Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ventilation And Climatic Simulation Of Drift/Stope In Metal MinesBy R. Gunda
Due to the rapidly increasing production rates and deepening of mine working areas, there is a drastic rise in the number of thermal issues to be addressed for maintaining a safe mine environment. As
Jan 1, 2011
-
Vibration Analysis Of Large Tumbling MillsBy B. K. Mishra
In order to maintain higher grinding efficiency in tumbling mills the mill interior and dynamics must be known. For this purpose, several different types of non-intrusive methods have been proposed an
Jan 1, 2011
-
Lithologic Controls On Aggregate Quality In A Mountain-Front Alluvial System--An Example From The Colorado Front RangeBy D. A. Lindsey
Gravel lithology affects the quality of aggregate because different rock types in gravel have different physical and chemical properties. The lithologic composition of alluvial gravel reflects the com
Jan 1, 2002
-
Use of pumping packer tests and geometry of the joints to analyse flow and transport of contaminants in basaltic rockBy J. M. Cardoso, E. F. Quadros, A. Chiarini, F. Fernandes, G. Vilela, J. Ireno, L. C. Agostini
Based on the geological-geometric characterization of the basaltic rock at the site of a factory for chemical products situated in the Southern region of Brasil, and on results of a significant number
Jan 1, 2003
-
Techniques to Assess the Influence of Blast Design Parameters on Airblast and Blast VibrationBy Robert Hivick, Frank Sames
The control of environmental effects, especially blast vibration and airblast, has become a dominating planning criterion for most surface blasting operations. Compliance with existing regulations is
Jan 1, 1999
-
Red Dog Lead Regrind Circuit OptimizationBy Brigitte Lacouture, Yeen Shien Hwang, David Lin
"A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote
Jan 1, 2005
-
Recycling of Process Water in Sulfides Processing and Flotation SelectivityRecycling of Process Water in Sulfides Processing and Flotation Selectivity
Sep 13, 2010
-
Characterization Of Copper Flotation Products Utilzing The JKMRC/FEI Mineral Liberation Analyzer (MLA)By D. Brosnahan, J. Gathje
Newmont Metallurgical Services (NMS) recently acquired a Scanning Electron Microscope (SEM) with a JKMRC/FEI Mineral Liberation Analyzer (MLA). With the MLA software package, raw particle image and X
Jan 1, 2007
-
100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution
Jan 1, 1994
-
Installation of a Ventilation Shaft at San Juan CoalBy T. Arthur Palm, Stephen L. Bessinger
San Juan Coal Co. (SJCC) operates an underground coal mine near Farmington, NM. Continuous miners and a longwall produce 6.3 to 7.2 Mt/a (7 million to 8 million stpy). SJCC is owned and operated by
Jan 1, 2007
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Is that Normal? Fundamental Observations for Best Practive Blast Vibration AnaysisBy W. J. Birch, A. Wetherelt
The scaled-distance model for blast vibration analysis is the standard method employed throughout the surface mining and quarrying industries to model Peak Particle Velocity (PPV) data. Although empir
Jan 1, 2005
-
Challenges And Solutions To Designing Deep Excavations For Urban Transit StationsBy Ching-Liu Wu, John Hawley, Andrew H. Liu, James Chai
The Hatch Mott MacDonald/Bechtel Joint Venture team is designer and construction manager for the 5.25-mile Tunnel Segment of the overall 16-mile Silicon ValleyRapid Transit Project, which extends the
Jan 1, 2007
-
Shaft Plumbing at Mount IsaIn the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can
Jan 1, 1940
-
Minor Element Control By Vacuum Calcination And Recycling Of Copper Smelter DustBy Jin Qiu
Experiments were performed to determine the extent of minor element elimination that occurred when mixtures of copper smelter dust and copper concentrate, were calcined under vacuum. Almost complete
Jan 1, 2005
-
Novel Dewatering Aids for Mineral Concentrates and CoalBy M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu
"According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus
Jan 1, 2005
-
Design Of Drilled Pier In Expansive SoilsBy G. T. Hong
A numerical model for use in design is developed to predict the stresses and axial and bending displacements in a drilled pier in expansive soils. The prediction is based on the horizontal swelling p
Jan 1, 2007
-
OFR-72-84 Application Of A Portable Device For Measuring Dragline Roller Circle Track Deviations And Roller LoadingsBy R. Pallini
The Franklin Research Center (FRO, a Division of The Franklin Institute was contracted by the U.S. Department of Energy to investigate the application of elastomeric materials for the purpose of smoot
Jan 1, 1982
-
Analysis Of Metal And Nonmetal Mine Fire Incidents In The United States From 1950 To 1984 ? The ProblemMine fires pose a serious hazard to the health and safety of mine workers. They occur regularly and their effects can be devastating. Objective Provide mine safety personnel, MSHA, and equipmen
Jan 1, 1988
-
High Stress Pile Testing At Soldier FieldBy Michael H. Wysockey
The load test program for the pile foundation at Soldier Field included static and dynamic load tests at four locations around the site. The dynamic tests were run with no knowledge of the static resu
Jan 1, 2002