Search Documents

Sort by

  • SME
    Industrial Minerals 2004 - Gypsum

    By R. D. Sharpe

    Gypsum wallboard manufacturers in the United States shipped 3.18 billion m2 (34.2 billion sq ft) of wall-board products during 2004 versus 2.93 billion m2 (31.5billion sq ft) in 2003. Following a hi

    Jan 1, 2005

  • SME
    Sealing design

    Waste areas of a mine should be sealed especially if there is a risk of spontaneous combustion. Leakage through and around such seals can be problematic. Pressure balancing has been one of the favored

    Jan 1, 2009

  • DFI
    Advantages And Limitation Of Integrity Tests For Large Diameter Bored Piles In Bangkok Subsoil

    By Narong Thasnanipan

    In Bangkok due to the prevailing condition of subsoil (existence of considerably weak stratum at top part) deep-seated large diameter bored piles of over 50 m depth with 0.8 -1.8m in diameter have bee

    Jan 1, 2004

  • SAIMM
    Future And Potential In-Stope Rock Support Systems In Conventional Narrow Vein Stoping Operations To Reduce Safety Risks And Enhance Productivity

    By I T. Tshabalala

    In typical conventional narrow vein stoping operations, the use of temporary support components to offer some support to workers, whilst the permanent and generally more elaborate support system gets

    Jan 1, 2008

  • SME
    Managing Copper In Leach Solution At The Çöpler Gold Project: Laboratory Testing And Process Design - Introduction

    By M. Botz

    Anatolia Minerals Development Limited (AMDL) is constructing the Çöpler Gold Project in eastern Turkey and commenced mining in the fourth quarter of 2009 with gold production scheduled to begin in the

    Jan 1, 2011

  • SAIMM
    Study on Tunneling in Rock Masses with Inclined Layers Using Discontinuous Deformation Analysis (DDA)

    By J. -H. Wu, S. Nishiyama, Y. Ohnishi

    The behaviors and stress distributions of the inclined jointed rock masses with different dip angles obtained from DDA are compared to the results of laboratory tests. By calculating the block stress

    Jan 1, 2003

  • SME
    Implementingan Efficient Mine Planning System

    By H. Gurgenli

    Mining companies require accurate short-term mining forecasts to meet budget targets and customer needs. Challenging mining conditions along with employee turnover and lack of standard geologic modeli

    Jan 1, 2011

  • ISEE
    Blast Design for Vibration Control in Construction Blasting

    By Terra Dinamica, Frank Lucca

    This paper discusses blast design for vibration control in tight construction blasting. Topics include blast pattern geometry, blast design formulas, loading, explosives & initiation selection, and ut

    Jan 1, 2005

  • NIOSH
    Hand Force-Dependent Modeling Of The Hand-Arm Under Zh-Axis Vibration - Introduction

    By P. -E. Boileau, P. Marcotte, Y. Aldien, S. Rakheja

    A number of biodynamic models of the hand-arm system have evolved on the basis of measured driving-point mechanical impedance (DPMI) responses to facilitate analyses of the coupled hand-tool system [1

    Jan 6, 2006

  • SME
    Understanding And Solving Roof Control Problems In Stone Mines

    By F. S. Kendorski

    Several startup or longtime underground stone mines have experienced unanticipated roof control difficulties due to the variable geologic character of the roof strata. Careful mapping of roof conditi

    Jan 1, 2002

  • SME
    Mine Projects 101: Challenges Of Today

    By M. Javier

    Mining is an industry of experimentation throughout human history. Recently, societies are giving a clear message about mining because many projects are being rejected around the world. These refusals

    Feb 27, 2013

  • SME
    Industrial Minerals 2004 - Nitrogen

    By D. A. Kramer

    Ammonia, the principal source of fixed nitrogen, was produced by 16 companies at 31 plants in the United States during 2003. Fifty-five percent of U.S. ammonia production capacity was centered in Lou

    Jan 1, 2005

  • SME
    Open Pit Geometry Modeling And Economic Analysis Of Novel At-Face-Slurry Options

    The evolution of surface mine layout configuration is a function of the schedules and sequence of material excavation within the optimized layouts. The production schedules and sequence of materials m

    Jan 1, 2011

  • NIOSH
    Twenty-Four Conferences; More Than One-Hundred And Seventy Papers; Understanding Roof Bolt Selection And Design Still Remains Priceless

    By Stephen C. Tadolini, Raymond A. Mazzoni

    The International Ground Control Conference in Mining has always provided an open forum for the publication, presentation, discussion, and often heated debate on roof bolting systems mostly with atten

  • SME
    Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058

    By D. McBride

    Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists

    Jan 1, 2009

  • CIM
    Fleet management system for underground mines (dd9c7c45-cd77-4292-966a-863f63e39c89)

    By R. Grimard, M. Gamache, L. -P. Bigras, P. Cohen

    This paper describes a real-time fleet management system for an undergroun mine. Dispatching, routing and scheduling are handled simultaneously, taking into account the mine status, operational constr

    Jan 1, 2004

  • ISEE
    Electronic Detonators Technology of the Future

    By Aloke Verma, R. Singh, S. Jana, C. Sawmliana, P. Pal Roy

    On July 21, 2004, a trial blast using electronic detonators was conducted in India for the first time in an opencast mine at Pundi-E Quarry of TISCO, West Bokaro. Orica-IEL conducted the test using el

    Jan 1, 2006

  • DFI
    Innovative Use Of Piles For Retaining Sides Of Deep Excavations ? Synopsis

    By D. V. Karandikar

    Contiguous bored piles have been used in the past for retaining the sides of deep excavation. An innovative version of this method was adopted successfully in two prestigeous projects in Bombay in whi

    Jan 1, 1996

  • SME
    Specifications For Initial Support In Rock Tunnels

    By William F. Daly, William H. Hansmire

    Installation of initial tunnel support is often the most uncertain element of work in the design of, and a contractor bidding on, construction of a rock tunnel. The risks the construction contractor a

    Jan 1, 1985

  • DFI
    Deep Excavation In The Shanghai Soft Clay Under Protection Of A Cast-In-Situ Retaining Wall ? Synopsis

    By M. Pernot

    A 12 m-deep excavation has to be perfomed in the Shanghai soft clay to install an underground electric substation. This article was originally intended to study the behaviour of the wall, the excavati

    Jan 1, 2010