Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Flexible Support Design For Gateroads Of Retreating Longwall PanelsBy Erdal Unal
In gate roads where supports are subjected to dynamic loading four times due to retreating longwall panels, it is a real challenge to replace the rigid arches with flexible reinforcement systems and y
Jan 1, 1993
-
The Impact Of Variability In Coal Strength On Mine Planning And Design - A Case HistoryBy David A. Newman
Strength and physical property testing of coal is conducted regularly by the Arch Mineral Corporation as part of reserve exploration. Pillar design and mine layout are the primary applications for the
Jan 1, 1993
-
Modelling Of Pillar Stability In Room And Pillar MinesBy Douglas Morrison
By applying modern 3D numerical modelling techniques to the analysis of a pillar cascade failure in a room and pillar mine, it has been possible to simulate the collapse and develop an understanding o
Jan 1, 2003
-
3D FEM Simulation For Fully Grouted BoltsBy Khaled Morsy
Most of the available numerical codes simulating the reinforcing effect of fully grouted bolt are accomplished by a series of bar elements which are connected along their length to the host rock by sh
Jan 1, 2004
-
Investigation Into Cutting Characteristics Of Indian Coal Seams (bf5c67f9-81c7-4039-8f47-cd39420e2b8e)By T. N. Singh
With a view to producing increased target output every year, Indian coal mining industry is fast moving towards mechanisation but the present approach of mechanisation suffers from lack of standardisa
Jan 1, 1992
-
Drag Picks - Influence Of Tool Geometry And Angle Of Arrack On The Stress Evolution And Cutting EfficiencyDuring the last decade mechanical rock excavation has become increasingly widespread in the mining industry and, more in general, in excavation engineering. This technology, especially the tools and t
Jan 1, 1990
-
The Elimination of Rock-fall Fatalities in Ontario Hardrock MinesBy Douglas Morrison
Hardrock mines in Ontario generally operate at between 3,000 and 7,500 ft below surface and generally experience significant rockburst activity below 5,000 ft. Since the introduction of bulk mining te
Jan 1, 2003
-
Manifestation Of Mine Pressure And Its Relations To Overlying Strata MovementsBy Z. C. Song
[THIS PAPER WAS TRANSLATED FROM CHINESE TO ENGLISH BY S. S. PENG, WEST VIRGINIA UNIVERSITY] Immediately after coal extraction, the pressure that causes the movement of the surrounding strata is c
Jan 1, 1982
-
Seepage and Reinforcement Behavior of Grouting Into Slaking-Prone Mine Tunnel FloorBy Hideki Shimada
In underground coal mines, grouting method is employed in order to reinforce the floor and to control the movement of groundwater into the roadway. However, the seepage and the reinforcement behavior
Jan 1, 2002
-
The Structural Response Of A Steel Lattice Transmission Tower To Mining-Related Ground MovementsBy Robert W. Bruhn
A 125 foot high steel lattice frame tower supporting a 500 kV EHV transmission line and located over the gateroads of a longwall mining operation was subjected to ground movements from the mining of a
Jan 1, 1990
-
Assessment Of Applicability Of Strength Criteria For Rock And Rock Mass To Coal PillarsThe applicability of four empirical strength criteria for rock masses, namely, Hoek and Brown, Bieniawski - Yudhbir et al., Rarnamurthy - Arora and Johnston - Sheorey et al. has been tested against th
Jan 1, 1992
-
Floor Heave in Shallow Room-and-Pillar MiningBy André Zingano
This paper analyses possible causes for floor heaving in room-and-pillar coal mining. The coal mines are in the southern part of Brazil, where the Barro Branco Coal Seam varies in depth from 20m to 40
Jan 1, 2002
-
Stress Analysis and Support Design for Longwall Mine-Through Entries (A Case Study)By Keith Heasley
An eastern longwall mine was required to mine through a set of three entries located midway down the length of a panel. Of course, the mine desired to design a successful support system for the mine-t
Jan 1, 2003
-
Evaluation of Rockburst Hazard from Core TestingBy Michael Alber
Coal resource extraction reaches higher depth of overburden and rockbursts as well as associated seismic events appear to become an additional problem to he addressed by ground control engineers. For
Jan 1, 2004
-
System Behavior of Roof Bolt Systems with Varying Bearing Plate I Angle Compensating Device CombinationsBy Gregory E. Smith
"Tensionable headed roof bolt systems are common in the U.S. mining industry. In the last 15 years or so, they have made a comeback as a hybrid system where a mechanical anchor is used in conjunction
Jan 1, 2016
-
Greater Safety With Increased Productivity Coal Mining OperationsBy William B. Beerbower
When full length resin grouted bolts were introduced into U. S. coal mines some 11 years ago, it was assumed that safety would be the primary benefit. There is ample testimony to substantiate the safe
Jan 1, 1982
-
Changes In Seismic Measurements With Blast Induced Fracturing: A Field ExperimentBy Clifford J. Roblee
In this paper, various seismic indicators are evaluated for ability to discern fractures induced into a rock mass by blasting. This is accomplished by presenting results from in situ crosshole seismic
Jan 1, 1989
-
Comparison of Acoustic Emission and Stress Measurement Results to Evaluate the Application of the Kaiser Effect for Stress Determination in Underground MinesBy Lorraine Kent
Comparison of in-situ stress overcore measurement results with those determined from laboratory evaluation of Acoustic Emission (AE) testing on oriented sub-core samples has been carried out for a var
Jan 1, 2002
-
Three-Dimensional Analysis Of Mine Dump Point StabilityBy Radoslaw L. Michalowski
The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li
Jan 1, 1990
-
Extended Cut Out Distances In Continuous Miner Sections In South African CollieriesBy Ismet Canbulat
The cut out distance in the continuous miner sections in South African collieries is limited to 12 m. However, this distance can be extended to 24 m by the permission of the Department of Mineral and
Jan 1, 2000