Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Glow Discharge Optical Emission Spectroscopy: a General Overview with Regard to Nuclear MaterialsBy S. J. Lötter, J. T. Nel, W. Purcell
"SynopsisGlow discharge optical emission spectroscopy (GD-OES) is an analytical technique used in the analysis of solid, conducting materials. Though primarily of interest as a depth profiling techniq
Jan 1, 2015
-
Estimating Mine Planning Software Utilization for Decision-Making Strategies in the South African Coal Mining SectorBy T. Celik, B. Genc, C. Musingwini
"Mine planning software continues to be an important factor when it comes to the development of the South African mining industry. To contribute to this development, a new methodology to define and me
Jan 1, 2016
-
The Youga Gold Project - A West African Project Financing Case Study (98dba44f-d023-4a1b-aa5b-2a4dc1105351)By J. Forwood
The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from
Jan 1, 2007
-
Q-coda estimation in the Kaapvaal CratonBy D. Grobbelaar, A. Cichowicz, D. J. Birch
The Q-coda method for estimating the quality factor Q(f)= Qo(f)n was used to characterize seismic wave attenuation in a region of the Kaapvaal Craton that includes the mining areas of the Bushveld Com
Jan 1, 2015
-
Engineering application of thrust block analysis in slope stability problems in open pit mines - SynopsisBy K. N. Karparov
The classical limit equilibrium methods are suspected to be ineffective in predicting the potential for highwall failure in many instances in coal mines around the world. Slope engineers have for many
Jan 1, 2009
-
Stability Considerations for Slopes Excavated in Fine Hard Soils/Soft Rocks at Cobre Las Cruces Mine, Sevilla, SpainBy J. M. Galera, M. D. Rodriguez, V. Pozo, S. Cooper
"Cobre Las Cruces mine extracts copper minerals from a VMS deposit located in the well-known Iberian Pyrite Belt (IPB). As an open pit, it is distinguished geologically from other IPB mines by the pre
Jul 1, 2019
-
Rock Engineering Aspects of a Modified Mining Sequence in a Dip Pillar Layout at a Deep Gold MineBy D. F. Malan, Y. Jooste
"SynopsisScattered mining was practised on Kusasalethu Mine (previously Elandsrand Gold Mine) prior to 1998, but at deeper mining levels it was no longer feasible, since it would have resulted in unac
Jan 1, 2015
-
Application of modified Hoek-Brown transition relationships for assessing strength and post yield behaviour at both ends of the rock competence scale - SynopsisBy T. G. Carter
Support system design for tunnels and underground excavations has for many years relied heavily on the use of rock mass classification systems and the Hoek-Brown failure criterion as a means for chara
Jan 1, 2008
-
Large-scale deformation in underground hard-rock minesBy P. Turcotte, E. Karampinos, F. Mercier-Langevin
In some underground hard-rock mines, squeezing compressive ground conditions are influenced by the presence of rock foliation and high stress. In these cases, the orientation of the foliation with res
Jan 1, 2015
-
Development Of High Resolution 3D Vertical Seismic Profiles - SynopsisBy C. C. Pretorius
3D seismic surveys have become a well-accepted method of imaging sub-surface geology in the Bushveld Basin. Because both the seismic sources and receivers are placed at surface, most surveys are limit
Jan 1, 2011
-
Introduction To Nuasahi Chromite Mine ? An Under Ground Chromite MineBy Vinay Kumar Agrawal, Rama Nath Praharaj
IMFA Group is the largest producer of Charge chrome not only in India but also in Asia. This Group has plants situated at Therubali and at Choudwar. They also have a Thermal power plant at Choudwar wh
Jan 1, 2007
-
In-situ stress measurements in an underground oil storage cavern using hydro-fracturing and overcoring methodsBy S. O. Choi, C. Park, C. Sunwoo
Two methods of stress measurements have been executed on the surface and underground to con-struct an oil storage cavern using hydro-fracturing and overcoring method. The first measurement has been pe
Jan 1, 2003
-
A Heuristic Sublevel Stope Optimizer With Multiple RaisesBy X. Bai
A new heuristic sublevel mining stope optimizer is presented. The optimizer seeks the best locations and lengths of a series of vertical raises that, together with the blocks linked to each raise, def
Jan 1, 2014
-
Blast optimization at Kriel Colliery - SynopsisBy A. M. Neale
Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe
Jan 1, 2010
-
Laser surface alloying of Al with Cu and Mo powdersBy S. T. Camagu, J. Dutta Majumdar, S. L. Pityana
Laser surface alloying was used to develop copper and molybdenum aluminides by injecting premixed copper and molybdenum powder particles into a laser-generated melt pool on an aluminium substrate. Dif
Jan 1, 2015
-
A Case Study Of Risk Evaluation At Cerrejon MineBy Luis-Fernando Contreras, Juliano Maran, Richard LeSueur
A risk study was carried out at the Cerrejon coal mine in order to assess the impacts of pit slope failure in terms of safety of personnel and destruction of equipment with economic consequences. Res
Jan 1, 2006
-
Optimization of shuttle car utilization atan underground coal mineBy P. R. Segopolo
"The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc
Jan 1, 2015
-
Characterisation Of SO2 In Off-Gas At Zimplats SmelterBy L. Mabiza
Keywords: Pyrometallurgy, furnace, sulphur, SO2, off-gas, Zimplats Zimplats embarked on an off-gas sampling campaign in December 2009 to characterise the concentration of SO2 in the off-gas from
Jan 1, 2011
-
Ventilation For Sinking Vertical, Sub Vertical And Decline Shafts. (99e42c4d-99aa-4cc4-8f39-b9fd16895c17)By D. M. Walters
To achieve safe and healthy working conditions in shaft sinking operations, ventilation, and where necessary cooling, must be provided. These requirements are considered for sinking vertical, sub-vert
Jan 1, 2009
-
Limitations in Accepting Localized Conditioning Recoverable Resource Estimates for Mediumterm, Long-Term, and Feasibility-Stage Mining Projects, Particularly for Sections of an Ore DepositA localized nonlinear recoverable resource estimate technique has been applied using typical feasibility or new mining drilling data configurations drawn from a massive database from a mined-out area
Jan 1, 2014