Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Get More from Existing Mining Equipment Through ReliabilityImproved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope
May 1, 2010
-
Get More Reliable Production from Existing Mobile and Fixed Assets ?Technology Advancements to Optimize Asset PerformanceBy Keith Donovan
Why are we here? Improve equipment performance & health ? Eliminate undesirable downtime and expensive secondary damage ? Maximize equipment life, optimize running costs (reduce costs) ? Improve s
May 1, 2009
-
Get the Benefits from Control SystemsBy Michel Ruel
Most plants do not track how their systems perform. Optimization is the easiest way to benefit from your control systems. We suggest an approach in four phases. The first phase is to assess all equipm
Jan 1, 2019
-
GET: A Function for Preferential Site Selection of Additional Borehole DrillingBy M. Sharafodin, A. A. Hassanipak
Abstract - The essential aims of additional borehole drilling are to improve the reliability of grade and tonnage estimates in each reserve class and to increase ore tonnages. The "GET" function prese
Jan 1, 2004
-
Getchell Mine Pressure Oxidation Circuit Four Years After StartupBy Dale Matthews
The Getchell Mine, near Winnemucca, NR, was discovered in the 1930s and was initially mined to recover gold from oxide ores. During the 1940s and 1950s, gold was recovered from the highly refractory a
Jan 1, 1994
-
Getting More From the Ore – 1995 Daniel C. Jackling LectureBy J. Burgess Winter
It is an honor to present the lecture in honor of Daniel C. Jackling, the developer of the technology of copper mining that we continue to use 100 years later. He made a dramatic breakthrough in the e
Jan 1, 1995
-
Getting Paid In Hard Times - I. Formation Of The ContractBy Dennis J. Riley
A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter
Jan 1, 1991
-
Getting The Balance Right ? Some Practical Design Considerations For Solvent Extraction CircuitsBy G. Laing
On scheduled commissioning and effective operation of a solvent extraction circuit relies on getting the design of both the core contact equipment and the peripheral plant right. Experience has shown
Jan 1, 2002
-
Getting The Engineer?s Estimate RightBy Tom Martin
Mega projects present unique challenges with regard to estimating costs. With such projects, which may span decades, these challenges often begin as soon as a project is conceived. The importance of h
-
Getting the Right Contract PackageBy W. W. Edgerton
Construction projects may be delivered under one contract package or multiple packages divided by discipline, geographic location, or other characteristics. Dividing the construction into contract bid
Jan 1, 2008
-
Getting to the FeasibilityBy Ray Mason
Marathon PGM Corporation?s PGM-Cu Project in Northwestern Ontario (Figure 1.0) serves as a case study to describe the process involved in advancing a deposit from grass roots exploration to the comple
May 1, 2010
-
Ghana: Gold, Diamonds And MoreBy K. Grubaugh
Ghana’s physiographic and geologic features are the basis for its long mining history. The Gold Coast colony has been a significant producer of gold. The gold of the Akan forest (Ghana) was a terminus
Jan 1, 2001
-
GHG Emissions in the Mining, Metallurgy and Petroleum SectorsBy Pierre Boileau
Outline ? Who are We? ? Canada?s GHG Emissions 1990 - 2000 ? Emissions from the Petroleum Sector ? Emissions from Petroleum Exports ? Emissions from Manufacturing Industries ? Emissions from Min
Nov 1, 2002
-
GIBE II Tunnel Project?Ethiopia: 40 Bars Of Mud Acting On The TBM ?Special Designs And Measures Implemented To Face One Of The Most Difficult Events In The History Of Tunneling?By Antonio De Biase
In October 2006, a 7m Double Shield TBM, boring through very poor volcanic formations, was pushed back by fluid mud, which presence had not been detected during previous field investigations, due to t
-
GilsoniteBy Harry D. Lewis
Gilsonite is a lustrous black material that can be easily crushed into a chocolate-colored powder. It is a solid but relatively soft, lightweight hydrocarbon that visually resembles the volcanic glass
Jan 1, 1994
-
Gippsland Basin Resources for Long Term Economic ProsperityIt has long been recognised that Australia can benefit substantially in an economic sense from its rich resource base. The significant resources of the Gippsland Basin are a good example of the weal
Jan 1, 1992
-
Gippsland Basin South Platform: Unprospective or Underexplored?I The South Platform of the Gippsland Basin is an extensive area of shallow basement covered by a relatively-thin Late Mesozoic-Cainozoic section. Although the sporadic exploration to-date has not r
Jan 1, 1992
-
GIS and Bauxite Mining in JamaicaBy Jim Baumann
Deposited millions of years ago in irregular paleokarstic channels, Jamaica’s extensive bauxite deposits provide good quality ore for alumina production and subsequent aluminum smelting. Bauxite minin
Jan 1, 2002
-
GIS Applications in Underground MiningBy Anthony D. Hammond
The use of geographic information systems (GIS) as a tool to analyze and display data is gathering momentum in the mining industry. Of particular interest is the capability of GIS to link spatial fea
Jan 1, 2002
-
GIS as a Mine Rehabilitation Tool - Examples from Wangaloa Coal MineBy D Craw, P Whigham, C Rufaut
Geographic Information Systems (GIS) are computerised management systems for spatial data, offering improved data management, extensive data manipulation techniques and greater understanding of data.
Jan 1, 2004