Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond
"Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control
Jan 1, 2010
-
The Kumtor Gold Mill Start Up and Start up ChallengesBy John Kazakoff, Andrew Mortimore
"Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the
Jan 1, 1999
-
Effects of blasting on damage and grindability of impacted rockBy C. Pelley, S. Kelebek, G. Kunzel, S. Gregersen, M. Pollanen
A series of small-scale tests was conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushing and
Jan 1, 2006
-
Implementation of a Semi-Autogenous Grinding Circuit at the Brunswick ConcentratorBy Chris Larsen, Ian Orford, Mike Cooper
"An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The autogenous grinding circuit replaced existing surface crushing plants, fine ore storage, rod and pri
Jan 1, 2001
-
Innovative Mineral Processing Technologies – A First Decade of R&D at COREMBy Donald Leroux, Jean-François Wilhelmy, Ahmed Bouajila
"A young private R & D organization, COREM celebrated its 10th anniversary in 2009. Managed by a consortium of nine mining and metallurgical companies, COREM has the mandate of increasing the competit
Jan 1, 2010
-
Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and DesignBy Fidelis T. Suorineni
Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories
May 1, 2011
-
Waste dump management at Quintette Coal LimitedBy W. P. Tassie
"The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors
Jan 1, 1988
-
Environmental Factors Related to the Development of a New Uranium RefineryBy J. P. Jarrell
Environmental considerations are of increasing importance in determining the acceptability, schedule and cost of expansion ofCanada's uranium processing industry. Environmental considerations mus
Jan 1, 1979
-
Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory StudiesBy Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn
"The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven
Jan 1, 2000
-
A Fluid Inclusion and Stable Isotopic Investigation of the Boston Lode-Gold Deposit, Hope Bay Volcanic Belt, NunavutBy K. Muehlenbachs, J. U. Stemler
"Abstract - The Boston deposit is a recently discovered Archean lode-gold deposit located approximately 700 km northeast of Yellowknife, in the southern portion of the Hope Bay volcanic belt. Primary
Jan 1, 2006
-
On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic PlantBy Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon
"In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on
Jan 1, 2000
-
Starting Koala North ? North America?s First Underground Diamond MineBy Paul Harvey
Following initial discovery in 1991, BHP Billiton Diamonds Inc opened Canada?s first diamond mine, the Ekati Diamond Mine TM (Ekati) in the Northwest Territories on October 14th, 1998. Four short year
May 1, 2003
-
A Simple Estimation Method of Materials Handling Specific Energy Consumption in HPGR CircuitsBy A. G. Doll
"Multi-stage crushing plants, including high pressure grinding roll (HPGR) circuits, require more materials handling equipment than SAG and ball mill circuits. A temptation exists to neglect the energ
Jan 1, 2015
-
A Mathematical Model for the Prediction of Large Diameter Ball Consumption Rates in Semiautogenous Grinding ApplicationsBy J. E. Sepulveda, R. Morrow
"In full scale mineral grinding operations, the steel balls normally utilized as auxiliary grinding media get to be consumed at different specific rates, as determined by 3 basic mechanisms: abrasion/
Jan 1, 2015
-
Beneficiation of Marine Sands from Les Iles-De-La-MadeleineBy Alain Dorval
"''Purification of marine sands from Les Iles-de-la-Madeleine''This paper presents the results of the work that has been done at CRM pilot plant for «Les Silices du Golfe Inc.». Essentially the purpos
Jan 1, 1994
-
Diplomat MineBy J. Keith Haddock
"Introduction The Luscar company, Forestburg Collieries Ltd., operates the Diplomat Mine located 14 km south of Forestburg, Alberta. Production is now at a declining rate from the 1 million tonnes ach
Jan 1, 1985
-
Model of a DecisionA mathematical model of a decision is represented by the table in Figure 4. The numbers in the matrix are a measure of the effectiveness of each alternate for an objective. In this case, it is the per
Jan 1, 1964
-
Formulation and Plant Trial of a Mixed Collector Suite For Eland PlatinumBy Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula
"The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.
Jan 1, 2011
-
Probabilities in Estimating the Grade of Gold DepositsBy C. O. Swanson
CALCULATING the average grade of a gold deposit is a problem that presents certain unique difficulties. Particularly troublesome is the fact that the average of the samples taken from a deposit is lik
Jan 1, 1945
-
The Stillwater Paste Backfill PlantBy Frank Yu, Bob Fukuhara
"The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe