Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    "Dacum" at the Carol Project

    By G. Taylor

    "The Iron Ore Company Of Canada's Carol Project is located in Labrador City, Newfoundland. Labrador City is some 912 air kilometers northeast of Montreal, and 417 ratl kilometers north of Sept-Iles, Q

    Jan 1, 1982

  • CIM
    Energy and Cost Comparisons of HPGR Based Circuits with the SABC Circuit Installed at the Huckleberry Mine

    By O. Mejia, J. Drozdiak

    "This paper summarizes a comprehensive energy and cost study comparing an existing SAG mill based circuit at Huckleberry Mine with two proposed circuits involving comminution technologies which are as

    Jan 1, 2013

  • CIM
    Successful Recovery of Chromite Fines

    By S. Yalcin, S. Chang, M. Oliazadeh

    "Present day ferrochrome demand is on the rise, as more steel products require this material as an alloying element. It is projected that the stainless steel demands will grow by about 6% per year to

    Jan 1, 2013

  • CIM
    Separation of Metals in Aqueous Solutions by Ion Exchange

    By A. Himsley

    "There is an ever-increasing demand these days for efficient methods of removing metals from solutions especially for selectively recovering a particular metal from a mixture of metals in solution.Up

    Jan 1, 1975

  • CIM
    Economics and Perspectives of Underground Backfill Practices in Canadian Mines

    By E. De Souza

    Two comprehensive surveys, which focus upon backfill practices and the economics of backfilling in underground mines in Canada, have been conducted. The two surveys were designed to assess operational

    May 1, 2003

  • CIM
    Production Simulation Overview and Case Study: Coleman 170 Orebody

    By Scott Hopkins

    Simulation tools are preferred for evaluating complex systems due to its ability to mimic reality and quickly evaluate many different what-if scenarios and find global solutions. A simulation model is

    May 1, 2008

  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    Cyanidation of a High Gold Flotation Concentrate

    By J. A. King, D. A. Knight

    "The Porgera orebody is located in mountainous terrain in Enga Province, Papua New Guinea. An underground mine has been developed which produces up to 2000 t/d of ore grading over 2 ozs Au/t. Some 79%

    Jan 1, 1992

  • CIM
    An Approach to Energy Management at Falconbridge Nickel Mines Limited

    By D. M. Doyle

    "A study of the various components contributing to energy costs and their relationships to generally trended operating data, such as tonnage, operating costs, etc. over progressively shorter time peri

    Jan 1, 1979

  • CIM
    General Discussion - Impurity Penalties in Smelter Contracts

    By G. C. McKerrow

    "Mr. G.C. McKerrow, Assistant Manager of Noranda Mines and formerly Smelter Superintendent attended the meeting to answer questions as to why smelters imposed penalties for too much zinc in a copper c

    Jan 1, 1971

  • CIM
    The Star Lake Mill a Low Cost Success Story

    By Doug Smith, Ross MacFarlane

    "The Star Lake Mill was commissioned by Cameco (formerly Saskatchewan Mining Development Corporation) in 1986 to process a small high grade gold deposit in a remote location of Northern Saskatchewan.

    Jan 1, 1989

  • CIM
    Development of the East West Caribou Selective Lead and Zinc Flowsheet and Subsequent Modifications to the Existing Mill Facilities

    By Godfrey MacDonald

    "The East West Caribou deposit with an underground mine, concentrator and ancillaries is located 30 km west of Bathurst, New Brunswick. The Restigouche deposit, an open pit mine is 30 km west of East

    Jan 1, 1997

  • CIM
    Weak Rock Mass Span Design ? Best Practices

    By A. Ouchi

    This paper presents ground control best practices in weak rock environments including the "Unsupported" Weak Rock Updated Span Design Curve and awareness pertaining to the potentially detrimental effe

    May 1, 2009

  • CIM
    Determination of Physical Properties of Cable Bolts in Cement Grout Pull Tests Using Instrumented King Wires

    By Lewis Martin

    Whereas many researchers and mine engineers have conducted tests using different types of grout, grout ratios, and physical modifications of the cable to determine cable bolt load characteristics, few

    May 1, 2002

  • CIM
    Stabilité Géotechnique Des Ouvrages De Retenue Pour Les Résidus Miniers: Problèmes Persistants Et Méthodes De Contrôle

    By Michel Aubertin

    Les digues de retenue de résidus miniers devraient être conçues de façon à supporter les charges les plus défavorables qui puissent être anticipées. Les nombreux incidents survenus au cours des derniè

    Nov 1, 2002

  • CIM
    The development of process mineralogy at Falconbridge Limited and application to the Raglan Mill

    By J. S. Stickling, P. J. Whittaker, N. O. Lotter

    "Assessment of opportunities to improve mineral processing performance in existing concentrators and in describing undeveloped orebodies is key to improving the business case of a mining company. This

    Jan 1, 2002

  • CIM
    Au L3-edge XANES Analyses for spr-Au/Al2O3 Catalyst

    By S. Nagamatsu

    Alumina supported gold catalyst prepared by spray reaction method (spr) provides gold particle with about 20 nm of diameter. The gold particle size is larger than conventional gold catalysts. However,

    Oct 1, 2003

  • CIM
    Standardization of Data Formats as Basis for Future Efficient Mine Production

    By Christoph Mueller

    Mining operations are characterized by cost pressure and cycling product prices. A high potential for enhancing efficiency is the integration of all single steps of the mining working chain into a pro

    May 1, 2002

  • CIM
    Energy/GHG Management Assessment Using TSM Indicators

    By Lauri Gregg

    Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management

    May 1, 2007

  • CIM
    Dust Control, Brenda Mines Limited, Peachland B.C.

    By J. W. Austin

    "Introduction The Brenda dust collection system was originally designed to handle air at the 5000 ft. elevation with less than 1 grain of dust per cubic feet of air handled. The temperature variation

    Jan 1, 1976