Ultimate Lateral Resistance of Piles in Cohesive SoilBy Lassaad Hazzar
The ultimate lateral resistance of piles in cohesive soil is studied using the well-known finite difference code, FLAC2D. The Modified Cam Clay (MCC) constitutive relation is adopted in the analyses t
Aug 1, 2013
-
Helix Deflection Effect on Load Settlement Behavior of Pile with Increasing Stress LevelBy Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"Previous studies revealed that the helix deflection reduced the end bearing capacity of screw pile in dense ground even if the installation process is completed with minimal soil disturbance. The ult
Jan 1, 2017
-
Analytical Method of Stone Columns Compared with an Analysis as Per Rowe Dilatancy TheoryBy Abhijit Saha
"Two analytical closed-form elastic-rigid-plastic solution methods to predict the rigid foundation behaviour on stone-column reinforced soil are compared, both of which takes into account the stone ma
Jan 1, 2015
-
Thermo-Mechanical Behavior of Energy Piles: Full-Scale Field Test VerificationBy Tracy Brettmann, Melis Sutman, C. Guney Olgen
"The use of energy piles for geothermal heat exchange has been steadily increasing during the last decade, yet there are still pending questions on their behavior during temperature changes. This pape
Jan 1, 2017
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) for Use During Drilled Shaft Construction (7493fc91-7396-4eac-bed2-0406570252cc)By Omer F. Usluogullari, C. Vipulanandan
"It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increa
Jan 1, 2017
-
Partnering And Technical Innovation Used To Stabilize Slurry Trench Walls Under Commuter Rail Station For Boston's Big DigBy Paul Pedini
The challenge of Contract C19E1 of Boston's Central Artery Project called for the construction of two roadways under the commuter rail yard at North Station. Two options were offered for the meth
Jan 1, 2002
-
Extra Deep Cut-Off at 250 m Depth - A Case StudyBy Federico Pagliacci
"Many existing dams are subject to underwater seepage due to subsoil conditions, like deep alluvial deposits or pervious rocks or karst. Remedial works are necessary in order to install new cut-off wa
Jan 1, 2017
-
Quality Control of Pile Installation Using Digital Pile Penetration and Rebound Monitoring SystemBy Hee-suk Yun, Dae-jin Hwang, Jeong-woo Seok, Myoung-mo Kim
"In this paper, the accuracy of the data measured by a newly developed displacement measuring system, DPRMs (Digital Pile Penetration and Rebound Monitoring system) and its applicability as a quality
Jan 1, 2005
-
30 Hudson Street Foundation Design and Construction in Variable RockBy Joel Moskowitz, George J. Tamaro
"A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140m by 100m, will include 4 basements under the entire footprint. The perimeter was to be s
Jan 1, 2004
-
Building a High-Rise Adjacent to Transit Tunnels in San Francisco (6bdbc52a-94a2-4c48-ba21-cc4450dc649d)By Lori A. Simpson, Linda H. Liang
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement. T
Jan 1, 2017
-
Building A High-Rise Adjacent To Transit Tunnels In San FranciscoBy Lori A. Simpson
A high-rise building, consisting of two tower structures occupying the entire site, is in construction in San Francisco. The North Tower will consist of 12 and 35 stories above a one-level basement.
-
Jet Grouting For Deep Excavation Support For Re-Entrant CornersBy Chu E. Ho
This paper reviews the design of jet grouting at re-entrant corners of excavations where the diaphragm wall and secant pile wall installation were interrupted by existing utilities in the streel sidew
May 1, 2022
-
Pile Foundation Solutions in the Deep Quaternary Sediments of Botany BayBy Paul A. O’Brien, Gary A. Chapman, Thomas G. Cuniowski
"The new Amcor B9 paper mill in Botany, NSW, Australia, involved the design and construction of a new paper mill founded within the Botany Basin Sediments. There were numerous design and construction
Jan 1, 1900
-
Designed, Load-Tested, And Installed Piles For A High-Rise Building In Southwest Florida - A Case History - SynopsisBy Anupam Saxena
This paper presents a case history of design, prediction, probe and production pile driving monitoring, loading test, and installation of piles for a 22-story condominium tower in southwest Florida, U
Jan 1, 1996
-
Innovative Soe Solutions For Shaft Construction: Getting To Depth With Diaphragm Walls At Westerly Storage TunnelBy Ryan Sullivan, Lisa Smiley, Jewels Stover
The Westerly Storage Tunnel (WST) Project is part of Project Clean lake, the North East Ohio Regional Sewer Dist years. When completed in 2020, WST will be nearly 2 miles of 25-ft diameter tunnel 200-
-
The Use of Thermal Integrity Profiling (TIP) to Verify the Integrity of Deep FoundationsBy Beim Jorge, Piscsalko George
"Verifying the quality of cast-in-place foundation applications, particularly those cast under slurry, is of course important, due to its great dependency on the methodology employed and on the practi
Jan 1, 2015
-
Hybrid Design Approach for Anchored Retaining Walls in Complex GeologyBy Christopher J. Ramsey, Don W. Dotson
"An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga
Jan 1, 2015
-
Helical Pile Foundations at Tangier Island SubstationBy Jeff Wilkinson, Brandon Walter
"A&N Electrical Cooperative provides electrical service to the counties of Accomack and Northampton along Virginia’s Eastern Shore and to Smith Island in Somerset County, Md.A&N recently worked to imp
Jan 1, 2017
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile MethodBy Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu
The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused
Jan 1, 2017