Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Use of Functional Performance Models to Increase Plant Grinding Efficiency

    By O. M. Arafat, J. A. Finch

    "The Functional Performance Equation calculated from a plant grinding survey defines two distinct ball mill circuit efficiencies and how they relate to total production rate through the target grind s

    Jan 1, 2017

  • CIM
    Significant Canadian Developments in Mineral Processing Technology 1961-2011

    By J. E. Nesset

    "I had been requested earlier this year by MetSoc, our sister society of CIM, to contribute a chapter on technical developments in Canadian mineral processing over the past 50 years to their 50th Anni

    Jan 1, 2012

  • CIM
    Development of Emiprical and Numerical Design Techniques in Burst Prone Ground at Goldcorp Inc.?s Red Lake Mine

    By Pravin Kumar

    Goldcorp Inc.?s Red Lake Mine (RLM) is situated in the Red Lake Mining District, a history rich North Western Ontario mining community. Red Lake Mine formerly known as the Dickenson Mine has experienc

    May 1, 2002

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • CIM
    Research and Development for an Ultra-Low Profile LHD

    By Patrick F. R. Murphy

    An ultra-low profile LHD has been developed by EJC Mining Equipment of Burlington, Ontario for narrow-reef mining applications. This paper discusses the challenges encountered during the evolution of

    May 1, 2004

  • CIM
    Equity Silver Mines Scavenger Circuit

    By P. G. Semple

    "In January 1985, Equity Silver Mines Limited began operation of a cyanidation circuit to scavenge precious metals from the flotation tailings. At present, this process is treating 270,000 tonnes of t

    Jan 1, 1987

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • CIM
    Collector Consumption Heads or Tails

    By J. A. Meech, R. J. Tucker

    "Since the establishment of froth flotation as an effective method of mineral beneficiation there has been both academic and industrial interest in the levels of the various reagents required to perfo

    Jan 1, 1984

  • CIM
    802.11 Wireless Site Survey Methodologies in an Underground Mine Environment

    By Mark G. Lafontaine

    Underground 802.11 wireless communications has become widely adopted for automation and communication purposes but maximizing the wireless signal presents many obstacles given the harsh environment as

    May 1, 2013

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    Cut off Grade Optimizer Integrating Contaminant Constraints

    By Sebastián H. Troncoso

    Open pit mine planning is normally based on the selection of an economic envelope that has been generated by the Lerchs & Grossman algorithm, which requires individual economic valuation of each block

    Oct 1, 2009

  • CIM
    Alimak Mining at the David Bell Mine

    By Andrew G. Patton

    The Alimak mining method was introduced at the David Bell mine in 1998 to extract an otherwise uneconomic and inaccessible reserve. The success associated with the extraction of these reserves led to

    Oct 1, 2001

  • CIM
    Process Mineralogy of Silver Ores and Applications in Flowsheet Design and Plant Optimization

    By Joe Zhou

    "Mineralogical characterization and metallurgical extraction of silver is challenging due to its complex mineralogy and chemistry. Over 200 Ag-bearing minerals have been identified and a silver-rich o

    Jan 1, 2010

  • CIM
    Settlement of Tailings Slurries by Creep Compression

    By J. Don Scott

    Analytical predictions of the rate and magnitude of settlement of deposited oil sands tailings slurries generally overestimate how fast pore pressures will dissipate. Field deposits of nonsegregating

    May 1, 2004

  • CIM
    The Use of Mine Sequencing Controlled Through Numerical Modelling and Instrumentation to Destress a Highly Burst Prone Sill Pillar - Draft

    In order to maintain a production rate of 6,000 tonnes per day from underground at the Williams Operating Corporation, two independent mining areas were required which created a long narrow sill pilla

    Apr 1, 2005

  • CIM
    The Importance of Structural Geological Mapping and Slope Monitoring in Open Pit Slope Stability

    By Nick D. Rose

    The importance of structural geology in open pit slope stability is overlooked in many mining operations due to pressures to cut costs and minimize mine personnel. As a result, mine geology staff are

    May 1, 2002

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • CIM
    Concentrate Dewatering Modernization at the INCO Thompson Smelter

    By Mika Muinonen

    "Dewatering of nickel concentrate at the INCO Thompson integrated mine-metallurgical site takes place within the smelter plant. The eight original 60 foot diameter cable torque thickeners of which fou

    Jan 1, 2006

  • CIM
    Magnetic Gold: Losses from a Gold Recovery Circuit

    By Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher

    A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl

    Jan 1, 2014