimitrov, S. R. McCutcheon

    "Industrial-grade limestone is found in both the Lower Silurian La Vieille Formation and Upper Silurian LaPlante Formation of the Chaleurs Group in northern New Brunswick. Currently, between 150 000 a

    Jan 1, 2007

  • CIM
    Large Tire Users Group: A Collaborative Initiative of the Surface Mining Association for Research & Technology (SMART)

    By Bernard Jones

    LTUG ? A meeting of many mining companies that are using large tires ? Introduction of the mines and size ? Companies go over their usage of tires and performance ? As a group we discuss how the m

    May 1, 2009

  • CIM
    Implementing Safe Production at Kittilä Mine

    The information in this document has been prepared as at February 16, 2011. Certain statements contained in this document constitute ?forward-looking statements? within the meaning of the United State

    May 1, 2011

  • CIM
    Oxidation-Precipitation Method to Treat Cyanide Effluents

    By H. Soto, J. Jara, F. Nava

    "A combination of oxidation and precipitation was used to eliminate cyanide from gold milling effluents. Preliminary laboratory work developed with both synthetic cyanide solutions and with industrial

    Jan 1, 1992

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    Best-in-class maintenance benchmarks in Chilean open-pit mines

    By P. Oyanader

    "In 2001, the Catholic University of Chile undertook a maintenance benchmarking study of six open pit copper mines having mill capacities varying between 18,000 t/d and 156,000 t/d, and collectively r

    Jan 1, 2005

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005