Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Laboratory Studies on the Recovery of Some Cobalt MineralsBy Han Kook-Nam, Lawson F
The recoveries of the three cobalt minerals in the Mount Cobalt deposit, cobaltite CoAsS, erythrite CO3(AS04)8H20, and new cobalt mineral with a composition approximating 2CoO.CaO.Fe203.2As205.11H2O w
Jan 1, 1976
-
Differential Cut-Off GradesDetailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (
Jan 1, 2005
-
Reducing the Energy Required in Grinding Clinker to Cement – Some Case StudiesBy H Benzer
Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6
Aug 8, 2011
-
Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit MineBy N Johansson, D Johansson, A Beyglou, H Schunnesson
As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto
Aug 24, 2015
-
Modelling metal recovery by co-kriging the feed and concentrate masses of metalBy P Dowd, A Adeli, C Xu, X Emery
Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining
May 24, 2023
-
The MRMR Rock Mass Rating Classification System in Mining PracticeBy D H. Laubscher
The in situ rock mass rating system û IRMR - leading to the mining rock mass rating system - MRMR - for jointed rock masses has been used (and abused) in mining operations around the world for the pas
Jan 1, 2000
-
Evaluation of Underground Coal Mine Communication and Tracking SystemsBy C Harwood
Underground coal mines in the United States are in the process of completing installations for tracking and communication systems, mandated by Congress after a number of recent coal mine disasters. Ye
Nov 22, 2011
-
An Integrated Approach to Optimising All Concentrator Products, Including TailingsBy A Riles
"Three issues of relevance in a modern tailings storage facility (TSF) are:geotechnical stabilitymanaging acid rock drainage (ARD) from pyritic tailingsmanaging the tailings from cyanidation of gold o
Jun 15, 2016
-
Understanding Overlaps - Mining Tenure Versus the Rest of the WorldIt is a common misconception that the grant of mining tenure, whether it be an Exploration Permit, Mineral Development Licence or Mining Lease, will entitle the holder to access all land within it in
Jan 1, 2007
-
Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre ReinforcementBy R Winterberg
Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special
Mar 8, 2011
-
Mining Reconciliation in Long Hole Open Stopes at George Fisher MineBy J J. Grobler
The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified
Mar 21, 2011
-
Recommended Design Methods and Serviceability Limits for Permanent Rock BoltsBy D J Maconochie
The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with
Mar 8, 2011
-
Hydrogen reduction of Australia iron oresBy S Hapugoda, Y Tang, L Lu
The steel industry is one of the global leading CO2 emitters, accounting for approximately 7 per cent of global anthropogenic CO2 emissions. In 2022, the world produced 1878.5 Mt of crude steel. About
Sep 18, 2023
-
Team Alignment Towards Alternative Project Delivery MethodsProject delivery in our current market is not as efficient as it could be. Industry at large (both client and consultant), is diligently following the engineer, procure, construct, manage (EPCM) or en
Jan 1, 2009
-
The Use of Stable Isotopes of Oxygen, Hydrogen and Carbon to Understand Groundwater Dynamics in the Hamersley Basin, Western Pilbara Region, Northwest AustraliaBy W Dodson
Major ions, d18O and d2H and Carbon-13 concentrations in groundwater from 30 bores near an open pit iron ore mine were used to better understand the chemical evolution of groundwater in the aquifer. T
Jan 1, 2009
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Modelling and Design of Block Caving at Bingham CanyonOpen pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi
Jan 1, 2000
-
Variographic case study for designing, monitoring and optimising industrial measurement systems – the missing link in Lean and Six SigmaBy O Bøckman, E Thisted, K H. Esbensen, U Thisted
Process industry measurement systems, once installed, are often interpreted as static black boxes delivering correct values as long as not proven otherwise. After first implementation and set-up with
May 9, 2017
-
The Waihi Epithermal Gold-Silver Quartz Vein System, New Zealand: a High-Throughput Geothermal System of Late Miocene Age (194719d8-ed32-49b1-a277-cf211be8fca3)By Blattner P
The Late Miocene gold-silver bearing epithermal system at Waihi has some close similarities in its paleo-thermal and -geochemical structure with modern, volcanic-hosted geothermal systems such as Oha
Jan 1, 1995
-
Magnesia from Magnesite by Calcination/Carbonic Acid Leaching: Precipitation from Solution and Final Product RecoveryBy Moorrees C
Tests show how that temperature and rate of sparging to remove carbon dioxide determine the rate of precipitation and the chemical and physical properties of hydrated magnesium carbonates precipitated
Jan 1, 1985