Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Minnesota Iron Mining Industry Looks at ChangeBy William R. Yernberg
The combined 76th Annual Minnesota Section of SME meeting and 64th Annual University of Minnesota Mining Symposium were held April 8and 9, 2003, in Duluth, MN. This year’s theme was “Stakeholders, Par
Jan 1, 2003
-
Surface ExtractionBy Christopher J. Bise
INTRODUCTION The level of analysis for the selection of extraction practices and equipment for surface mining differs significantly from that found in underground mining. In underground mines, manuf
Jan 1, 1986
-
The Dulles Corridor Metrorail Project—Extension to Dulles International Airport and Its Tunneling AspectsBy V. Gall, J. Rudolf
The Virginia Department of Rail and Public Transportation and the Metropolitan Washington Airports Authority are undertaking the extension of Washington Metropolitan Area Transit Authority’s Metrorail
Jan 1, 2007
-
The Big Walnut—A Planned ApproachBy Tom Szaraz, Steve Skelhorn
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer (BWOAS) consists of 4,000m (13,200 ft) of 3.66m (12 ft)diameter tunnel passing mainly through
Jan 1, 2007
-
Alaska Gold and Southwest Copper – How Daniel Jackling Brought Copper Know-How to the Juneau Gold BeltBy T. Braun
In 1911, a young mining engineer named Bartlett Thane assembled a large claim block, 4 miles southeast of Juneau, Alaska. Across the Gastineau Channel on Douglas Island, the Alaska Treadwell Gold Mini
Jan 1, 2019
-
U.S. Longwall Development Projected to IncreaseBy James F. Kvitkovich, George V. Weisdack
Editor’s note: This is the second part of a two-part series on longwall mining in the United States. Part one was published in the December 2005 issue of ME (pp. 21-26). It provided a history of lo
Jan 1, 2006
-
Adeco As An Alternative To NATM: How It Works, WHY It WorksBy Fulvio Tonon
And Rabcewicz said ?tunnels should be driven full face whenever possible.? ADECO, which stands for ?Analysis of Controlled Deformations in tunnels,? now allows us to fulfll Rabcewicz?s dream in any st
-
The Impact Of Surface Features Above Underground Mines On Emergency Response - Preprint 09-066By N. T. Lowe
The National Institute for Occupational Safety and Health (NIOSH), Spokane Research Laboratory (SRL), investigated a means to evaluate the potential impact of surface conditions above underground mine
Jan 1, 2009
-
Urban Resource Issues: Construction Aggregate AssessmentBy M. Rice, M. Stanley, J. Marlow
Arizona construction aggregate industry remains in the crosshairs of public debate, caught between the need for aggregate-based building materials and alternative, high-value land-uses. To better mana
Jan 1, 2002
-
Reconnecting The Rogue River To The Channel Migration Zone: An In-Channel Bank Stabilization ProjectBy E. F. Schnitzer, D. R. Haight, G. T. Krogman
The 1997 New Year’s Day Rogue River flood near Medford, Oregon, USA, entered historic channels, eroded a 150-foot-wide buffer, and captured an inactive gravel pond located within the channel migration
Jan 1, 2006
-
Numerical Analysis for the Prediction of Bump Prone Conditions: A Southern Appalachian Pillar Coal Bump Case StudyTwo miners were fatally injured when a pillar bump occurred during retreat mining in a southern West Virginia coal mine. The mine was operating in the Eagle seam with overmining in the No. 2 Gas and P
Jan 7, 2020
-
St. Cloud Mining Company’s Stone House Zeolite Mine And New Uses For ClinoptiloliteBy G. S. Austin
The St. Cloud Mining Company extracts clinoptilolite about 6.5 km south of Winston, Sierra County, New Mexico. Production is about 18,000 mt/year. Natural zeolites are good adsorbents for positively c
Jan 1, 2002
-
An Innovative Approach to Tunneling in the Swelling Queenston Formation of Southern OntarioBy Michael Hughes, Paul Bonapace, Harry Charalambu, Stephen Rigbey
Ontario Power Generation is building a 10.4-km water diversion tunnel in Niagara Falls, Canada. The tunnel is a two-pass, cast-in-place prestressed concrete-lined pres-sure tunnel with a nominal inter
Jan 1, 2007
-
Upgrading Low Rank Coal Using The Koppelman Series C Process – Preprint 97-143By N. Merriam
This report describes Koppelman's work to develop the K-Fuel® Series C Process used to dry and stabilize Powder River Basin coal. It also contains summaries of the results of bench-scale and pilo
Feb 24, 1997
-
Geographic Information Systems In Borate Exploration: A Case Study At “Old Borate”By J. R. Piper
“Old Borate,” located in the Calico Mountains east of Barstow, California, lead domestic colemanite production from 1884 through 1907. Mineral exploration at “Old Borate” in the early 1980's, e
Jan 1, 2001
-
An Evaluation Of Microseismic Activity Associated With Major Roof Falls In A Limestone Mine: A Case StudyBy T. Bajpayee, J. Ellenberger
Microseismic monitoring and evaluation is one aspect of the National Institute for Occupational Safety and Health (NIOSH) research program. Roof falls are often preceded by a period of elevated micro
Jan 1, 2007
-
Big Walnut Outfall Augmentation Sewer?Part II: Tbm Case HistoryBy Tom Szaraz
Part of a major sewer expansion for the City of Columbus, Ohio. The Big Walnut Outfall Augmentation Sewer?Part II (BWOAS) consists of 13,200 feet of tunnel of 12-foot tunnel passing mainly through gla
-
Development Of Duval Corporation's Sierrita MireBy Thomas Jancic
Two of the open-pit, copper-molybdenum mining operations of Duval Corporation are located in the foothills of the Sierrita Mountains approximately 30 miles southwest of Tucson, Arizona. In March 1959,
Jan 1, 1971
-
Roof And Rib Hazard Assessment For Underground Stone Mines – Preprint 97-113By L. J. Prosser, A. T. Iannacchione
Unfortunately from 1991 through 1995, 44 miners were fatally injured in the stone industry. Of these 12 occurred at underground mines from a total work force of less than 2,000 miners. Nine of these 1
Feb 24, 1997
-
Proactive Approach To Addressing Environmental Concerns For Tunneling Under AustinBy Ray Brainard
The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot
Jan 1, 2012