Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development of the Cigar Lake Jet Boring Mining Method

    By M. L. Wacker

    "Cigar Lake high-grade uranium mine in Saskatchewan is operating after 25 years of test mining, construction, and mine flood remediation. Factors include ground stability, groundwater control, radiati

    Jan 1, 2017

  • CIM
    Meadowbank Mine Process Plant Throughput Increase

    By J. Allaire, P. N. Muteb

    The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit

    Jan 1, 2013

  • CIM
    Assessing Vertimill Ultrafine Grinding Performance: The Gibraltar Mine Case

    By Keith Merriam, Jim McDonnell, Peter Radziszewski, Rob Rotzinger, Ian DeHart

    "Taseko Mines Limited Gibraltar copper-molybdenum mine recommenced operation in 2004 with the initiation of a series of development projects to increase throughput capacity as well as modernize the mi

    Jan 1, 2015

  • CIM
    "Linatex Dewatering Equipment in Selected North American Applications"

    By T. A. Kirk

    "The Linatex Dewatering System is a compact, low capital and maintenance cost matched set of processing equipment suitable for solids recovery, dewatering and desliming sand-like materials in the rang

    Jan 1, 1978

  • CIM
    Integrated Modelling of Subsidence Mechanisms and Impacts Due to Mine Caving

    By C. O?Connor

    With ever-increasing global demand for mineral resources, numerous mines are moving towards developing and mining deeper, more complex and lower grade ore bodies. In many cases, mass mining methods (e

    May 1, 2007

  • CIM
    MLA: The New Sherlock Holmes of the Mining and Metallurgical Engineering Industry

    By Paul Miranda, Corby Anderson

    "The Center for Advanced Mineral and Metallurgical Processing (CAMP) has recently obtained a Mineral Liberation Analyzer (MLA). CAMP has utilized the technology for several projects with excellent res

    Jan 1, 2007

  • CIM
    Lifter Design Using a DOE Approach with a DEM Charge Motion Model

    By Ian Orford, Peter Radziszewski, Lud Strah

    "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The AG mill was subsequently converted to SAG operation in May 1999 for a number of reasons. The mill ha

    Jan 1, 2003

  • CIM
    Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test Results

    By Linda C. M. Elliot, Liangxue Liu

    "The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On

    Jan 1, 1997

  • CIM
    Sophisticated Ring Geared Mill Drives Features and Experiences

    By Maarten van de Vijfeijken, Marco Rufli

    "By using the latest generation of medium voltage frequency converters, new possibilities have arisen to improve the grinding process. Beside all the direct and indirect advantages, several dedicated

    Jan 1, 2011

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    Corrosion Behaviour of Swellex Bolts in Underground Mining Environments

    By F. Charette

    The paper reviews recent investigations of the impact of corrosion on the performance of both plain and coated Swellex rock bolts. It addresses the problems associated with estimating and predicting c

    May 1, 2004

  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    Development of Oxidation Resistant Titanium Alloys by Niobium Addition

    By G. J. Ackland, K. Saksl, F. Brunke, M. Kohnke, B. Tegner, C. Siemers

    The application of titanium alloys is limited to 550°C due to their poor oxidation resistance. It is known that the addition of niobium decelerates the oxidation of titanium alloys whereas elements li

    Jan 1, 2014

  • CIM
    Abrasion and Wear in Mills: Use of Rubber and Plastics in Screening Applications and Wear in Mills

    By G. R. Brough

    "Today it is more important than ever to get the maximum possible return on capital invested in the processing industry. To this end the plant is often operated continuously and the choice of equipmen

    Jan 1, 1983

  • CIM
    Stereolithography, a Rapid Prototyping Technique for Orebody Modeling and Mine Design

    By Christopher P. O?Connor

    Stereolithography is a well known rapid prototyping technique in the manufacturing sector. Essentially it is a three dimensional printing process that produces plastic prototype parts from standard CA

    May 1, 2002

  • CIM
    Aluminum mine shaft conveyances at Inco Ltd. an overview of problems encountered and solutions

    By Richard Mcivor, Largo Albert

    "Inco Limited has operated aluminum mine shaft conveyances since 1968. Aluminum conveyances are used where the hoisting in system requires lightweight conveyances to maintain the hoist rope safety fac

    Jan 1, 1988

  • CIM
    Rubber Lining of Autogenous Mills at Sherman Mine

    By R. W. Watson, H. D. Peer

    "This paper outlines the history of steel linings in the Autogenous Mills, the factors influencing the decision to convert to rubber lining, and the operating and cost experience with the rubber liner

    Jan 1, 1981

  • CIM
    The G-9 Mine Story

    Overview ?G-9 Discovery Hole 420 drilled May 2005 ?14.16% Zn, 1.76% Cu ?Greenfield discovery built into the G-9 Mine in under 4 years. ?Utilized a unique ?Parallel Track? approach to fast-track min

    May 1, 2010

  • CIM
    The Ecstall Story: The Underground Mine .

    By John Ramsay, Frederick A. Edwards, J. Eric Belford, Clarence V. Amyotte

    "DEVELOPMENT of the underground mine is carried out from a main ramp driven from surface to the 800 and 1200 levels and from a shaft sunk to 3050 ft. Sub-levels at approximately 100-ft vertical interv

    Jan 1, 1974

  • CIM
    Grinding Circuit Final Grind Control at Agnico Eagle Meadowbank Mine

    By Pathies Nawej Muteb, Tom Strombotne, Karl Leetmaa, Irma Gabric, Keith Darby

    "Continuous control of the final grinding product size is important to optimize gold liberation for Gold Milling operations. At Meadowbank Mine an on-line Particle Size Monitor has been employed succe

    Jan 1, 2017