Search Documents

  • SME
    Transfer of German environmental expertise for mine site rehabilitation challenges worldwide - A case study: Vietnam

    By R. Barthel, O. Nitzsche, J. Pateiro Fernández, T. Cramer

    The Hong Gai coal field in northeast Vietnam has been the main coal mining area of Vietnam for more than 150 years. Anthracite coal is produced from several open pit and underground mines situated clo

    Jan 1, 2011

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w

    Jan 1, 2008

  • DFI
    St Joseph Hospital Of Bellingham, Washington Addition Supported On Helical Pulldown Micropiles

    By J. L. Goen

    The Saint Joseph Hospital of Bellingham is located on a site underlain by glacial outwash. The construction of a five-story tower addition above an existing two-story wing was supported by five large

    Jan 1, 2004

  • DFI
    On The Effects Of Sand Grading On Driven Pile Performance

    Precast prestressed concrete piles designed to be end-bearing in a sand stratum at Drax Power Station met with extremely variable resistance during driving. Some piles came to virtual refusal almost i

    Jan 1, 1989

  • SME
    Boart Longyear Coring Bits Pass Field Tests

    Using mines in Canada, Boart Longyear, a leading provider of drilling services and products, has put its Stage 3 Coring Bit to the test and each time the bit has passed the test with great success. A

    Jan 1, 2009

  • CIM
    The use of Personal Computers at Kidd Creek for Process Data Monitoring and Analysis

    By Gordan Marrs, O. Matwijenko

    "The Kidd Creek metallurgical site has been highly integrated to maximize revenues from its base metals mines. The site's operations include a Concentrator processing 4.3 million tonnes per year of co

    Jan 1, 1989

  • SME
    Timber Supported System – Introduction

    By George L. Wilhelm

    Timber support of mine openings continues to be an effective system for ground support, due to its avail¬ability, flexibility, and ease of installation. Timber support of mine openings as a primary m

    Jan 1, 1982

  • DFI
    An Investigation of Grouted Pile Capacity Using Instrumented Pile Load Tests

    By Hayel M. El-Naggar, Sherif A. Akl

    Although grouted piles have been used for several decades since the idea was proposed in the 1970s, their design is mostly based on experience and unpublished proprietary methods. There is little rese

    Jan 1, 2018

  • SAIMM
    Translocation of an Endangered Succulent Plant Species From Sandstone Outcrops Earmarked for Coal Mining

    By E. Harris

    Frithia humilis is an endangered succulent plant species. Its distribution range overlaps with the coal fields of Mpumalanga and it is therefore threatened by opencast mining activities in particular.

    Jan 1, 2014

  • SME
    A Rock Mass Classification Scheme For The Planning Of Caving Mine Drift Supports

    By Z. T. Bieniawski, E. H. Skinner, R. A. Cummings, F. S. Kendorski

    INTRODUCTION Caving Mine Drift Support Design The support of production drifts remains a high-cost item facing the developer or operator of an underground caving mine. Support costs are incurre

    Jan 1, 1983

  • SME
    Dimensioning and Construction of a Sealing Layer Made of Green Liquor Dregs Amended Till—Remediation of Sulfidic Mine Waste - Mining, Metallurgy & Exploration (2023)

    By J. Mácsik, J. Lindblom, C. Maurice, Susanne Nigéus

    Using non-hazardous industrial residues in mine waste remediation is beneficial not only for the mining industry where substantial amounts of the waste generated have potential to produce acid rock dr

    Dec 7, 2023

  • ISEE
    Wave Interference Attenuation Relationships and Prediction

    By Kimberlee Falkenstein, Volha Kibitkina, Jessica Steeves

    A series of experiments were conducted to obtain site specific constants for the vibration produced by a single charge and by more charges detonating in sequence, using short delay intervals. All char

    Jan 1, 2013

  • NIOSH
    OFR-129-85 Refinement And Evaluation Of Basic Longwall Dust Control Techniques

    By J. A. Kost

    The contract objective was to evaluate the effectiveness of available dust-control technology for double-drum shearers. Eight underground surveys were conducted to evaluate drum design, drum spray noz

    Jan 1, 1985

  • AIME
    List of Members ? corrected to November 15, 1905

    By AIME AIME

    American Institute of Mining Engineers. (Organized in 1871, and Incorporated in 1905.) OFFICERS. For the year ending February, 1906. Directors JAMES GAYLEY (President), R. W. RAYMOND (Secretary),

    Jan 1, 1906

  • SME
    The Use Of Instrumented Split-Set Rock Bolts To Monitor Strain In The Walls Of A Deep Underground Mine Stope

    By F. Maciosek, D. Denton, J. Johnson

    Researchers from the Spokane Research Laboratory of the National Institute for Occupational Safety and Health and personnel from Coeur Silver Valley, Wallace, ID, conducted tests using rock strain st

    Jan 1, 2004

  • DFI
  • SAIMM
    SMR Geomechanics classification: Application, experience and validation

    By R. Romano, E. Montalar, J. B. Serón

    The SMR geomechanics classification system (adaptation of RMR for slopes) is reviewed with data from 87 actual slopes in Valencia. In a research project, SMR has been applied by a GIS system, as a met

    Jan 1, 2003

  • DFI
    Bearing Capacity Of Long Piles Driven Into Soft Soil ? Synopsis

    By F. Z. Suo

    Baoahan Iron and Steel Complex is situated at lower beaches of the Yangtze River. The subsoils 50~70 M below the surface is a deposite of Yangtze River delta, consisting mainly of weak silty clay and

    Jan 1, 2010

  • SME
    The Challenge Of Building Tunnel Boring Machines For The Eurotunnel Protect

    By David L. Shearer

    INTRODUCTON James Howden first secured an order for two Service Tunnel Boring machines in November 1986. These Tunnel Boring machines were 5.7 and 5.4 metres in diameter and the full length includi

    Jan 1, 1989

  • SAIMM
    Modeling rock mass bulking around underground excavations

    By J. Gómez-Hernández, P. K. Kaiser

    Abstract The process of stress-induced fracturing around underground excavations in brittle rock is associated with dilation or volume increase of the failed, fractured rock. Different attempts to

    Jan 1, 2003