    Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in Canada

    By Scott King, Norm Patterson, Ruilin Yang

    The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w

    Jan 1, 2018

  • ISEE
    Guidelines for Mining and Quarry Blasting Urban Areas Brazilian Regulation NBR 9653 Under Current Reviewed

    By Denise de La Corte Bacci

    The Brazilian Regulation NBR 9653 is a guide intended to evaluate mine and quarry blasting effects in urban areas. The first version, written in 1986 by the Committee of the Brazilian Associate of Tec

    Jan 1, 2005

  • ISEE
    Dispersion Signal Analysis in a Split-Hopkinson Pressure Bar at the University of Kentucky

    By Jhon Silva-Castro, Russell Lamont

    Understanding the behavior of materials subjected to high strain rate conditions is of fundamental importance to the mining industry. Several stages of the mining process involve high speed loading ra

    Jan 1, 2017

  • ISEE
    Analysis of Data Collected from Ti/Al Conical Shaped Charge Penetration of Geological Targets

    By Jason Baird, Braden Lusk, Dominique Nolan, Allen Stults

    Conical shaped charges have been used to penetrate rock for many years now. Examinations have been made looking at shaped charge liner geometry, material, and standoff, as well as explosive compositio

    Jan 1, 2012

  • ISEE
    A High=Preformance Vibration Monitoring and Data Distribution System for Large-Scale Urban Development Projects

    By Robert Lee, Pertti Paavola

    Automated vibration monitoring and web-based data distribution has proven itself on the largest single construction project ever undertaken in Finland. The excavation for the Kamppi Center Project in

    Jan 1, 2004

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

    Feb 1, 2020

  • ISEE
    Mining Cost Optimization Strategy Based on Adaptive Blast Design

    By Huang Daguang, Paulo Couceiro, Juan Navarro

    Mining is typically conducted through a set of interdependent unit-operations, which commonly include drilling, blasting, digging and hauling, in order to deliver the required ore material into the co

    Feb 6, 2023

  • ISEE
    Measured Results of the Influence of a Large-Scale Fault on Blasting Vibrations in Sublevel Open Stoping

    Existing geological structures such as faults or shear zones can greatly influence the interpretations of amplitude or energy attenuations of measured blasting vibrations along both affected and unaff

    Jan 1, 2011

  • ISEE
    Fragmentation Optimization Techniques using 5.5 inch Hole Plugs at the Holcim Cement – St. Genevieve Quarry

    By Douglas Bartley

    As the economy continues to slowly recover, our industry continues to finds ways to increase productivity while being forced to cut costs. The drilling and blasting process is the starting point of an

    Jan 1, 2012

  • ISEE
    Blasting a Diversion Tunnel through the Abutment of a "Meta-Stable" Dam

    By Jennifer Williams, Donald J. Berger

    Originally built between 1913 and 1916, the Ashton Dam & Hydroelectric Facility has experienced various seepage and piping incidents since completion. Ashton Dam is located within 15 miles (24 km) of

    Jan 1, 2014

  • ISEE
    Use of Electronic Initiation System in Urban Shaft Sinking Project

    By Richard Turnbull, James Purssey

    "The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be

    Jan 1, 2017

  • ISEE
    Testing of a New Blasting Mat Constructed Using Rubber Tractor Treads

    By Matthew K. Coy, Paul N. Worsey

    The work described in this paper comprised the master’s thesis work of the primary author and was conducted at the Missouri S&T experimental mine. The objective was to determine if rubber tractor trea

    Jan 1, 2015

  • ISEE
    A Mine-to-Crusher Framework for Aggregate Operations

    By Diogo Fonseca, José Manuel, Nuno Fernandes, Blessing Taiwo

    This research focuses on enhancing the synergy between blasting and primary crushing operations in quarries. A blast operation at dstgroup aggregate quarry in northern Portugal was simulated to fine-t

    Jan 21, 2025

  • ISEE
    Vertical Attenuation of Blast Vibrations

    By Catherine T. Aimone-Martin, Brent Meins

    Blast vibration monitoring for buried pipelines is typically conducted at the ground surface with a shallowly buried geophone. In many jurisdictions across the U.S., blast-related vibration limits se

    Jan 1, 2019

  • ISEE
    Feasibility of Applying Probabilistic Risk Assessment to Terrorism

    By Natalie Zeleznik, Brian Hawkins, David Bradley, Rachel Gooding, Patrick Wilson

    "The United States (U.S.) Department of Homeland Security (DHS) Directorate of Science and Technology (S&T), utilizes a probabilistic risk assessment (PRA) approach to explore the risks (anduncertaint

    Jan 1, 2017

  • ISEE
    Digital Shock Tube

    By Theirry Bernard

    The era of non-electric systems as an initiating system has revolutionised the blasting world by introducing a very safe initiating system that is reliable, with initiation sequence possibilities that

    Jan 1, 2007

  • ISEE
    Dynamic Response of Buried Oil Pipeline Caused by Tunneling Blasting

    By Zheng Shuangying

    The vibration effect of the buried oil pipeline caused by tunneling blasting affects the pipeline safe transportation, tunnel construction schedule and its construction cost. The dynamic response char

    Jan 1, 2015

  • ISEE
    Explosion Hazards and Quantity-Distance Regulations – A Review of their Physical Basis

    Currently there exist several explosive quantity-distance (Q-D) rules variously exercised by most countries to protect personnel and property against the effects of accidental explosions. These regula

    Jan 1, 2011

  • ISEE
    A Comprehensive Blast Damage Control Plan for The Missing Link

    By Alvin D. Christmas

    The missing link is a connector between the congested downtown area of Knoxville, Tennessee adjacent to the former World's Fair site, the I_40 I_75, and Western Avenue traffic arteries. This connecter

    Jan 1, 1995

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012