Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in CanadaBy Scott King, Norm Patterson, Ruilin Yang
The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w
Jan 1, 2018
-
Guidelines for Mining and Quarry Blasting Urban Areas Brazilian Regulation NBR 9653 Under Current ReviewedBy Denise de La Corte Bacci
The Brazilian Regulation NBR 9653 is a guide intended to evaluate mine and quarry blasting effects in urban areas. The first version, written in 1986 by the Committee of the Brazilian Associate of Tec
Jan 1, 2005
-
Dispersion Signal Analysis in a Split-Hopkinson Pressure Bar at the University of KentuckyBy Jhon Silva-Castro, Russell Lamont
Understanding the behavior of materials subjected to high strain rate conditions is of fundamental importance to the mining industry. Several stages of the mining process involve high speed loading ra
Jan 1, 2017
-
Analysis of Data Collected from Ti/Al Conical Shaped Charge Penetration of Geological TargetsBy Jason Baird, Braden Lusk, Dominique Nolan, Allen Stults
Conical shaped charges have been used to penetrate rock for many years now. Examinations have been made looking at shaped charge liner geometry, material, and standoff, as well as explosive compositio
Jan 1, 2012
-
A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development ProjectsBy Robert Lee, Pertti Paavola
Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in
Jan 1, 2004
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
Mining Cost Optimization Strategy Based on Adaptive Blast DesignBy Huang Daguang, Paulo Couceiro, Juan Navarro
Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co
Feb 6, 2023
-
Measured Results of the Influence of a Large-Scale Fault on Blasting Vibrations in Sublevel Open StopingExisting geological structures such as faults or shear zones can greatly influence the interpretations of amplitude or energy attenuations of measured blasting vibrations along both affected and unaff
Jan 1, 2011
-
Fragmentation Optimization Techniques using 5.5 inch Hole Plugs at the Holcim Cement – St. Genevieve QuarryBy Douglas Bartley
As the economy continues to slowly recover, our industry continues to finds ways to increase productivity while being forced to cut costs. The drilling and blasting process is the starting point of an
Jan 1, 2012
-
Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" DamBy Jennifer Williams, Donald J. Berger
Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of
Jan 1, 2014
-
Use of Electronic Initiation System in Urban Shaft Sinking ProjectBy Richard Turnbull, James Purssey
"The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be
Jan 1, 2017
-
Testing of a New Blasting Mat Constructed Using Rubber Tractor TreadsBy Matthew K. Coy, Paul N. Worsey
The work described in this paper comprised the master’s thesis work of the primary author and was conducted at the Missouri S&T experimental mine. The objective was to determine if rubber tractor trea
Jan 1, 2015
-
A Mine-to-Crusher Framework for Aggregate OperationsBy Diogo Fonseca, José Manuel, Nuno Fernandes, Blessing Taiwo
This research focuses on enhancing the synergy between blasting and primary crushing operations in quarries. A blast operation at dstgroup aggregate quarry in northern Portugal was simulated to fine-t
Jan 21, 2025
-
Vertical Attenuation of Blast VibrationsBy Catherine T. Aimone-Martin, Brent Meins
Blast vibration monitoring for buried pipelines is typically conducted at the ground surface with a shallowly buried geophone. In many jurisdictions across the U.S., blast-related vibration limits se
Jan 1, 2019
-
Feasibility of Applying Probabilistic Risk Assessment to TerrorismBy Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson
"The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T), utilizes a probabilistic risk assessment (PRA) approach to explore the risks (anduncertaint
Jan 1, 2017
-
Digital Shock TubeBy Theirry Bernard
The era of non-electric systems as an initiating system has revolutionised the blasting world by introducing a very safe initiating system that is reliable, with initiation sequence possibilities that
Jan 1, 2007
-
Dynamic Response of Buried Oil Pipeline Caused by Tunneling BlastingBy Zheng Shuangying
The vibration effect of the buried oil pipeline caused by tunneling blasting affects the pipeline safe transportation, tunnel construction schedule and its construction cost. The dynamic response char
Jan 1, 2015
-
Explosion Hazards and Quantity-Distance Regulations – A Review of their Physical BasisCurrently there exist several explosive quantity-distance (Q-D) rules variously exercised by most countries to protect personnel and property against the effects of accidental explosions. These regula
Jan 1, 2011
-
A Comprehensive Blast Damage Control Plan for The Missing LinkBy Alvin D. Christmas
The missing link is a connector between the congested downtown area of Knoxville, Tennessee adjacent to the former World's Fair site, the I_40 I_75, and Western Avenue traffic arteries. This connecter
Jan 1, 1995
-
The Specifications said No BlastingBy Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz
This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci
Jan 1, 2012