Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987

  • CIM
    Processing Nigerian Pyrolusite Ore, Part I: Characterization and Dissolution Kinetics Analysis

    By A. R. Sheik, A. A. Baba, M. K. Ghosh, K. Sanjay, R. B. Bale, A. G. F. Alabi, F. A. Adekola, L. Ibrahim

    "This paper studies the characterization and dissolution of a Nigerian pyrolusite ore, reporting the results of ore physicochemical analyses and detailed ore characterization before and after leaching

    Jan 1, 2016

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    An Empirical Approach to Charge Media Wear Prediction

    By Peter Radziszewski

    "Typical mining operating costs can be divided between extraction (30 % to 70 %), comminution (30 % to 50 %) and separation (5% to 20% ). Cornminition process costs, representing an important contribu

    Jan 1, 2000

  • CIM
    Developing a Unified Display Design for Mining Shovels

    By Andrew Chapman

    The scope of the SA (Situational Awareness) working group is to analyze the effectiveness of information delivery systems in mining equipment and develop a unified display design, to mitigate against

    Aug 1, 2013

  • CIM
    Petrology and alteration of the Siscoe Stock at the Siscoe Gold Mine, Val D'or, Quebec

    By Laszlo Imreh, Pierre Trudel, André C. Tessier

    "The Siscoe gold mine is ranked as the fourth largest mine in the history of the Val d' Or mining district with a total production of 27.4 tAufrom1929 to 1949. Most of the gold mineralization occurred

    Jan 1, 1990

  • CIM
    Comparision of Two Sizes of FSFs in the Glogów Copper Smelter

    By L. Garycki, P. Poks, R. Urbaniak, T. Gabka

    In 2016 at Głogów Copper Smelter KGHM Polska Miedź S.A., after shutting down the shaft furnaces new FSF was launched. Currently, it is the only smelter with two direct to blister flash smelting furnac

    Jan 1, 2019

  • CIM
    Cobre Panama

    By Ian D. Pirie

    Presentation outline ?Project location ?Geology ?Resources and reserves ?Results of the FEED study ?Social and environmental considerations ?Project path forward

    May 1, 2010

  • CIM
    The Link between Pulp Zone Hydrodynamic Characteristics and Froth Stability in a 125 m3 Flotation Column

    By D. Knuutila, G. Goyette, James A. Finch, G. Bartolacci, A. Fortin, Chi Ho Lau, A. Lockhart

    "In a COREM-McGill collaborative research and development project, gas dispersion parameters and froth properties were manipulated in a copper flotation plant to study interactions between the collect

    Jan 1, 2008

  • CIM
    Data integration for information technology infrastructure in mining

    By S. Dessureault, J. Porter, M. Woodhall

    Information and communication technology (ICT) is seen as a key source of future productivity improvements in mines. The information technology infrastructure (ITI) necessary to achieve these producti

    Jan 1, 2004

  • CIM
    Paleoproterozoic Age Relationships in the Three Bluffs Archean Iron Formation-Hosted Gold Deposit, Committee Bay Greenstone Belt, Nunavut, Canada

    By D. W. McDonald, L. M. Heaman, R. A. Creaser, T. Davies, T. Chacko, A. Simonetti

    "The Three Bluffs gold deposit is located in the Committee Bay greenstone belt, which forms part of the Rae domain of the western Churchill province, Nunavut, Canada. Gold mineralization is hosted by

    Jan 1, 2009

  • CIM
    Changing Company Culture

    By Frank B. Amon

    Highland Valley Copper had to make some significant changes in the way it was working in order to counter the effects of ever-increasing costs and decreasing metal prices. A mine/mill optimization pla

    May 1, 2004

  • CIM
    Throughput and Recovery Improvements Following Commissioning of the Mount Milligan Mine

    By P. Miranda, K. Le, G. Maes, R. Peters

    "The Mount Milligan Mine, owned by Thompson Creek Metals Company Inc. (TCM), started operations in September of 2013. It is located between the communities of Fort St. James and Mackenzie and is the f

    Jan 1, 2015

  • CIM
    The Recovery of Zinc and Lead from Blast-Furance Slag at Trail, B.C.

    By G. E. Murray

    Introduction The development of the method for recovering zinc from lead blast-furnace slags at Trail is interesting and important in the history of both lead and zinc metallurgy. Many efforts have

    Jan 1, 1933

  • CIM
    On-Line Mine ? A New Concept for Improving Mining Economy Through On-Line Mineral Analysis

    By Ilpo O. Auranen

    Background: Mines of today are moving ever increasing tonnages of rock. The new ore bodies tend be of lower grade and located deeper in the earth?s crust. The industry?s focus to overcome this ?deep

    Oct 1, 2009

  • CIM
    Geophysical Case Study of the Iso and New Insco Deposits, Québec, Canada, Part I: Data Comparison and Analysis

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "Abstract -A test survey using the MEGATEMII airborne electromagnetic system was flown over the Iso and New Insco massive sulfide orebodies in the Rouyn-Noranda mining camp, Canada. The results were c

    Jan 1, 2006

  • CIM
    Integrated Experimental and Thermodynamic Modelling Study of the Multicomponent “Cu2O”-FeO-Fe2O3-CaO-SiO2-PbO-ZnO-Al2O3 System

    By V. Prostakova, M. Shevchenko

    The copper smelting gas / slag / matte / metal / solids system with the Cu-Fe-Ca-Si-O-S major elements has been a long-term focus of the present overall research program using integrated experimental

    Jan 1, 2019

  • CIM
    The POP project (Process Optimization Project) The first applications: Barrick Gold / Est-Malartic; Agnico-Eagle / Laronde; Noranda / Matagami

    By Éric Létoumeau, Julie Fournier, Sylvain Caron, Yves Breau, Martin Plante, Dominique Girard, Luc Tardif, François Robichaud

    "Since 1999, COREM (formerly the Centre de Recherche Minérale) has conducted and coordinated research and development activities for a consortium of mining companies that uses the benefits and advanta

    Jan 1, 2002

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Noranda/Teniente Copper Bath Smelting Process Variations Impact on Energy Requirements

    By C. M. Díaz, P. J. Mackey, P. Coursol

    In a recent paper [1], the present authors discussed calculated energy consumption numbers in copper sulphide concentrate smelting for four different smelting technologies. For the present study, from

    Jan 1, 2011