Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006

  • CIM
    POWERPLAY - Realizing Savings Through Energy Management

    By Andy Lemay

    Vale (previously known as CVRD) is: ? The second-largest mining company by market capitalization (NYSE:RIO) ? Headquartered in Brazil ? Global workforce of over 100,000 employees including outsourc

    May 1, 2008

  • CIM
    Kiena Maintains Up To Date Image with a New Gold Mill

    By R. Jolicoeur, J. F. Jackson, M. A. Green

    "The design, construction and commissioning of Kiena Gold Mines Limited's new mill was completed in 15 months ending in September 1984. Rated at 1250 tonnes per day the mill incorporates the latest in

    Jan 1, 1986

  • CIM
    Developments in at-Face/in-Pit Processing Technologies

    By Martin Stoklossa

    Surface mining operations typically require run-of-mine material to be sized for further processing. In-pit crushing facilities serve this need, as stationary, semi-mobile or fully mobile units. Altho

    May 1, 2008

  • CIM
    Development of a Vat Leach Process to Extract Gold from the Cochrane Hill Mine, Nova Scotia of Northumberland Mines Limited

    By P. D. R. Maltby

    "With the narrow vein structure of Nova Scotia gold deposits, selective mining is rarely possible and mill heads will be too low (below 0.10 oz per ton of gold) to support a conventional mill of up to

    Jan 1, 1984

  • CIM
    Implementation of Cyanidation by Size Class at Sleeping Giant Mill

    By Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon

    "This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres

    Jan 1, 2009

  • CIM
    Framework for optimizing components in an oilwell cement slurry design

    By D. Getzlaf

    "Oilfield cementing has been utilized in the industry since the turn of the century. Originally, wells were shallow and criteria for well integrity were somewhat limited. Since that time, wells have s

    Jan 1, 2004

  • CIM
    Environment Driven Innovation of Hydraulic Excavators

    By Axel Doelcken

    ?? Liebherr excavators in standard configuration are generally designed to operate in an ambient temperature range between -12°C and +55°C (10.4 °F and 131°F). ?? To operate effectively and efficient

    May 1, 2008

  • CIM
    Gold "Preg-Robbing" by Pyrite: Natural and Process Induced

    By Stephen L. Chryssoulis

    """Preg-robbing"" of gold by carbonaceous matter during the cyanidation of certain types of carbonaceous gold ores is well documented. Recent studies established that ""preg-robbing"" of gold is not l

    Jan 1, 1997

  • CIM
    Performance Characteristics of an Improved Flotation Mechanism

    By George A. Lawrence, J. C. McHardy

    "Field operating experience with an improved flotation mechanism for handling various flotation applications is covered in this paper. Some aspects of designing flotation machines are also presented.

    Jan 1, 1985

  • CIM
    Modern Welded Pipe Processes

    By A Palynchuk

    The development of welded pipe has paralleled the general industrial development and, in particular, that of the petroleum industry. The petroleum industry's need for high-grade, economical pipel

    Jan 1, 1964

  • CIM
    Flotation Column Scale-Up and Simulation

    By G. S. Dobby, J. A. Finch

    "I. INTRODUCTIONA significant development in flotation over the past few years has been the increasing industrial use of flotation columns, primarily in Canada. The column differs dramatically from co

    Jan 1, 1985

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    From Stabilization to Optimization; Process Control in the Flotation Process at Xstrata Nickel’s Strathcona Mill

    By Xing Jin, Dan Graffi, Glenn MacPherson, Dan Rioux

    "The complexity of a modern flotation circuit makes it susceptible to disturbances such as changes in feed, ore mineralogy, equipment degradation, poor measurements and faulty instruments. Good measur

    Jan 1, 2013

  • CIM
    Alkaline Pressure Oxidation Barrick Mercur Experience

    By P. T. O'Kane

    "INTRODUCTION Wright Engineers Limited is active and has extensive experience in the design of pressure oxidation plants for the treatment of refractory gold ore and concentrate. In addition to the Me

    Jan 1, 1989

  • CIM
    Establishing the Process Mineralogy of Gold Ores (7fd4ccc8-59f5-4574-a6a3-a04744804287)

    By Bruce Jago, Joe Zhou, Chris Martin

    "From the perspective of metallurgical processing, gold ores can be classified into free-milling and refractory ores. Their extractive metallurgy are largely driven by mineralogical factors such as: g

    Jan 1, 2004

  • CIM
    Pyrrhotite Rejection at Strathcona Mill - DETA/SMBS Plant Trials

    By J. Coffin, R. Multani, C. Deredin

    Glencore’s Strathcona Mill has recently evaluated a pyrrhotite depressant combination of diethylenetriamine (DETA) and sodium metabisulfite (SMBS) to improve its overall plant pyrrhotite- pentlandite

    Jan 1, 2019

  • CIM
    Biological Monitoring and its Use in the Mining Industry

    By S. W. Stogran

    "Chemical and limited biological monitoring of mine and mill effluents are being used by regulatory agencies to monitor and control discharges to the environment. Amendments to the Federal Fisheries A

    Jan 1, 1994

  • CIM
    Benefication of Low Grade Ore at the Detour Lake Mine

    "The Detour Lake Mine is located in northeastern, Ontario, approximately 300 kilometres northest of Timmins and 185 kilometres by road northeast of Cochrane. The mill processes a free milling gold or

    Jan 1, 2016

  • CIM
    Comminution Circuit Comparison Conventional versus Semi-Autogenous

    By G. H. Babcock, D. A. Knight, V. G. Medina

    "Production commenced at the Golden Sunlight Mine in 1983 and at Kidston Gold Mine in 1985. These projects were both constructed under the management of the Placer Dome Inc. (Technical Services) group

    Jan 1, 1991