Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Asset Optimisation through Process Control at Xstrata Alloys – Eland Platinum ‘Optimal Doesn’t Always Rhyme with Capital’

    By Neo Molelekeng, Jocelyn Bouchard, Rebecca Monnapula, Martin Émond

    "Xstrata Alloys – Eland Platinum concentrator (South Africa) has recently been commissioned and is now initiating a challenging optimisation program encompassing the entire operation. Process control

    Jan 1, 2010

  • CIM
    The Kumtor Gold Mill Start Up and Start up Challenges

    By John Kazakoff, Andrew Mortimore

    "Production at the remote Kumtor Gold Mine in Kyrgyzstan commenced on schedule in December 1996.The ore mined during the first few months of 1997 from the upper benches of the pit did not produce the

    Jan 1, 1999

  • CIM
    Effects of blasting on damage and grindability of impacted rock

    By C. Pelley, S. Kelebek, G. Kunzel, S. Gregersen, M. Pollanen

    A series of small-scale tests was conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushing and

    Jan 1, 2006

  • CIM
    Implementation of a Semi-Autogenous Grinding Circuit at the Brunswick Concentrator

    By Chris Larsen, Ian Orford, Mike Cooper

    "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The autogenous grinding circuit replaced existing surface crushing plants, fine ore storage, rod and pri

    Jan 1, 2001

  • CIM
    Innovative Mineral Processing Technologies – A First Decade of R&D at COREM

    By Donald Leroux, Jean-François Wilhelmy, Ahmed Bouajila

    "A young private R & D organization, COREM celebrated its 10th anniversary in 2009. Managed by a consortium of nine mining and metallurgical companies, COREM has the mandate of increasing the competit

    Jan 1, 2010

  • CIM
    Stability of Pillars and Tabular Excavations under Shear Loading Conditions ? Implications for Mine Planning and Design

    By Fidelis T. Suorineni

    Rockbursts are a major hazard in deep hard rock underground mining and tunneling. To date a significant number of rockbursts still defy conventional explanations. A review of rockburst case histories

    May 1, 2011

  • CIM
    Waste dump management at Quintette Coal Limited

    By W. P. Tassie

    "The location of Quintette Coal Limited's pit and geologic nature of the dedicated reserves combine to introduce a number of factors which can adversely affect waste dump stability. These factors

    Jan 1, 1988

  • CIM
    Environmental Factors Related to the Development of a New Uranium Refinery

    By J. P. Jarrell

    Environmental considerations are of increasing importance in determining the acceptability, schedule and cost of expansion ofCanada's uranium processing industry. Environmental considerations mus

    Jan 1, 1979

  • CIM
    Development of a Two-Stage Middlings Circuit at Inco’s Clarabelle Mill Part 1: Laboratory Studies

    By Manqiu Xu, Glen Robertson, Steve Wilson, Pete Quinn

    "The middlings circuit, once called the pyrrhotite rejection circuit, at Inco’s Clarabelle mill was a single flotation stage. It used to process a combined feed consisting of the main flotation scaven

    Jan 1, 2000

  • CIM
    A Fluid Inclusion and Stable Isotopic Investigation of the Boston Lode-Gold Deposit, Hope Bay Volcanic Belt, Nunavut

    By K. Muehlenbachs, J. U. Stemler

    "Abstract - The Boston deposit is a recently discovered Archean lode-gold deposit located approximately 700 km northeast of Yellowknife, in the southern portion of the Hope Bay volcanic belt. Primary

    Jan 1, 2006

  • CIM
    On-Line Material Balance Calculation for Mass Flow Rate Estimation and Flotation Process Diagnosis an Application to Copper-Flotation Circuit at East-Malartic Plant

    By Dany Pelletier, Yeves Breau, Ahmed Bouajila, Claude Gagnon

    "In flotation circuits, direct measurement of the volumetric flow rate delivered by electromagnetic flowmeters is often difficult to obtain particularly due to piping and flow constraints. However, on

    Jan 1, 2000

  • CIM
    Starting Koala North ? North America?s First Underground Diamond Mine

    By Paul Harvey

    Following initial discovery in 1991, BHP Billiton Diamonds Inc opened Canada?s first diamond mine, the Ekati Diamond Mine TM (Ekati) in the Northwest Territories on October 14th, 1998. Four short year

    May 1, 2003

  • CIM
    A Simple Estimation Method of Materials Handling Specific Energy Consumption in HPGR Circuits

    By A. G. Doll

    "Multi-stage crushing plants, including high pressure grinding roll (HPGR) circuits, require more materials handling equipment than SAG and ball mill circuits. A temptation exists to neglect the energ

    Jan 1, 2015

  • CIM
    A Mathematical Model for the Prediction of Large Diameter Ball Consumption Rates in Semiautogenous Grinding Applications

    By J. E. Sepulveda, R. Morrow

    "In full scale mineral grinding operations, the steel balls normally utilized as auxiliary grinding media get to be consumed at different specific rates, as determined by 3 basic mechanisms: abrasion/

    Jan 1, 2015

  • CIM
    Beneficiation of Marine Sands from Les Iles-De-La-Madeleine

    By Alain Dorval

    "''Purification of marine sands from Les Iles-de-la-Madeleine''This paper presents the results of the work that has been done at CRM pilot plant for «Les Silices du Golfe Inc.». Essentially the purpos

    Jan 1, 1994

  • CIM
    Diplomat Mine

    By J. Keith Haddock

    "Introduction The Luscar company, Forestburg Collieries Ltd., operates the Diplomat Mine located 14 km south of Forestburg, Alberta. Production is now at a declining rate from the 1 million tonnes ach

    Jan 1, 1985

  • CIM
    Model of a Decision

    A mathematical model of a decision is represented by the table in Figure 4. The numbers in the matrix are a measure of the effectiveness of each alternate for an objective. In this case, it is the per

    Jan 1, 1964

  • CIM
    Formulation and Plant Trial of a Mixed Collector Suite For Eland Platinum

    By Norman O. Lotter, Dominic Fragomeni, Jorge Oliveira, Dee J. Bradshaw, Rebecca Monnapula

    "The role of mixed collectors in enhancing the metallurgical performance of sulphide flotation processes was reviewed in 2008, and later published as an integrated theory by Lotter and Bradshaw, 2009.

    Jan 1, 2011

  • CIM
    Probabilities in Estimating the Grade of Gold Deposits

    By C. O. Swanson

    CALCULATING the average grade of a gold deposit is a problem that presents certain unique difficulties. Particularly troublesome is the fact that the average of the samples taken from a deposit is lik

    Jan 1, 1945

  • CIM
    The Stillwater Paste Backfill Plant

    By Frank Yu, Bob Fukuhara

    "The Stillwater mine is a 3,000 tons/day platinum/palladium underground mine and flotation concentrator located in the Beartooth mountain range in south-central Montana. The site elevation is 5,000 fe

    Jan 1, 2000