Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Tunnel Construction Efficiency and Vibration Control using Electronic Detonators: Focusing on the Contour Holes and Decking Mode

    By Sami Kara, Yunseok Park, Seung-Joong Lee, Namsun Hwang, Michael Laing

    This study conducts a comparative analysis of construction efficiency. In the first part we compared electronic and non-electric initiation systems, focusing on tunnel contour holes. Field blasting op

    Jan 21, 2025

  • ISEE
    Journal: From the Executive Director / The Explosives Industry and the New Economy / ISEE’s 35th Anniversary marks economic challenges

    By Jeff Dean

    As the Society celebrates its 35th year as an explosives industry association, it is clear that we are part of an industry that covers many sectors of economic activity. We are the voice of those who

    Jan 1, 2010

  • ISEE
    Prediction of Seed Waveforms Using Surface Wave Dispersion Information

    By Brian Warner, Siavash Mahvelati, Douglas Rudenko, Mohamad Sharif

    Predicting and optimizing production shot vibrations using time-shifting and superposition of signature hole waveforms (seed waves) has been widely used for many years. In this method, a single boreho

    Jan 26, 2026

  • ISEE
    Journal: A Public Relations Plan Based on Structure Generated Sounds and Public Input

    By Ken Eltschlager, J Silva Castro, J. M. Hoffman, Braden Lusk

    This case study focuses on analysis of sounds inside a house induced by blasts as result of surface mining coal in West Virginia and how to better communicate technical information to the public. The

    Jan 1, 2012

  • ISEE
    Modified Site Response Blasting: The Role of Rock Mechanics in Perimeter Control

    This paper is written in response to a request from the UTRC Committee on Perimeter Control Blasting. That Committee is conducting "follow-on" research on the selection of appropriate blasting designs

    Jan 1, 1984

  • ISEE
    Underground Blast Doors: Measured Pressure Drop and Human Exposure Safety

    By Matthew Hirsch, Jason Connot, Nathan Rouse, Srivatsan Jayaraman, Akash Adhikari, Brent Meins, Purushotham Tukkaraja

    The Deep Underground Neutrino Experiment (DUNE) is a world-class particle physics research project currently being constructed 4,850 ft, 1,478 m underground at the Sanford Underground Research Facilit

    Feb 6, 2023

  • ISEE
    Swedish Cautious Blast Excavation at the CSM/ONWI Test Site in Colorado

    By Roger Holmberg, William Hustrulid

    Swedish cautious blasting techniques were used to excavate a room at the CSM Experimental Mine in Idaho Springs, Colorado,as part of a ONWI/DOE sponsored nuclear waste disposal research program.

    Jan 1, 1981

  • ISEE
    Journal: History of ISEE – Timeline / 35 Years

    1974 The Society of Explosives Engineers officially formed to “advance the art and science of explosives engineering” on August 20, 1974 in Pittsburgh, Pennsylvania.

    Jan 1, 2010

  • ISEE
    Social Cost Benefit Analysis of Alumized ANFO

    By Gordon Lovegrove, Jeffrey Leob, Dwayne Tannant

    It has long been known that the combination of aluminum (AL) powder to ammonium nitrate (AN) / fuel oil (FO) can greatly enhance fragmentation or ultimately reduce the number of blast holes in a patte

    Jan 1, 2011

  • ISEE
    Controlling Fragmentation and Ground Vibrations at Owensville Quarry

    By Rachel Bauer, Jacob Henderson, Dr. Catherine Johnson

    Capital Quarries in Owensville, Missouri faces several challenges when designing a blast that allows for ease of movement while maintaining controlled throw and compliant air over pressure. The primar

    Feb 6, 2023

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Dr. Calvin J. Konya, Anthony Konya

    Beginning on the Niagara Power Project, presplitting became a widely used blasting technique to obtain smooth walls in mining and construction projects reducing scaling, creating more stable pits, all

  • ISEE
    Presplit Design Based on Borehole Pressures

    By Anthony Konya, Calvin J. Konya

    This paper will present this research which correlates the borehole pressure to variables such as the Young's Modulus and Tensile Strength of various rock types giving blast designers the ability to d

    Feb 1, 2020

  • ISEE
    Success Case: Technical and Operational Assurance of Blasting Near Neighboring Mine Structures

    By Hector O. Romero, Paulo C. Fernández A, Claudio C. Gajardo

    Phase 06 of the Los Bronces mine, currently under extraction for development, has the particularity of being close to the installations and buildings of a neighboring copper mine. Therefore, the blast

    Jan 21, 2025

  • ISEE
    How the USDA Uses Explosives to Remove Beaver Dams in Unique Locations

    By Bruce R. Leland, Steven H. Smith, John D. Paulson

    The USDA - Wildlife Services has been removing beaver dams with explosives for over 30 years. This paper will discuss the history of the explosives program, summarize how we've evolved, and highlight

    Feb 1, 2020

  • ISEE
    Driving Continuous Improvement Through Blast Design Technologies in a Surface Quarry

    By Toby Forney, Joshua Schoonover

    In typical surface quarry operations, productivity and efficiency related to pit development begin with drilling and blasting efforts. By embedding technology within drilling and blasting operations,

    Feb 6, 2023

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis A. Davidsavor, David A. Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

    Feb 1, 2020

  • ISEE
    A Method for Site-Specific Prediction and Control of Ground Vibration from Blasting

    By Andrew P. Ritter, James W. Reil, Douglas A. Anderson, Stephen R. Winzer

    We have developed a method for predicting and controlling ground vibration from blasting using a rigorous scientific approach. The method is based upon the superposition of seismic waveforms generated

    Jan 1, 1985

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis Davidsavor, David Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

  • ISEE
    Factors Governing the Muck Pile Characteristics

    By David Cheung, S. Paul Singh

    "The characteristics of a blasted muck pile can have a significant effect on the productivity and economyof loading and hauling operations. Poorly fragmented and tight muck piles, caused by insufficie

    Jan 1, 2017

  • ISEE
    Reducing Blast Vibration Amplitudes Close-In to Structures of Sub-Standard Construction

    By Enrique Munaretti, Cathy Aimone-Martin, Vitor Rosenhaim, Jair Koppe

    Production blasts at one of Copelmi’s coal mine operations will be carried out 100 m (330 ft) from a neighborhood located in the town of Butiá, southern Brazil. Mine management is concerned about the

    Jan 1, 2013