Can a Risk-Based Evaluation Provide a More Valuable Mine Design?By B Maybee
In underground mine planning, many potentially value-eroding decisions are made due to a lack of time and proper evaluation practices. The information required for mine planning decisions goes beyond
May 24, 2012
-
Living with Change at South Bulli CollieryBy Ogilvie M
South Bulli is the oldest and largest underground coal mine in Australia. Two longwall units are in operation and current production is 2.5 to 3 million tonnes of run of mine product per year with a w
Jan 1, 1991
-
Some Recent Changes and Innovations at Mount Isa MineThe planned extraction of deeper copper ore at Isa Mine has necessitated a review of existing equipment and methods to contain costs and improve working conditions. Mining is in progress for a cru
Jan 1, 1984
-
Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York CityBy A Fareth
Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri
Jan 1, 2008
-
The Variation of Austenitic Grain Size with TemperatureThe variation of austenitic grain size with temperature for the steels XKSlSO and XK9261 was determined using the vacuum ctching technique.It is shown that the effect of temperature on the mean grain
Jan 1, 1967
-
Furnace Design for Modern, High-Intensity Pyrometallurgical ProcessesBy B, J Bianchini, N Voermann, C Crowe
Operational and economic imperatives in the metallurgical industry have led to numerous advancements in furnace design. Modern furnaces provide high production rates, high percentage online time, long
Jan 1, 2002
-
The Permeability of Coal to Mixtures of Methane and Carbon DioxideThe relationship between the permeability of coal to a mixture of methane and carbon dioxide, and the permeability to methane and carbon dioxide separately is described in this paper, along with the a
Jan 1, 1989
-
The Epithermal Au and Porphyry Cu (Au) Relationship in the Western Pacific and Central Europe (bacb76a9-dfc4-4704-8efd-2cd91a14adbe)By Carlie JC
Many low sulphidation epizonal gold and zinc-lead vein deposits within magmatic arcs are situated on basement highs, and post-date both the main volcanic episode and porphyry copper (gold) mineraliza
Jan 1, 1995
-
Production of Zinc in the Modernised Pasminco Metals - EZ Plant, Hobart TasmaniaBy Salmon P. T, Gilmour R
Commercial production of zinc started at the Pasminco Metals - EZ Plant, Hobart, Tasmania, in 1921. Since that time the capacity of the plant has been steadily increased to its present level of almo
Jan 1, 1993
-
The Fantastic Learning Experience that was the 2005 Atlas Copco Travel ScholarshipThis paper gives a first-hand account of what a graduate mining engineer can learn by visiting Atlas Copco in Sweden and gives reasons why all mining engineering students should apply for this excelle
Jan 1, 2006
-
The Application of Desktop Computers in Open Pit Mine PlanningBy Visnovsky
The computing needs of a mine planning office vary greatly depending on the staff available and the nature of the work undertaken. Some offices work acceptably with few aids apart from hand held c
Jan 1, 1983
-
Geological Units Common to Eastern Australia and New ZealandNew Zealand is an exposed part of a sub- continent that was detached from Australia when the Tasman Sea opened in the Late Cretaceous. The pre-separation rocks occur in three main belts. A western
Jan 1, 1987
-
Making Rectangular Tunnels with the Mobile MinerThroughout 1992 Pasminco conducted field trials of the Mobile Miner MM130 at Broken Hill. The goal was to develop the machine to achieve acceptable reliability and establish production rates.
Jan 1, 1993
-
Sirosmelt-The First Ten YearsBy Conochie DS
SIROSMELT is a successful new pyrometallurgi- cal furnace system using a top-entry lance which can be submerged in both slag and matte. The lance is of simple construction, and is cooled by process
Jan 1, 1984
-
Structural Permeability in the Southern Alps Hydrothermal System, New Zealand (b33e2a07-1d4d-4c30-8bdf-80361ff1f843)By Craw D
The Southern Alps in the South Island of New Zealand are currently rising rapidly as a consequence of continental collision along the Pacific-Australian plate boundary. Rapid uplift has resulted in a
Jan 1, 1995
-
Cyclone Smelting for Residues from Zinc Metal ProductionBy Melcher G
The challenge to the zinc industry is shifting from maximum metal recoveries to the environmentally safe processing of the ore concentrates. The main source of solid residues from hydrometallurgical
Jan 1, 1993
-
Experiences n the Development of an Operaor Guidance System for On-Line Process Control and Fault DiagnosisBy Jelenich L, Murray J. Rantanen J
The experience gained in the development of an Operator Guidance System (OGS) for on-line process control and fault diagnosis in a commercial scale sintering process will be discussed in this paper.
Jan 1, 1995
-
Large Open Pit Mining in Papua New GuineaLarge scale open pit mining at Ok Tedi and Misima are described in this paper. The paper also presents the socio-political problems encountered in the construction, operation and waste disposal of hig
Jan 1, 1992
-
Analysis of Lead/Zinc Concentrator Flotation Performance at Mount Isa Mines LimitedBy Watsford RMS, Wickham P
In October 1980 the two existing flotation circuits were combined into a single new circuit. This circuit used modern 11.3 m3 flotation cells which replaced 1.4 m3 units. Sometime after this change
Jan 1, 1978
-
Rehabilitation Planning For The Yallourn East FieldBy Brown K, Francis D
The Yallourn Open Cut Mine has recently commenced mining operations in the new East Field which will supply the 1450MW Yallourn W Power Station for the rest of its 30 year design life. The authors des
Jan 1, 1992