Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Barrick?s Zaldivar Mine Gets A Dome Cover Over Its Stockpile

    The Barrick Zaldivar mine is an openpit, heap-leach copper mine in Region II of northern Chile at an elevation of 3,300 m (10,826 ft), approximately 1,400 km (870 miles) north of Santiago and 175 km (

    Jan 1, 2009

  • SME
    Challenges in undertaking inertisation of fires in underground mines

    By A. D. S. Gillies

    Inertisation is used to enhance the safety of underground mine areas either to avoid the potential for a combustion event or to stabilize a situation after an ignition, fire or heating. The primary ob

    Jan 1, 2009

  • SME
    Longwall Control At Shoal Creek

    By Debasis Deb

    The first version of the longwall strata control and maintenance system (LSCMS) has been successfully developed by the Strata Control Re¬search Team at the University of Alabama. The system includes a

    Jan 1, 1997

  • SME
    Political-Risk Management in the Northern Andean Countries

    By W. J. Spat

    Political risk is an integral part of the mining business in northern Andean countries. Peru, Ecuador, Colombia and Venezuela all have a higher than average political risk compared with other South A

    Jan 1, 2000

  • SME
    Middle Rouge Parkway Interceptor Extension—A Case History

    By Harry R. Price, Behrooz Tahmasbi, Charles J. Roarty

    The 2,408 meter (7,900-foot) long Middle Rouge Parkway Interceptor Extension varies in size from 1.52-meter (5-foot) to 2.36 meter (7-foot 9-inch) inside diameter. Most of the sewer was constructed in

    Jan 1, 2007

  • SME
    The Effect Of Rock Type And Tunneling Machine On Bulk Material Handling Parameters

    By Donald E. Raab, Lee W. Saperstein

    INTRODUCTION The Premise Not much time has to be spent in a tunneling project to realize the tremendous interdependence that exists among the various unit operations. The research that is to be

    Jan 1, 1974

  • SME
    Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project

    By Faruk Oksuz, Phillip L. Covell, Martin Doll

    A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200

    Jan 1, 2007

  • SME
    Use of Simulation to Validate Load And Haul Requirements at Cortez Gold Mines

    By W. L. Jacobsen, T. L. Dyer

    Cortez Gold Mines is completing a Feasibility Study for a new open pit gold mine in north central NV. The production schedule calls for a peak in material movement. This schedule is based on current o

    Jan 1, 2006

  • SME
    Investigation and Abatement of Subsidence Damage at the Heltsley Residence, Indiana

    By Robert A. Cummings, Madan M. Singh

    In April 1984 a subsidence depression formed directly beneath a two-story frame residence, near Linton, IN, causing 2 ft of separation between the floor and walls, and damaging both the foundation and

    Jan 1, 1986

  • SME
    Implementing a tracking and ventilation control system at Barrick Goldstrike?s underground division

    By M. A. Meyer

    Underground mining accidents in the USA in recent times have prompted the Mine Safety and Health Administration (MSHA) to review emergency and tracking systems for underground mines. Several communica

    Jan 1, 2009

  • SME
    Cummins’ Diesel Engines Ready to Meet Global Clean Air Regulations

    By Steve Kral

    In the United States, the U.S. Environmental Protection Agency (EPA) is set to implement its Tier 2 air quality standards governing high-horsepower, off-road diesel engines. The regulations take effe

    Jan 1, 2004

  • SME
    Model And Experimental Study Of The Effect Of Impeller Rotational Speed On The Flotation Rate From A Small-Scale Flotation Cell - Implications For The Effect Of Bubble Velocity

    A series of flotation experiments were carried out in a 2.25-dm3 laboratory-scale Rushton turbine cell using hydrophobic quartz particles. Flotation was performed at a constant mean bubble diameter ov

    Jan 1, 2007

  • SME
    Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058

    By D. McBride

    Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists

    Jan 1, 2009

  • SME
    Driving Point Impedance—A New Paradigm For Detecting Fracture And In Situ Stress In Boreholes

    By D. M. Weinberg, S. R. Novascone, R. R. Reynolds, J. H. Cole, C. D. Christensen

    The mechanical properties of the rocks surrounding an orbital vibrator alter the shape and amplitude of the vibrator’s orbit. Detecting these changes with driving point impedance measurements promises

    Jan 1, 2002

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • SME
    Reclamation Work Reclaims Gold Tailings in the Black Hills of South Dakota

    By Fred D. Fox

    Introduction Abandoned mill tailings deposits can be found throughout the northern Black Hills of South Dakota, indicative of mining activities that originated during the great gold rush days of 1875

    Jan 11, 1984

  • SME
    1970s – SME Moves Headquarters From New York

    By William M. Gleason

    The war in Vietnam stretched into another decade, an American President was at the brink of impeachment, the earth was given its own day, twin tower monuments of American ingenuity were completed in N

    Jan 1, 2007

  • SME
    Nutley Quarry Trunk Sewer Project

    By Michael V. Mergentime, Prakash M. Donde

    The Nutley Quarry Trunk Sewer Project is a good example of a tunnel that went through difficult and complex ground. The 2 m (7ft.) diameter and 840 m (2,750 ft.)long tunnel passed through soft ground,

    Jan 1, 2001

  • SME
    Exploration Review (f6032b03-79e7-49ca-8f8a-1df7796897e6)

    By D. R. Wilburn

    This summary of international mineral exploration activities for the year 2009 draws upon information from industry sources, published literature and U.S. Geological Survey (USGS) specialists. The su

    May 1, 2010

  • SME
    No. 7 Subway Extension Crossing Under An Existing Subway Station: Challenges And Integration Of Underpinning Into The Design Of New Tunnels

    By Aram Grigoryan

    This paper addresses the challenges of designing the underpinning of major sub-way station with 4 operating tracks. No. 7 subway extension crosses under the existing 42nd street subway station on the