I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - CollapseBy Darrell L. Beddard
The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western
Jan 1, 1996
-
Specialized Slurry Wall Equipment - The Hydromill - SummaryBy Mario Mauro
The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l
Jan 1, 1994
-
Minipiles And Jet-Grouting: A Strong Foundation In Parma, ItalyBy Bruno Gemmi
The objective of the ? 200 million ($280 million) project Parma Railways Station-Urban Transformation was the reconnection of the North and South parts of the town by constructing an 80 m (250 ft) wid
Jan 1, 2011
-
-
Securing Rail Infrastructure in RomaniaBy Andreas Brandner
"At the beginning of 2007 the Austrian contractor PORR was awarded with remediation works for a 48-km long part of the railway line from Campina to Predeal – part of the Trans European main Corridors
Jan 1, 2017
-
Deep Foundations On Deer IslandBy Michael W. Oakland
Deer Island is the site of the Massachusetts Water Resources Authority (MWRA) wastewater treatment plant which, when completed in 1999, will serve 43 cities and towns in central eastern Massachusetts.
Jan 1, 1994
-
Copenhagen – Denmark Cityringen Metro Project: Innovative Solution for Deep Excavation in Complex Urban AreasBy Paolo Cavalcoli, Marco Ziller
"ABSTRACT: In the year 2010 the State of Denmark together with the Municipality of Copenhagen, launched a very important and complex Project : the complete construction of a new double Subway Line :th
Jan 1, 2014
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
Quality Assurance Of Augercast Piles With Computerized Monitoring - SummaryBy Bill Starke
The acceptance of AugerCast piles in Canada has been limited. Many engineers are apprehensive about the quality of the piles produced by this method. However, advances in the sensing instruments and c
Jan 1, 1997
-
PSEG Lawrenceburg Energy Facility Augered Cast -In-Place Piles Case HistoryBy Chris D. Shewmaker
So you want to install 2,600 augered cast-in-place piles, about 155,000 lineal feet, in 33 working days? It can be done. The Public Service Enterprise Group (PSEG) decided to build a combined cycle po
Jan 1, 2004
-
A Tale of Two Dams: Performance of Deep Cutoff WallsBy Donald Bruce, Mark Harris, Wesley Schmutzler, James Sanders
"This paper evaluates the history, construction and most importantly the performance of two remedial seepage cutoff walls installed in two major dams in the United States. Beaver Dam, on the White Riv
Jan 1, 2017
-
Test Pile Program To Determine Axial Capacity And Pile Setup For The Biloxi Bay BridgeBy W. Robert Thompson
Hurricane Katrina caused significant damage to transportation structures on the Gulf coast in August, 2005, including the destruction of the US 90 Bridge over Biloxi Bay, Mississippi. Part of the suc
Jan 1, 2009
-
Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven PilesBy James A. Schneider
Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin
Jan 1, 2009
-
Marine Foundation Retrofit For The Richmond - San Rafael BridgeBy Patrick E. Durnal
A joint venture of Ben C. Gerwick Inc., Sverdrup (now Jacobs) and DMJM (now DMJM Harris) designed the $779 mill seismic upgrade of the Richmond - San Rafael Bridge over the San Pablo Bay in the San Fr
Jan 1, 2013
-
Deep Foundation Solutions And Implementation For Pittsburgh International Airport Midfield Terminal ? 1.0 IntroductionBy Peter Florian
At 5:50 am on October 1, 1992, the new $800 million Pittsburgh International Airport Midfield Terminal opened its gates to the world after five years of construction and more than 24 years of planning
Jan 1, 1993
-
Large Diameter Machine Bored Piles In AustraliaBy W. J. Kingwell
Where the equipment, technique and materials are available for the construction of large diameter rock socketted piles, this is frequently the most economical and environmentally acceptable method of
Jan 1, 1989
-
Theoretical And Experimental Investigation On Underwater Ground AnchorsBy Leonello Sciacca
Deepening of harbours has become a priority, necessary to the ongoing operation of the wharves in the face of deeper draft merchant vessels and cruise ships. It is now standard practice in many areas
Jan 1, 2011
-
New York City - A Review Of Various Foundation Problems And Solutions - SynopsisBy Mel Febesh
Working in New York City has become the graveyard of many Foundation Contractors. Varying subsurface conditions require Foundation Contractors to be aware of the conditions at each particular site and
Jan 1, 2000
-
Design and Installation of Gudrun Platform Jacket PilesBy Gunhild Hennum, Tewodros Tefera, Gisle Håland, Annette Jahr
"Abstract The Gudrun field is located west of Stavanger in the North Sea at water depth of 109 m. A jacket substructure was selected to support the topside and was installed in 2011. The jacket shall
Jan 1, 2014
-
Site Solutions For The Pisa Tower Remediation - 1 - IntroductionBy Paolo Heiniger
The aim of this paper is to present the operative solutions devised and then adopted to implement the underexcavation (soil extraction) of the Tower of Pisa, by means of soil extraction. The inter