Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Fixing the Foundations: Auditing the Internal Responsibility System

    Overview n Why we audited the IRS n How we did it n What we discovered n What we learned n Where we are going next The unbroken chain of safety The Internal Responsibility System (IRS) The n

    May 1, 2003

  • CIM
    CANMET'S thermodynamic ventilation network program

    By M. K. Gangal, M. A. Stoakes, A. E. Hall

    "The major features of the CANMET thermodynamic mine ventilation network program, developed by the Mining and Mineral Process Engineering Department of the University of British Columbia for the Canad

    Jan 1, 1982

  • CIM
    Ontario's industrial mineral industry: an overview

    By Ken Steele, Pam Sangster, Myra Gerow

    Ontario leads Canada in production of structural materials and ranks third in production of non-metallic minerals. The total value of industrial mineral production in 1997 was $1.6 billion. The provin

    Jan 1, 2001

  • CIM
    Mobile 3D Mapping for Surveying Earthwork using an Unmanned Aerial Vehicle (UAV)

    By Sebastian Siebert

    Unmanned Aerial Vehicles (UAV) as a data acquisition platform and as a measurement instrument have become attractive for many surveying applications in civil engineering. However, their performance is

    Aug 1, 2013

  • CIM
    Laboratory Tests of the Cleaning of Fine Coal by a D.S.M. Cyclone

    By T. E. Morimoto

    Summary The Research Council of Alberta has made a series of tests with the cyclone washer to investigate the influence of the following operating variables: underflow apex diameter, .specific gravit

    Jan 1, 1952

  • CIM
    Conflict Impact Assessment Between Objects in a BIM System

    By Yi-Chun Lin

    Mechanical/Electrical/Piping (MEP) systems, due to their complexity and diversity, are the most intricate part of building construction. This being the case, Combined Services Drawings (CSD) and Struc

    Aug 1, 2013

  • CIM
    Chapter 2. The Courts, the Law and Litigation

    By Karl J. C. Harries

    "2.1. INTRODUCTIONNo agreement can be perfect in the sense that it contemplates and provides for all eventualities. Mineral acquisition agreements are usually negotiated and drafted at a time when an

    Jan 1, 2003

  • CIM
    Management Of Contaminated Soil And Groundwater: A Perspective For The Chilean Copper Industry

    By A. Bezama

    For over a decade European countries have addressed contaminated sites by developing technologies for managing both polluted soil and groundwater. This development has not only been driven by health a

    Jan 1, 2007

  • CIM
    Advanced Blasting Technology for Large Scale Destress Blasts at Brunswick Mine

    By Qian Liu

    Mining in highly stressed ground conditions has been an increasing challenge at the Brunswick Mine. Two large regional pillars were established on the 1000 m Level to support the ground for safe extra

    May 1, 2003

  • CIM
    Design of Solution Heat Treatments for Aerospace Alloys

    By J. Beddoes

    Many high strength aerospace alloys undergo solution heat treatment (SHT) and aging to develop precipitate strengthening. Most simply, SHT involves an isothermal hold in a single phase region followed

    Jan 1, 2010

  • CIM
    Conveyor Hoisting at Steep Rock Iron Mines

    By E. H. Mulligan

    THE ERRINGTON B-I mine is located on the Errington orebody of Steep Rock Iron Mines, Limited, at Steep Rock Lake, Ontario. In 1946, this orebody entered the shipping lists of the Lake Superior iron ra

    Jan 1, 1956

  • CIM
    Underground Ore Haulage by Conveyor at the Sullivan Mine, Kimberley, B. C.

    By J. R. Giegerich

    Purpose It is the purpose of this paper to describe the application of underground conveyor systems to the transportation of ore in the Sullivan mine of The Consolidated Mining and Smelting Company o

    Jan 1, 1951

  • CIM
    Regional-Scale Paleoclimate Influences on a Proposed Deep Geologic Repository in Canada for low and Intermediate Level Waste

    By S. D. Normani

    A Deep Geologic Repository (DGR) for Low and Intermediate Level radioactive waste has been proposed by Ontario Power Generation for the Bruce Nuclear site in Ontario, Canada. The DGR is to be construc

    May 1, 2009

  • CIM
    Ironing Out the Process at Canadian Electrolytic Zinc

    By L. Rosato

    In the past decade, as a result of increasing iron loads, Canadian Electrolytic Zinc (CEZinc) has become a pioneer in understanding the critical factors that affect the roasting of concentrates with h

    Jan 1, 2006

  • CIM
    Methodology for Analyzing the Effects of Protective Measures for Falling Blocks in the Canton of Vaud, Switzerland.

    By C. Grisanti, E. Prina Howald

    The major of Swiss territory is occupied by mountains. Natural events as floods, debris flows, landslides, rockfalls, and avalanches regularly threaten the safety of people and properties. On the one

    Jan 1, 2015

  • CIM
    Solids Sampling at Australian Iron Ore Mine Sites (55a29317-25fd-4ddf-9f4c-115775e95e5b)

    By C. Matthews, A. Vo

    Australia is one of the world’s leading exporters of bulk commodities and the extensive use of sampling equipment is key to the successful management of each mining operation. At the process plant, wi

    Jan 1, 2019

  • CIM
    Hot Forging Process Simulation for Aerospace Aluminium Alloy Using a Modified Johnson-Cook Equation

    By A. Gakwaya, K. Ba, M. Guillot, J. Levesque

    "In the aerospace industry, parts requiring tight dimensional tolerances and high mechanical properties are often produced by forging. This forming process allows for an optimal use of the material an

    Jan 1, 2016

  • CIM
    Computer-assisted geological interpretation and orebody modelling

    By A. C. Moerman, C. W. Pelley, K. R. Notley

    "The software package described in this paper facilitates the handling of diamond drilling information in the creation and maintenance of a geological information database. Once entered, the drilling

    Jan 1, 1988

  • CIM
    Frozen fill for underground support

    By Jacques H. Nantel, James F. Archibald

    "Frozen tailings material may be required, in the future, to perform the support functions of underground backfill in mines located in zones of permafrost, notably in the high Arctic. To date, no know

    Jan 1, 1986

  • CIM
    The New Brunswick coal resource

    By F. D. Ball, D. E. Gemmell

    "Coal mining in New Brunswick dates from the year 1639, when, as today, coal was produced from the area surrounding Grand Lake near the geographic centre of the province. Current production by N.B. Co

    Jan 1, 1985