Search Documents

  • NIOSH
    OFR-82-81 Proceedings Of The Fifth WVU Conference On Coal Mine Electrotechnology - July 30-31, August 1,1980

    A compilation of papers presented at the Fifth WVU Conference on Coal Mine Electrotechnology in Morgantown, West Virginia, on July 30, 31, and August 1, 1980. Papers cover areas of electromagnetics/po

    Jan 1, 1980

  • SME-ICGCM
    Managing A New Technology - An Update Of The UK Rockbolting Story

    By L. R. Stace

    Arguably, one of the most significant technological breakthroughs that had been experienced during the period when British Coal was the major coalmine operating company in the UK, the use of rockbolts

    Jan 1, 1996

  • AUSIMM
    The Hunt for Hydrous Bedded Iron Deposits - An Investigation into Flinders MinesÆ Blacksmith Tenement

    By M F. Jennings, N J. Corlis, B J. Thomas, L N. Tylkowski, A E. Petts, G D. McDonald

    Flinders Mines is an iron ore explorer and developer with a tenement package located in the Hamersley Ranges region of Western Australia, approximately 70 km north of Tom Price. Exploration over the p

    Aug 12, 2013

  • AUSIMM
    The Fall and Rise of the Feasibility Study

    The theme of this paper is the development of-the project feasibility study which includes discussion of the work which is carried out in preparing the project feasibility study, the necessary eval

    Jan 1, 1990

  • NIOSH
    RI 3110 A Study of Falls of Roof and Coal in Mines of Harrison County, West Virginia

    By J. W. Paul, J. N. Geyer

    "GENERAL STATEMENTThe purpose of this report, which is the first of a series of three covering mines in the Fairmont district of West Virginia, is to give the result of a' study conducted in seal mine

    Aug 1, 1931

  • SME
    Canadian Experience in Open Pit Mining

    By R. K. Singhal

    Canada is a world class producer and exporter of minerals and mineral products. Today's highly mechanized Canadian open pits use state-of-the-art equipment and support technology. They are taking

    Jan 1, 1995

  • AUSIMM
    Developments in Diamond Drilling Deflection Equipment and Techniques at Broken Hill South Ltd.

    By Jones S. C

    A specific arc can be cut in hard rock formations using a specially designed multistep piloI bit, variable sized drift joint and long heavy control rod as a stabilizer rather than the Vaughan Thompson

    Jan 1, 1966

  • AUSIMM
    Cuprous Hydrometallurgy Part VII. Separation and Purification of Copper(I) Chloride from a Chlorination Roast of Kambalda Nickel Matte using Solutions of Aqueous Acetonitrile

    By Parker A. J, Muir D. M

    Solutions of acetonitrile in water dissolve water soluble copper(I) chloride. Removal of volatile acetonitrile from the resulting solutions, by distillation with low grade steam, precipitates pure cop

    Jan 1, 1980

  • AUSIMM
    Offences Under the Crown Minerals Act 1991

    The Resource Management Act 1991 (RMA) and the Crown Minerals Act 1991 (CMA) both came into force on 1 October 1991. The purpose behind RMA was to integrate the existing laws dealing with town and co

    Jan 1, 1994

  • SAIMM
    1.1 Kenyon

    Standards And Laboratory Monitoring In Gold Assay Key Components Of Best Practice

    Jan 1, 2005

  • AUSIMM
    The Geotechnical Input into the Mining Process at George Fisher South Mine

    Geotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an

    Nov 25, 2010

  • IIMP
    Visión integral de las tecnologías para la optimización de procesos aplicadas en la concentradora cuajone - spcc y análisis de los factores claves que influyen en el éxito de su implementación

    By Nelver Benavides

    "Actualmente en la industria minera, las técnicas de control avanzado, la integración de procesos y tecnologías ya no son consideradas como conceptos exóticos y de dudoso impacto productivo, sino solo

    Sep 12, 2011

  • SME
    Waterproofing of a Subsea Tunnel with a Unique Sprayable Membrane— The Nordöy Road Tunnel, Faroe Islands

    By Sigurd L. Lamhauge, Karl Gunnar Holter, Svein E. Kristiansen

    An innovative sprayable waterproofing membrane in combination with the traditional Nordic method of waterproofing with polyethylene foam sheets was used for the waterproofing of the tunnel. The spraya

    Jan 1, 2007

  • AUSIMM
    Environmental Considerations in Project Planning, Development and Management (Bull, Proc. Australas, Ins!. Min, Melall,. Vol. 292, No. 5, July 1987)

    By Hannan J. C

    In New South Wales, development applications for major coal mining proposals are determined by the Minister for Planning and Environment and applications for mining leases and other mineral titles are

    Jan 1, 1987

  • AUSIMM
    Removal of Iron Oxides from Bauxitic Ores

    A process was developed, on a laboratory scale, for the removal of iron oxides from Weipa pisolitic bauxite. The technique involves the chemical reduction ofthe iron oxides by carbon, followed by sele

    Jan 1, 1971

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • AUSIMM
    The Colorimetric Determination of Molybdenum in Soils, Sediments, and Rocks by Zinc Dithiol

    Samples weighing O· 2 g are digested with 2 ml of 72 per cent perchloric acid for 2 hr at 180°C, and then diluted to 10 ml. with water. After settling, an aliquot of clear solution is reduce

    Jan 1, 1970

  • SAIMM
    The Evolution Of Strategic Long-Term Planning At Anglo Platinum

    By D. C. Andersen, G. L. Smith, J. Pearson-Taylor

    Following a restructuring of Anglo Platinum Limited in 2004 the strategic long-term planning function has been centralized. This paper describes the revised strategic long-term planning process coveri

    Jan 1, 2006

  • SME
    Brightwater?s Ballinger Way Portal Presents Deep Shaft Ground Freezing Challenges

    By James D. Nickerson

    Thee Brightwater water treatment facilities, currently scheduled to be completed in 2010 and begin operating in 2011, will serve the northern part of King County, WA. The facility includes a new trea

    Jan 1, 2009

  • SME
    Heavy- Mineral Deposits Of The Fox Hills Formation Located Near Limon, Colorado

    By F. L. Pirkle

    A heavy-mineral deposit about 1.6 kilometers (I mile) in length and averaging about three meters (10 feet) in thickness is exposed approximately130 kilometers (80 miles) east of Denver, along Intersta

    Jan 1, 2011