Search Documents

  • AUSIMM
    Various Interpretations of Coal Petrographic Nomenclature and their Effects on Maceral Analyses

    The commonly used Stopes-Heerlen coal petrographic classification and nomenclature has over the years been subject to variable interpretations. This paper discusses the problem with specific reference

    Jan 1, 1970

  • SME
    The Lithium Industry - Challenges For The Future - Introduction

    By I. A. Kunasz

    This paper is not intended to review and re-state general information on lithium, but rather to analyze the paradigm that has caused such a rapid rise in lithium production and the development of new

    Jan 1, 2011

  • DFI
    Piling Practice in Sedimentary Granular Soils of Santa Cruz, Bolivia

    By Mario Terceros H, Bengt H. Fellenius

    "ABSTRACTThe city of Santa Cruz, Bolivia, is historically dominated by houses and three to five storey buildings.The geology in and around the city is such that even very light buildings need to be su

    Jan 1, 2014

  • AUSIMM
    Ore Characterisation and Davis Tube Testing in Upgrading Magnetite Iron Ore for DRI Feed

    By Misra V. N

    Davis tube tests were conducted on a Koolanooka magnetite iron ore sample, supplied by Kingstream Steel Ltd, to determine the optimum grind size, maximum iron recovery and the cleanness of the produ

    Jan 1, 1999

  • SME
    Coal Liquefaction: Present Status, Future Potential

    By Paul Wellman

    The energy problem of the U. S; was emphasized by the oil embargo of late 1973 and early 1974 and it seemed for a time that the Federal Government, under pressure from the general public, might take s

    Jan 1, 1977

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007

  • SAIMM
    Developments Of Mechanized Technologies For Low Seam Height Mining In Platinum

    By P. Bracher

    Most efforts to mechanize low seam (narrow reef) mining of platinum ore are presently based on board-and-pillar methods with1.6?1.8 m in reef excavation. This paper attempts to substantiate the benefi

    Jan 1, 2003

  • DFI
    Oakland Airport Roadway Project - Synopsis

    By David S. Yang

    The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc

    Jan 1, 2001

  • SME
    Regulatory Changes Improve Alaska’s Mining Climate

    By Steven C. Borell

    For more than a decade, changes have occurred each year that have improved the regulatory and business climate for mining in Alaska. These changes have taken place during Republican and Democratic go

    Jan 1, 2004

  • AUSIMM
    Minimization of Contamination of Mined Ore by Cemented Hydraulic Fill

    A review is made of the limited published experience of the effects of cemented fill in flotation.A general approach is adopted in listing and discussing possible sources of, and reasons for, ore cont

    Jan 1, 1974

  • TMS
    Plant-Wide Process Control For The Collahuasi Project

    By Alex Del Castillo

    The mineral processing industry has followed the development of database control systems, and various systems have been installed in existing and new plants. The goal is to improve product quality, ra

    Jan 1, 1999

  • AIME
    Standing And Special Committees (ad0742f1-78a4-49b1-80c0-2579c7d2f4e3)

    [Executive J. V. W. REYNDERS, Chairman WILLIAM H. BASSETT E. DEGOLYER I-I. C. BELLINGER RICHARD PETERS, JR. Finance GEORGE OTIS SMITH, Chairman H. A. GUESS F. JULIUS FOHS Admissions

    Jan 1, 1928

  • SME-ICGCM
    Monitoring Coal Mine Seismicity with an Automated Wireless Digital Strong-Motion Network

    By Peter Swanson

    A seismic monitoring network has been installed in western Colorado (USA) in the vicinity of three underground coal mines to (i) distinguish and characterize seismic activity as either mining related

    Jan 1, 2008

  • AUSIMM
    Pumping Machinery for Mines, with Special Reference to the Plant at the Waihi Mine, N.Z.

    THE choice of a pumping plant for the drainage of a mine is a matter of such importance that it is obvious that in a short paper it is impossible to go fully into the reasons governing the adoption of

    Jan 1, 1912

  • NIOSH
    RI 5089 Design Of Underground Mine Openings Oil-Shale Mine, Rifle, Colo. ? Summary

    By Robert H. Merrill

    This report contains a summary of the various studies made to determine the structural design of the production mine area of the Oil-Shale mine, Rifle, Colo. Prior to this investigation, it had been d

    Jan 1, 1954

  • SME
    Ergonomic Interventions At Badger Mining Corporation (30a13109-bb6a-4698-a288-c4dfde51a853)

    By J. Torma-Krajewski, M. Lehman

    In 2005, NIOSH and Badger Mining Corporation entered a partnership to implement ergonomic interventions, including a systematic process, to address exposures to risk factors that may result in musculo

    Jan 1, 2007

  • AUSIMM
    Late Metamorphic Structural Zones in the Otago Schist: Prospective Hosts for Gold Mineralisation

    By M Begbie, R J. Norris, D J. MacKenzie

    The Otago Schist is crossed by numerous deformation zones that formed in the latter stages of metamorphism and uplift of the metamorphic belt. These deformation zones are long (tens of km) linear feat

    Jan 1, 2005

  • AUSIMM
    Determination of Relative Economic Values of Mill Returns

    IN concentrating mills, where several millerals are recovered for realisation in more than one product, various systems are used to express the relative economic value of the work done, and, in the ho

    Jan 1, 1931

  • SAIMM
    Design Of A Modern Large Capacity FeNi Smelting Plant

    By J. Kempken, R. Degel, J. Kunze, R. König

    The FeNi technology is currently dominated by high-power submerged arc furnaces, often designed as smelter as "two-inline-solution". To achieve the intended high efficiency, state-of-the-art design in

    Jan 1, 2007

  • NIOSH
    RI 9071 - Capability Evaluation of the Radial-Axial Splitter

    By S. J. Anderson

    To deftne the capabilities of a nonexplosive excavation concept, the Bureau of Mines conducted reduced-scale laboratory tests of a mechanical excavation tool called a rock splitter. The splitter inve

    Jan 1, 1987