Search Documents

  • SME
    Analysis Of Airborne And Waterborne Particles Around A Taconite Ore Processing Facility

    By Charles W. Axten

    Since the mid-1970s, samples of airborne and waterborne fibrous particulates have been collected in the area of the Northshore Taconite Ore Processing Facility by the Minnesota Department of Health (M

    Jan 1, 2007

  • CIM
    Beneficiation of Marine Sands from Les Iles-De-La-Madeleine

    By Alain Dorval

    "''Purification of marine sands from Les Iles-de-la-Madeleine''This paper presents the results of the work that has been done at CRM pilot plant for «Les Silices du Golfe Inc.». Essentially the purpos

    Jan 1, 1994

  • SME
    Technology News – Excavators Designed for Use in Confined Spaces

    Komatsu America International has introduced two new hydraulic excavators. They can work in congested and confined areas. The tight tail swing radius of the PC128US-2 and PC22-8USLC-2 enables the exc

    Jan 1, 2000

  • DFI
    Comparison of Static and Dynamic Load Tests on Bored Piles in Glacial Soil

    By Matthias Baeßler, Markus Herten, Ernst Niederleithinger, Steven Georgi

    "Abstract: BAW and BAM have performed a large scale comparison and calibration test on static and dynamic load capacity evaluation of bored piles in glacial sandy soil. The test was performed using ei

    Jan 1, 2014

  • DFI
    Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37

    By Gordon Chen

    The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the

    Jan 1, 2009

  • CIM
    Model of a Decision

    A mathematical model of a decision is represented by the table in Figure 4. The numbers in the matrix are a measure of the effectiveness of each alternate for an objective. In this case, it is the per

    Jan 1, 1964

  • SME
    Long-Term Stability Of Overburden Above Room And Pillar Mines

    By Gennaro Gerald Marino

    Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for

    Jan 1, 1986

  • AUSIMM
    Mesothermal Gold Deposits of Westland, New Zealand and Southern Alaska: Products of Similar Tectonic Processes?

    By D Skinner, P Haeussler, D Bradley, A Christie

    Mesothermal gold deposits of southernAlaska and Westland, New Zealand have both formed at the seaward edge of major collisional zones in the Pacific basin. In Alaska, production of large fluid volumes

    Jan 1, 1995

  • CIM
    Diplomat Mine

    By J. Keith Haddock

    "Introduction The Luscar company, Forestburg Collieries Ltd., operates the Diplomat Mine located 14 km south of Forestburg, Alberta. Production is now at a declining rate from the 1 million tonnes ach

    Jan 1, 1985

  • NIOSH
    RI 4234 Edison Spodumene Mine, Pennington Co., S. Dak.

    By Fermont F. Clarke, Others, Paul Zinner

    "INTRODUCTION The Edison mine comprises workings on two irregular spodumene-bearing pegmatite dikes which outcrop near the town of Keystone in the southern portion of the Black Hills of South Dakota.

    Apr 1, 1948

  • SAIMM
    Analysis and prediction of slow landslide evolutions by using automatic displacement monitoring systems

    By T. Proietti, L. Mongiovì, L. Simeoni

    Reliable estimates of the kinematic characteristics of movements are obtained by using a statistical model SSM. This model represents a useful tool for the management of alert and alarm systems. L

    Jan 1, 2003

  • SME
    Bulking Based Porosity Method to Predict Floodable Volume of Longwall Gob - Mining, Metallurgy & Exploration (2021)

    By Greg J. Hasenfus, Allison M. Haines, Joshua M. Silvis

    The floodable volume of longwall gob can be of great importance in developing accurate coal mine operation plans, particularly for mine water management and environmental control strategies. Given the

    Aug 13, 2021

  • CIM
    Instauration des détonateurs électroniques à la mine Beaufor

    By Steve Simard

    Suite aux excellents résultats, obtenus avec la technologie des détonateurs électroniques dans des chantiers longs trous de grandes dimensions, nous avons décidé d?étendre cette technologie dans les o

    Oct 1, 2004

  • NIOSH
    OFR-61(3)-78 Coal Mine Electrical System Evaluation - Volume III - Shielded Cables

    By Lloyd A. Morley

    Proposed advantages and disadvantages of low-voltage shielded trailing cables are formulated utilizing the literature and industry sources. A partial analysis of these proposed advantages and disadvan

    Jan 1, 1977

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Introduction to the Stirred Milling of Nickel Laterites for Upgrading Nickel

    By L. Tong, D. Robinson

    "The stirred milling of nickel laterites offers possibilities for improving liberation and selective size reduction of soft nickel-bearing minerals in laterites. Batch grinding tests were performed in

    Jan 1, 2015

  • ISEE
    Monitoring Concrete Block Damage at the Fultondale School

    By John Babcock, Gregory Poole, Ron Hudson

    In January 2007, Fultondale Alabama opened a new elementary school. Site work at the old school location included blasting activities and the old school building was scheduled for demolition. With hel

    Jan 1, 2009

  • SME
    Mining to play a larger role at bauma 2010

    Once every three years the eyes of the construction and mining industry?s turn to Munich, Germany for the bauma trade fair and exhibition. From April 19-25, Messe München International (MMI) will host

    Jan 4, 2010

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000

  • ISEE
    Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators

    By M. Ganster, H. Krenn

    The mission of the project is the fast and cost-effective rehabilitation of decommissioned lignite mining and coal upgrading facilities. This is necessary to ensure the successful future utilization o

    Jan 1, 2013