Industrial Minerals 2004 - GypsumBy R. D. Sharpe
Gypsum wallboard manufacturers in the United States shipped 3.18 billion m2 (34.2 billion sq ft) of wall-board products during 2004 versus 2.93 billion m2 (31.5billion sq ft) in 2003. Following a hi
Jan 1, 2005
-
Sealing designWaste areas of a mine should be sealed especially if there is a risk of spontaneous combustion. Leakage through and around such seals can be problematic. Pressure balancing has been one of the favored
Jan 1, 2009
-
Advantages And Limitation Of Integrity Tests For Large Diameter Bored Piles In Bangkok SubsoilBy Narong Thasnanipan
In Bangkok due to the prevailing condition of subsoil (existence of considerably weak stratum at top part) deep-seated large diameter bored piles of over 50 m depth with 0.8 -1.8m in diameter have bee
Jan 1, 2004
-
Future And Potential In-Stope Rock Support Systems In Conventional Narrow Vein Stoping Operations To Reduce Safety Risks And Enhance ProductivityBy I T. Tshabalala
In typical conventional narrow vein stoping operations, the use of temporary support components to offer some support to workers, whilst the permanent and generally more elaborate support system gets
Jan 1, 2008
-
Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - IntroductionBy M. Botz
Anatolia Minerals Development Limited (AMDL) is constructing the Çöpler Gold Project in eastern Turkey and commenced mining in the fourth quarter of 2009 with gold production scheduled to begin in the
Jan 1, 2011
-
Study on Tunneling in Rock Masses with Inclined Layers Using Discontinuous Deformation Analysis (DDA)By J. -H. Wu, S. Nishiyama, Y. Ohnishi
The behaviors and stress distributions of the inclined jointed rock masses with different dip angles obtained from DDA are compared to the results of laboratory tests. By calculating the block stress
Jan 1, 2003
-
Implementingan Efficient Mine Planning SystemBy H. Gurgenli
Mining companies require accurate short-term mining forecasts to meet budget targets and customer needs. Challenging mining conditions along with employee turnover and lack of standard geologic modeli
Jan 1, 2011
-
Blast Design for Vibration Control in Construction BlastingBy Terra Dinamica, Frank Lucca
This paper discusses blast design for vibration control in tight construction blasting. Topics include blast pattern geometry, blast design formulas, loading, explosives & initiation selection, and ut
Jan 1, 2005
-
Hand Force-Dependent Modeling Of The Hand-Arm Under Zh-Axis Vibration - IntroductionBy P. -E. Boileau, P. Marcotte, Y. Aldien, S. Rakheja
A number of biodynamic models of the hand-arm system have evolved on the basis of measured driving-point mechanical impedance (DPMI) responses to facilitate analyses of the coupled hand-tool system [1
Jan 6, 2006
-
Understanding And Solving Roof Control Problems In Stone MinesBy F. S. Kendorski
Several startup or longtime underground stone mines have experienced unanticipated roof control difficulties due to the variable geologic character of the roof strata. Careful mapping of roof conditi
Jan 1, 2002
-
Mine Projects 101: Challenges Of TodayBy M. Javier
Mining is an industry of experimentation throughout human history. Recently, societies are giving a clear message about mining because many projects are being rejected around the world. These refusals
Feb 27, 2013
-
Industrial Minerals 2004 - NitrogenBy D. A. Kramer
Ammonia, the principal source of fixed nitrogen, was produced by 16 companies at 31 plants in the United States during 2003. Fifty-five percent of U.S. ammonia production capacity was centered in Lou
Jan 1, 2005
-
Open Pit Geometry Modeling And Economic Analysis Of Novel At-Face-Slurry OptionsThe evolution of surface mine layout configuration is a function of the schedules and sequence of material excavation within the optimized layouts. The production schedules and sequence of materials m
Jan 1, 2011
-
Twenty-Four Conferences; More Than One-Hundred And Seventy Papers; Understanding Roof Bolt Selection And Design Still Remains PricelessBy Stephen C. Tadolini, Raymond A. Mazzoni
The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten
-
Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058By D. McBride
Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists
Jan 1, 2009
-
Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen
This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr
Jan 1, 2004
-
Electronic Detonators Technology of the FutureBy Aloke Verma, R. Singh, S. Jana, C. Sawmliana, P. Pal Roy
On July 21, 2004, a trial blast using electronic detonators was conducted in India for the first time in an opencast mine at Pundi-E Quarry of TISCO, West Bokaro. Orica-IEL conducted the test using el
Jan 1, 2006
-
Innovative Use Of Piles For Retaining Sides Of Deep Excavations ? SynopsisBy D. V. Karandikar
Contiguous bored piles have been used in the past for retaining the sides of deep excavation. An innovative version of this method was adopted successfully in two prestigeous projects in Bombay in whi
Jan 1, 1996
-
Specifications For Initial Support In Rock TunnelsBy William F. Daly, William H. Hansmire
Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a
Jan 1, 1985
-
Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? SynopsisBy M. Pernot
A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati
Jan 1, 2010