Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Probabilistic Approach to Coal Pillar DesignBy Ben Fahrman
The classical approach to engineering design involves the purely deterministic calculation of the factor of safety, the ratio of strength to stress. The factor of safety is an easy calculation to perf
Jan 1, 2013
-
Designing Shotcrete As Primary Support in TunnelsBy Behdeen Oraee-Mirzamani
Since the advent of New Austrian Tunneling Method (NATM), shotcrete as a primary means of support in tunnels has been widely applied. It?s most important features are durability, speed of application
Jan 1, 2011
-
Heat-Imaging Experimental Study Of Reducing Local Gas Accumulation By Rotary Radial JetBy S. Q. Yang
Rotary radial jet improves greatly the pulsing velocity of airflow along each direction everywhere in the entry, intensifies transverse migration of air, eliminates effectively the local gas accumulat
Jan 1, 2004
-
A Study of Potential Fault Reactivation and Water Intrusion at a Longwall Coal Mine in AppalachiaBy Francis Kendorski
A longwall coal mine in Appalachia about 1,500 ft deep encountered a fault while developing a new longwall panel. The fault extended from mining depth to the surface near a secondary road and drainage
Jan 1, 2003
-
Some Technical Considerations When Mining Under Bodies Of WaterBy John W. Fredland
Conducting mining operations under a body of Water can create hazardous conditions for miners. The potential for a sudden inrush must be considered and abnormal ground control conditions can be encoun
Jan 1, 1982
-
Effects Of Bedding Plane Sliding And Separation And Tensioned Bolt In Layered Roof3-D finite element modeling was performed to study the effect of bedding plane sliding and separation and tensioned bolt in layered root It was found that the major influence zones of a tensioned bolt
Jan 1, 2001
-
The Duncan Method of Partial Pillar Extraction at Tasman MineBy Kent D. Mctyer
Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro
Jan 1, 2011
-
Localized Horizontal Stress And Its Effect On Ground ControlBy John Stankus
Regional high horizontal stress has long been recognized as an important factor affecting roof stability However, localized high horizontal stress, although causing many ground control problems, has n
Jan 1, 1999
-
Mobile Roof Supports For Pillar Retreat MiningBy Robert P. Kudlawiec
The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th
Jan 1, 2000
-
Assessment of Rockburst Hazard by Quantifying the Consequence with Plastic Strain Work and Released Energy in Numerical ModelsBy R. Kaund
"Quantifying the rockburst consequence is of critical importance to reduce the hazards with preventative measures in underground mines and deep tunnels. Contours of energy components within a pillar m
Jan 1, 2018
-
Overburden Failure Characteristics of Extra?Thick Seam Using Top Coal Caving Mining Method at Tongxin Coal MineBy Zhijie Zhu
In order to determine the overburden failure characteristics of extra-thick seam mining, EH4 electromagnetic image system and borehole televiewer survey were applied to panel 8100, Tongxin coal mine.
Jan 1, 2014
-
Tekflex As A Sprayon Screen Replacement In An Underground Hard Rock MineBy Chris Pritchard
Falconbridge Ltd., a major base metal producer in the Sudbury Basin of Ontario, Canada, identified a need to find a safe and cost effective replacement for welded-wire mesh used to support loose groun
Jan 1, 1999
-
Problems in "Void" Detection in Coal Mine Water HazardsBy Francis Kendorski
One of the most dangerous events in underground coal mining is unexpectedly encountering water inrushes from undetected abandoned mines in the same seam. The surest and most confident method is probe
Jan 1, 2004
-
Three Dimensional Numerical Modelling Of Effects Of Subsidence On EscarpmentsBy Leigh J. Wardle
Significant coal reserves in New South Wales lie under areas with steep topography such as valley slopes and cliffs. Subsidence predictions are difficult to make for these locations as existing empiri
Jan 1, 1992
-
A comparison between two- and three-dimensional numerical models of a Coeur d'Alene District mineBy T. J. McMahon
This Bureau of Mines study describes the development of a large-scale, three-dimensional, finite-element model of a deep-vein Coeur d?Alene District mine. The three-dimensional model was prepared from
Jan 1, 1989
-
Evaluating Anchorage Mechanisms Of Fully Encapsulated Rock BoltsBy Clare Offner
In 1998, the Australian Coal Association Research Program (ACARP) awarded funding to the School of Mining Engineering at the University of New South Wales to establish a rockbolt testing facility to r
Jan 1, 2000
-
The Response Of Massive Structures Inferred From Tidal Tilt Monitoring (a922d488-04e7-4665-bcdd-a85115c8db5e)At any given lime, the tidal force subjects massive regions to a spatially uniform load. The deformation of any large structure due to these forces is proportional to the elastic properties of the str
Jan 1, 1992
-
Effects of Panel Mining Sequence and Retreat Direction on the Roof Stability of Longwall Headgate EntriesBy Jinsheng Chen
The major functions of longwall headgate entries are to provide access ways to the outby submains or mains for coal transportation and to the longwall face for fresh air and for transporting men and m
Jan 1, 1998
-
Prognosis And Control Of Mining Induced Surface Subsidence And Ground Movements In The German Hardcoal Sector, Case StudiesBy Axel Preusse
This paper shows basic considerations about the prognosis and prediction of surface subsidence and other ground movements in the German hardcoal industry. The following case studies describe experienc
Jan 1, 2000
-
Systematic Principles of Surrounding Rock Control in Longwall Mining within Thick Coal SeamsBy Zhaohui Wang, Jiachen Wang
"Effective surrounding rock control is a prerequisite for realizing safe mining in underground longwall faces. In the past three decades, longwall top-coal caving mining (LTCC) and single pass large h
Jan 1, 2018