Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Numerical Modelling of the Range of Rock Fracture Zone Around Gateroads on the Basis of Underground Measurement Results (edbcb7c0-6a88-4056-904b-d121adf0097c)

    By Andrzej Walentek

    This paper presents the results of numerical modeling of the fractured zone around longwall gateroads. The numerical computations have been based on the results of underground measurements of the frac

    Jan 1, 2009

  • SME-ICGCM
    Prediction of surface movement with emphasis on horizontal deformation due to mining

    By Mao Bai

    In predicting the integrity of under-mined structures, surface horizontal displacements and curvatures are frequently of greater importance than the more homogeneous vertical displacements. Accurate e

    Jan 1, 1989

  • SME-ICGCM
    Effects of Rock/Coal Interface Property on Coal Pillar Strength

    By Jun Lu

    There are many factors affecting the strength of pillar, including width-to-height (W/H) ratio, mechanical properties of coal and surrounding rocks, property of partings in the coal, and the interface

    Jan 1, 2008

  • SME-ICGCM
    Practical Aspects Of Mobile Roof Support Usage

    By F. E. Chase

    Mobile roof supports are shield-type support units mounted on crawler tracks. Mobile roof support (MRS) units are used during retreat mining, and they eliminate the setting of roadway, turn, and cross

    Jan 1, 1996

  • SME-ICGCM
    A Study of Roof Caving in the Eastern U.S. Coalfields

    Appropriate roof control is the most important requirement in underground coal mining and, in the case of longwall panels or second mining in room and pillar extractions, this can be simply expressed

    Jan 1, 1986

  • SME-ICGCM
    Automated Monitoring Of Rock Slopes And Waste Dumps

    By Andrew G. Martin

    In 1991, Modular Mining Systems began marketing a Slope Monitoring System (SMS) now installed at twelve mines. The SMS uses automated wire line extensometers to monitor field conditions frequently. Ev

    Jan 1, 1996

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • SME-ICGCM
    Three-dimensional FEM analysis to sale field measurements from deep mine accessways

    By M. J. Beus

    A shaft is truly the "lifelinen of an underground mine. Damage to the shaft lining and guides as a result of ground movement can result in serious loss of production and extensive and continual repair

    Jan 1, 1989

  • SME-ICGCM
    Three-Seam Stress Analyses at Bowie Mines, Colorado

    By Hamid Maleki

    In this paper, the authors present a review of data gathering programs and stress analyses for improving mine layout designs at BRL mines located near Paonia, Colorado. BRL and other companies have

    Jan 1, 2007

  • SME-ICGCM
    Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W

    By Yi Luo

    In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a

    Jan 1, 2008

  • SME-ICGCM
    Ropes mine crown pillar rock mechanics

    By W. G. Pariseau

    A crown pillar cave occurred at the Ropes Mine in December, 1987, that resulted in closure of the mine. Production was resumed soon afterwards with the formulation of a rock mechanics plan designed to

    Jan 1, 1989

  • SME-ICGCM
    Analysis of Small-Scale Thrust Faults and Their Effect on Coal Mining in Southern West Virginia

    By Thomas Z. Jones

    Deep mining within the Sewell Coal member of the New River Formation in southern West Virginia has exposed several small-scale thrust faults and related features. The faults were en- countered in West

    Jan 1, 1986

  • SME-ICGCM
    State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (6805422e-8080-42ac-9a3a-30ed4eeda62f)

    By Alan A. Campoli

    The U.S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of

    Jan 1, 1996

  • SME-ICGCM
    Application Of Seismic Tomography In Underground Mining

    By D. F. Scott

    Seismic tomography, as used in mining, is based on the principle that highly stressed rock will demonstrate relatively higher P-wave velocities than rock under less stress. A decrease or increase in s

    Jan 1, 1996

  • SME-ICGCM
    Subsidence Prediction for Multiple Seam Extraction under Consideration of Time Effects by the use of Geomechanical Numerical Models

    By Jurgen te Kook

    State-of-the-art for subsidence calculation are stochastical models. Although these models were successfully used all over the world they have their limitations due to the fact that they are not based

    Jan 1, 2008

  • SME-ICGCM
    Rating Coal Mine Roof Strength From Exploratory Drill Core

    Characterizing coal mine roof rock is extremely important for hazard assessment, reinforcement, and entry design. The Coal Mine Roof Rating (CMRR) is an innovative rock mass classification that has fo

    Jan 1, 1996

  • SME-ICGCM
    Rock Mechanics Investigations on Seismic Events Around Two Longwall Coal Operations

    By Michael Alber

    Coal mining by the longwall method typically causes seismic events. This paper describes the research on mining induced seismicity around two specific longwalls at 1100m depth under several old longwa

    Jan 1, 2008

  • SME-ICGCM
    Applications Of New Technologies To The Technical Design And Monitoring Of Longwall Panels

    By Brad R. Blair

    This paper will review impacts on longwall design and ground stability assessment due to advances in mine automation and sensing technology. Several new approaches to the prediction and monitoring of

    Jan 1, 1996

  • SME-ICGCM
    Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)

    By C. Dinis da Cama

    In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat

    Jan 1, 1984

  • SME-ICGCM
    Airbag Support for Ground Control in Thin Seam Coal Mining

    By Fan Shaogang

    In this paper, the airbags' structure and technical characteristics and its applications in China are described. Based on the practice of the airbags in mining thin seams, the effects on ground c

    Jan 1, 1997