Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Combining Sources of Rock Mass Characterization Data for Stope Design

    By Karina Forster

    Open stope design depends on the ore body geometry, loading conditions and rock mass properties to estimate stope dilution and ground support requirements. Rock mass conditions for design primarily re

    Jun 1, 2012

  • CIM
    Qualification of Al-Cu Casting Alloys for Application in Permanent Mold Casting Processes

    By B. Tonn, F. Kröger

    "The continued development in engine technology is leading to an augmentation in power density which steadily elevates the requirements for thermally and thermo-mechanically highly loaded components s

    Jan 1, 2017

  • CIM
    Minto Copper-Gold Project IOCG or What?

    Sherwood?s Minto Project ? High grade copper copper-gold deposit ? Yukon Territory, Canada ? Development underway ? Permitted ? Production by mid mid-2007 ? 40 40-50m lbs Cu plus Au/Ag by by-pr

    May 1, 2006

  • CIM
    Dust Collection at The Carol Project, Iron Ore Company of Canada

    By H. Rozovsky

    This paper deals with the large iron ore concentrating plant owned by the Iron Ore Company of Canada. The plant is part of the Carol Project, which is being developed in the Wabush area of western Lab

    Jan 1, 1962

  • CIM
    Simulators for the Design, Optimization and Control of Gold Ore Processing Plants

    By L. R. P. de Andrade Lima, D. Hodouin

    The paper presents a survey of the possibilities of the simulation techniques for improving the design and operation of gold processing plants. The procedure to construct kinetic models that are used

    Jan 1, 2005

  • CIM
    Morphological Evolution of Solid Phase Particles of Hypoand Hyper-Eutectic Al-Si Alloys Sheared in the Semi-Solid State

    By F. Ajersch, A. R. Hekmat

    Apparent viscosities of hypo-eutectic (Al-7% Al) and hyper-eutectic (Al-35% Si) binary alloys were measured in the semi-solid state using a Couette type viscometer at variable shear rates. Analysis of

    Jan 1, 2006

  • CIM
    Copper Roast Segregation Process: A Promise to be Fulfilled and a Challenge for Material Handling Technology

    By A. del Campo A.

    The roast segregation process, which was patented in 1974, makes use of a set of chemical reactions that are different from the traditional sequential oxidation of iron and copper sulfides used by all

    Jan 1, 2007

  • CIM
    Gahnite Composition: Implications for Base Metal and Rare-element Exploration

    By A. Mcdonald, F. W. Breaks, T. F. Morris, S. A. Averill, D. C. Crabtree

    Abstract-Gahnite, a zinc-bearing spinel, is a resistate mineral that may be used as an indicator mineral of polymetallic deposits in high-grade metamorphic terrain. The Ontario Geological Survey recen

    Jan 1, 1997

  • CIM
    Gahnite Composition: Implications for Base Metal and Rare-element Exploration (c2ff5509-bb33-4f3c-9373-23967b4da416)

    By A. Mcdonald, F. W. Breaks, T. F. Morris, S. A. Averill, D. C. Crabtree

    Gahnite, a zinc-bearing spinel, is a resistate mineral that may be used as an indicator mineral of polymetallic deposits in high-grade metamorphic terrain. The Ontario Geological Survey recently compl

    Jan 1, 1997

  • CIM
    Modifications to the process gas handling system at Kidd Creek's copper smelter

    By C. J. Newman, R. J. St. Eloi, G. Macfarlane

    "The Kidd Creek copper smelter has been expanded from its original design of59000 tonnes of copper per year to over 120 000 tonnes per year. Modifications to the process gas handling system and acid p

    Jan 1, 1994

  • CIM
    Room-and-Pillar Mining at Devco?s Prince Mine

    By A. R. MacLean

    This mine is situated at Point Aconi, Cape Breton , Nova Scotia, and is a replacement for the 100-year-old Princess Collie ry. It is a slope mine which is the continuation of a s trip mine operation.

    Jan 1, 1978

  • CIM
    Geology of the Adams Mine

    By F. Dubuc

    "The Adams Mine of Jones & Laughlin Steel Corporation is situated on the Boston Township iron range near Kirkland Lake, Ontario. Eight different orebodies have been outlined, with a total open-pit cru

    Jan 1, 1966

  • CIM
    Fine Grinding Investigations at Lake Shore Mines (10a67995-9fcf-4997-9b1a-13fa03a556a1)

    By The Staff

    WE were requested to make a digest of our original grinding report, Fine Grinding Investigations at Lake Shore Mines. This digest is much easier to read than the original report, but it lacks the expe

    Jan 1, 1941

  • CIM
    Involving Communities And Measuring The Impacts

    By D. M. Aloi

    In today's evolving and globalized world, mining companies are being pressured to move beyond compliance towards long-term sustainability and sustainable development. Companies are expected to "e

    Jan 1, 2007

  • CIM
    Hydrometallurgy of Lead

    By F. Habashi

    Lead is an ancient metal, has been produced to-date from its ores exclusively by pyrometallurgical route. The process suffers from high operating cost and excessive pollution problems. Extensive resea

    Jan 1, 2008

  • CIM
    The Operation of a 30kt/A Copper L-Sx-Ew Plantproject in the DR Congo

    By Wei Wang

    The SMCO copper plant is located in DR Congo, and was designed by China NERIN Engineering Co., Ltd. The process is a typical hydrometallurgical plant with Leach-SX-EW, with the project treating the ox

    Jan 1, 2014

  • CIM
    -0.5mm High Sulfur Fine Coal Microwave Energy Absorption Performance and Electromagnetic Characteristics in the Magnetic Separation Desulfurization

    By Z. Luo, China University of Mining & Technology, C. Duan

    "The magnetic separation removal rate of pyrite could be improved effectively by increasing the susceptibility of pyrite. The electromagnetic characteristics and absorption response performance of hig

    Jan 1, 2016

  • CIM
    Observation of ore pass system performance at Brunswick mine (56ecacd0-ce74-4364-ac15-e3875a5d4671)

    By R. Harrisson, K. Esmaieli

    Brunswick mine employs an ore and waste pass system for material transfer. This paper reviews the evolution and performance of ore pass systems at the mine. It presents the range of selected configura

    Jan 1, 2008

  • CIM
    Operation of Falconbridge's new smelting process

    By G. E. Norman, A. L. Mckague

    "The new smelting process commenced operation in 1978. The pelletizing and sinter plants were replaced with slurry-fed roasters and the blast furnaces with electric furnaces. The existing converter ai

    Jan 1, 1984

  • CIM
    Cape Breton Development Corporation's experience with a tunnel-boring machine in coal measures

    By Dan Currie, Tom Lamb, J. Coady Marsh, Gary Landry

    "This paper describes the Cape Breton Development Corporation's experience with the Lovat M-300 tunnel-boring machine at the Donkin-Morien Mine. Between January 3 and December 21, 1984, the 7.6 m

    Jan 1, 1986