Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sumps Aids The Broken Hill Proprietary Company Limited In Saxonvale Feasibility Study (4f6b06bb-7b16-41b9-9052-ce170d293140)

    By Kukla G. T

    A Seam deposit User oriented Mine Planning System (SUMPS) was developed by The Broken Hill Proprietary Company Limited (BHP) at its head office in Melbourne. It is one of the computer mine plannin

    Jan 1, 1980

  • AUSIMM
    Coobina Chromite Fines Plant û Designed on a Shoestring, Built in a Boom and Commissioned in a Bust

    Chromite ores have a long history of low pricing and for AustraliaÆs only chromite mine this has been a particularly tough challenge, especially as the mine is located nearly 400 km from the nearest p

    Jan 1, 2009

  • AUSIMM
    Hydrology of Final Void and Spoil Catchments

    Reliable predictions of the long-term water quality and water level fluctuations in a final void are vital if mine operators propose to decommission final voids in open cut mining operations. The catc

    Jan 1, 2003

  • AUSIMM
    The Role of Geomechanics in the Construction Phase of A Major Tunnelling Project

    Geomechanics is one of the more specialised aspects of site supervision on a major tunnell- ing project. The controlled deformation of a rock mass as a result of tunnelling and the knowledge of loa

    Jan 1, 1976

  • AUSIMM
    The Use of a Multiplate Arch on Skates to Gain Access Through a Major Collapse in the Rosebery Mine

    The Pasminco mine at Rosebery in north western Tasmania is a medium sized underground base and precious metals mine. In April 1992 a major wedge failure of approximately 5000 t occurred in the backs o

    Jan 1, 1993

  • AUSIMM
    Convergence Tectonics and Sediment Subduction Process Along the Peru Trench*

    Long-range side-scan sonar and conventional geophysical data for the Peru Trench region (8`S-15¦S latitude) have been analysed. The data show that the Peru Trench is a site of sediment subduction wher

    Jan 1, 1990

  • AUSIMM
    A Modern Approach to Methane Drainage Control and Utilisation

    By Moffatt G

    Approval to operate Longwall No. 7 at Appin Colliery in 1979 was granted pursuant not only to the usual statutory provisions, but also that an adequate means of drainage of methane gas be incorpora

    Jan 1, 1982

  • AUSIMM
    Voorspoed Diamond Mine - Challenges of Re-Opening a Historical Mine with an Inferred Resource

    The pyroclastic-filled Voorspoed kimberlite pipe has a low grade due to significant internal dilution which translates to a marginal business case. The site, with excavations, tailings dumps and build

    Jan 1, 2009

  • AUSIMM
    Mining Environmental Impacts Evaluation in a Karstic Zone using Geographical Information Systems

    Analysis of different environmental scenarios and to represent, spatially, of impacted areas is possible by the use of geoprocessing techniques, specifically Systems of Geographical Information (SIG).

    Dec 6, 2010

  • AUSIMM
    Investigation Techniques General Report

    Chief Geologist, Groundwater and Engineering Geology Branch South Australian Department of Mines and Energy The six papers submitted for consideration during this session include two dealing with te

    Jan 1, 1988

  • AUSIMM
    Water Quality Trigger Values for Suspended Mud in the Jabiluka Mine Receiving Catchment, NT, Australia

    By M J. Saynor, W D. Erskine an, D R. Moliere

    The Jabiluka uranium mine was constructed in the Ngarradj catchment, a right bank tributary of Magela Creek in the Northern Territory. The Jabiluka Mineral Lease is adjacent to Kakadu National Park, n

    Jan 1, 2004

  • AUSIMM
    An Update on Cave Development and Draw Control at the Henderson Mine

    By D S. Stewart, K W. Keskimaki

    The Henderson Mine has been utilising a continuous panel caving method to extract molybdenum ore since starting operation in 1976. In the past three decades since the mine was designed, many changes h

    Jan 1, 2000

  • AUSIMM
    Open Stope Mining Strategies at Brunswick Mine

    By P Andrieux

    By 1996 ground control-related problems at Brunswick Mine had raised serious concerns regarding the safe and economical extraction of large portions of the reserves. These difficulties were mainly cau

    Jan 1, 2000

  • AUSIMM
    Frasers Underground - From Technical Study to Production

    Oceana Gold CorporationÆs (OGC) Frasers underground (FRUG) transitioned into production in early 2008. The mine uses a relatively unique yielding pillars mining method that takes its lessons from empi

    Jan 1, 2009

  • AUSIMM
    Paleomagnetic Results from the Permian Brockstreet Terrane, South Island, New Zealand

    By Bruce P, Luyendyk

    The South Island of New Zealand comprises a collage of distinct tectonostratigraphic terranes. Some tectonic models predict that these terranes formed on or near the margin of Gondwanaland. However

    Jan 1, 1987

  • AUSIMM
    A personal review of South African rockburst research, experience and lessons learnt

    By T R. Stacey

    South Africa has a long history of rockbursts, some 100 years. During this time much research and many developments have taken place in the country to limit the occurrence of rockbursts, and to mitiga

    Nov 30, 2018

  • AUSIMM
    Design and Commissioning of the Sepon Copper Pressure Oxidation Circuit

    By A G. Pavlides, B L. Weekes

    The Sepon Copper Project is located in the Savannakhet Province of Laos PDR and is operated by Lane Xang Minerals Ltd (LXML). An Ausenco - Bateman Engineering joint venture, the Khanong Development Gr

    Jan 1, 2005

  • AUSIMM
    Drill Hole Logs Provide the Third Dimension for Minespoil Reclamation

    The establishment of vegetation onto open cut mine spoil is dependant on the nature of the soil and rock strata of the overburden. Experience has shown that in the Bowen Basin of Central Queenslan

    Jan 1, 1987

  • AUSIMM
    Microtunnelling Solution for Bulimba Creek Trunk Sewer

    By A Domanti, C Jewkes

    This paper describes the design and constructability issues investigated in the selection of a trenchless solution in comparison to trenched construction options as part of a scoping study for the aug

    Jan 1, 2008

  • AUSIMM
    Adding Copper Recovery and Acid Consumption Variables to the Geological Model of Quebrada Blanca

    By R Schiller, E Chait

    "Quebrada Blanca is a porphyry copper deposit located in the Eocene-Oligocene belt of Chilean Andes. Operation started in 1994 and original reserves for supergene mineralisation gave a life-of-mine (L

    Jun 15, 2016