Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Increasing Throughput via Improved Automation - More Tonnes, More Quickly, from Existing Assets

    Existing production facilities are constantly looking at ways to increase capacity. Many recent solutions have focused on the implementation of capital and infrastructure projects. It is accepted that

    Jan 1, 2007

  • AUSIMM
    The Filblast Cyanidation Process

    By Bodnaras G. E, Sceresini P. A

    The Filblast Cyanidation Process incorporates the advantages of intense high shear mixing, high dissolved oxygen concentration and high pressure to achieve extremely rapid gold dissolution rates. Th

    Jan 1, 1994

  • AUSIMM
    New Technology in Hydrology and Erosion Assessment for Mine Rehabilitations

    By Gyasi-Agyei Y

    In recent years rapid advances have been made in the technology used for hydrology and erosion modelling of rural catchments. These advances have been driven by the growing availability of digital t

    Jan 1, 1995

  • AUSIMM
    A Three-Dimensional Simulation of Mine Ventilation Using Computational Fluid Dynamics

    By J Naser, M Tuck

    This paper reports a computational study using computational fluid dynamics (CFD) in a mine ventilation system. Ambient air is injected to a rectangular mine drive through a circular duct. Moisture ev

    Jan 1, 2005

  • AUSIMM
    Optimising a Combined Open Pit and Underground Strategic Plan

    By M Maulen, K van Olden, T Elkington

    A large open pit is planned at the site of an existing underground mine. Strategic planning work has been undertaken to investigate the project value associated with an expansion of underground operat

    Jan 1, 2009

  • AUSIMM
    Mining Operational Effectiveness ù A Large Open Pit Mine Case Study

    By M D. Kuruppu

    Fleet operational effectiveness is fundamental to any operation, becoming highly topical in mines experiencing less than optimal output from their fleets. It is an all encompassing aim to identify tho

    Jan 1, 2003

  • AUSIMM
    Planning and Designing Cavities for Underground Power House in Himalayas

    By Garg R. K

    Himalayan ranges on the northern border of India are source of many perennial rivers and suitable sites for large dams have been located therein. However, Himalayas are young mountains and compris

    Jan 1, 1987

  • AUSIMM
    Planning and Installation of the New Underground Winder (No. 2 Hoist) on the Rosebery Mine Inclined Shaft

    This paper traces briefly the reasoning which led to the decision to extend the existing internal shaft at the Rosebery Mine and to instal underground a larger winder (No. 2 Hoist) with capacity to ha

    Jan 1, 1958

  • AUSIMM
    Fluid Bed Roasting of Zinc Concentrate at Risdon, Tasmania

    Roasting of zinc concentrate at the Risdon Works of the Electrolytic Zinc Company of Australasia Limited, (E.Z.), is carried out in two fluid bed roasters capable of treating 450000 tonne/yr, or su

    Jan 1, 1977

  • AUSIMM
    A Model for Near-Field Blast Vibration Based on Signal Broadening and Amplitude Attenuation

    By D S. Scovira

    The effect of blast vibration on highwall stability is a common concern for many open pit mines. Vibration in such a case is a typical near-field blast vibration situation. Vibration modelling in the

    Jan 1, 2007

  • AUSIMM
    Flyrock Risk

    The issue of flyrock is critical to the operation of all mineral extraction sites that use blasting. This paper takes a risk-based approach to identifying, analysing and managing the flyrock hazard. T

    Jan 1, 2007

  • AUSIMM
    Beyond The Scheduling Horizon û Improving The Next Decade Æs

    It is usually the case that the short-term plannerÆs role is occupied by the younger site mining engineer. ThatÆs because mine scheduling is generally seen as a mundane and thankless task. But, short-

    Jan 1, 2003

  • AUSIMM
    Effect of Clay Rheology on Flotation of a Refractory Gold Ore

    By L Basnayaka, N Subasinghe, B Albijanic

    "It has been recognised that the presence of clay minerals in ores adversely affect flotation performance. In this study, changes in rheological properties of the flotation pulps under normal operatin

    Oct 10, 2016

  • AUSIMM
    Cost-Effective Native Revegetation on Alluvial Tin Mining Sites in the New England Region of New South Wales

    Tin mining has taken place in the New England region of New South Wales since 1872. Until fairly recent times there was little pro- vision made for environmental protection. Mining methods,which in

    Jan 1, 1987

  • AUSIMM
    An Underground Air Blast - Codelco Chile - Division Salvador

    By M Fishwick Tapia

    This paper was prepared and translated from the final report of the investigation into the Codelco Chile Salvador DivisionÆs air blast which occurred in the Inca-West area. In this section of the bloc

    Jan 1, 2000

  • AUSIMM
    A Non-Parametric Bayesian Framework for Automatic Block Estimation

    By A Melkumyan, F Ramos

    This paper addresses the problem of prediction of grade variables over volumes (block estimation) for an autonomous mine. Resource estimation is usually concerned with the prediction of the quality of

    Sep 26, 2011

  • AUSIMM
    Getting People Involved-or, Business and People Factors in Installing a Major On-Line Data Base Mining Operation System

    By Roberts JD

    The design and installation of a major on-line stores and purchasing system, with built-in maintenance reporting and plant register capabilities, needs more than just close attention to computer d

    Jan 1, 1983

  • AUSIMM
    Maintaining the Benefit - How to Ensure Mine to Mill Continues to Work for You

    By D La Rosa, W Valery, A Jankovic, S Ese

    Metso Minerals Process Technology Asia-Pacific (MMPT-AP) has been working with many mining companies worldwide performing æMine to MillÆ or Process Integration and Optimisation (PIO) studies. MMPT-AP

    Jan 1, 2007

  • AUSIMM
    A Simulation Model of the Waste Handling System Proposed for the Lihir Project in Papua New Guinea

    By Ritter K-C, Sturgul J. R, Filess T

    The proposed Lihir open pit gold mine is located on Lihir Island in New Ireland Province, Papua New Guinea. The mine will be located within a volcanic caldera, part of which forms the adjacent Luise

    Jan 1, 1995

  • AUSIMM
    Resource Classification ù A Case Study From the Joffre Hosted Iron Ore of BHP Billiton Æs Mt Whaleback Operations

    It is recognised by the current JORC (1999) code that resource classification involves the interaction of numerous qualitative and quantitative criteria such as data quality, geological continuity and

    Jan 1, 2002