Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Milling and Treatment at the Waihi Mine, N.Z.IN presenting a'description of milling and treatment methods at the Waihi mine, it is advisable to first traverse a good deal of the past history of the mine, and show the various steps which hav
Jan 1, 1912
-
PNEUFLOT® - Modern Flotation Technology In The 21st CenturyBy Lutz Markworth, Wolfram Jaspers, Johannes Kottmann
PNEUFLOT® technology has been applied for the past 20 years in coal, ore and other minerals processing plants. During the last two years this technology has achieved a breakthrough with some 42 units
Jan 1, 2007
-
Batu Hijau: From Discovery to ProductionBy Thomas J. DeMull
Development of the Batu Hijau copper project was completed in the fourth quarter of 1999 with the formal handover and start-up of ore processing facilities. The project began in August 1996 when the
Jan 1, 2002
-
Improved Pile Economics: High Design Stresses And Remote Pile TestingBy Jim Frazier
Tradition has often dictated low design load stresses on piles. Such traditions often developed prior to modern static or dynamic pile testing methods and perhaps result from a few limiting situations
Jan 1, 2002
-
Electric Rope Shovel MonitoringBy J. Hansen
This paper has been written for presentation during the Open Pit Mining Session at the SME Annual Meeting and Exhibit, Denver, Colorado, February 26 to 28, 2001. The paper addresses the application o
Jan 1, 2001
-
Tunnelling on the South East Transit ProjectBy T. W. Peglas, J. Doherty, R. A. Day
The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,
Jan 1, 2001
-
Soil Nail Stabilisation For A 14.5m Deep Excavation At Uncontrolled Fill GroundBy Shaw-Shong Liew
This paper presents the processes of investigation, analysis, design, construction and monitoring of soil nail stabilisation work to facilitate a 14.5 m deep excavation at an uncontrolled fill ground.
Jan 1, 2006
-
Start-up of Misima Mines Milling OperationThe physical setting and background to mining operations on Misima Island and the overall plant lay-out are outlined. Developments and changes made to each section of the plant are described as th
Jan 1, 1991
-
Caterpillar With Tunnel Boom Boosts Productivity On Swiss ProjectA dedicated tunnel construction version of the Caterpillar 328D LCR compact radius excavator is proving highly productive on the A9 Autoroute construction project near Visp, in Switzerland. It is the
Jan 1, 2009
-
LIMPEZA DE GÁS EFICIENTE ENERGÉTICA - Design ótimo do sistema de ExaustãoBy Herrmann Flor
In steelmaking process, where up to 70% of variable cost of finished product is already incurred, energy and refractory costs account for 45-50% of the cost of production of crude steel and contribute
Oct 30, 2017
-
Structural Controls on the Development of a Mineralised Fault ù Fracture Network, NW Otago, New ZealandVein swarms in metamorphic terranes such as the Otago Schist Belt, New Zealand provide evidence of past hydrothermal flow systems leading to fault initiation and reactivation. A major episode of hydro
Jan 1, 2002
-
Arsenic Sulfide Oxidation At Acid pH Values (2002 SME Annual Meeting Feb. 25 - 27, Phoenix, Arizona)By R. N. Tempel, M. Lengke
Arsenic sulfide [orpiment, realgar, amorphous AsS and As2S3] oxidation rates were measured in mixed flow reactors at pH~2 and temperature of 25-30oC. The measured oxidation rates for arsenic sulfide s
Jan 1, 2002
-
Crinum Mine 15 Longwalls in Weak Roof What Did We Learn about Supporting the Ground?By Dan Payne
The Crinum mine has recently completed workings in the southern area of the mine. Over the 10 years of longwall production 40 million tonnes have been extracted and the mine has experienced over 40 lo
Jan 1, 2008
-
RI 4917 Petroleum-Engineering Study Of Healdton Oil Field, Carter County, Okla.By C. H. Riggs
This petroleum-engineering study of the Healdton oil field in Carter County, Okla., describes the geology and production history of that field and estimates the oil reserves that could be produced by
Jan 1, 1953
-
Pile Load Test Results Using The New Statnamic MethodBy Matthew Janes
Quality control procedures are increasingly important with today's higher capacity foundations and complex loading conditions. The need for a mobile, repeatable, nondestructive and economical loa
Jan 1, 1990
-
Ventilation System Operating Cost Comparison Between A Conventional And An Automated Underground Metal MineBy C. K. Kocsis, S. Hardcastle
Mine ventilation, requires electricity to operate the fans and fossil fuel for heating. Typically, this accounts for approximately 40% of the overall underground energy consumption. This is considerab
Jan 1, 2002
-
RI 6061 Resources For Making Expanded Aggregate In Western Washington And Oregon ? SummaryBy Henry M. Harris
Low-carbon shales from 65 deposits and 11 sources of coal-mine waste in western Oregon and Washington were tested in a rotary kiln for their suitability as raw material for expanded aggregate. Shales
Jan 1, 1962
-
A Computerised Cataloguing System for Geological SpecimensA computerised cataloguing system for geological specimens is described. The catalogue is designed for use with a compactus-type storage system. The information stored in the catalogue for each specim
Jan 1, 1974
-
RI 6234 Statistical Analysis Of Diamond-Drill Sample Data From The Cebolla Creek Titaniferous Iron Deposit, Gunnison County, Colo.By R. D. Berkenkotter
Titanium and iron assays obtained from cores of three diamond-drill holes from the Cebolla Creek titaniferous iron deposit were evaluated by statistical techniques to obtain information concerning the
Jan 1, 1963
-
Selective Removal of Arsenic from Acid Mine Drainage Containing Ferrous Ion Using Sulfide Precipitation MethodSelective Removal of Arsenic from Acid Mine Drainage Containing Ferrous Ion Using Sulfide Precipitation Method
Sep 13, 2010